Last Planner System (LPS) Themed Framework for Effective Application of Industrialized Building System (IBS)

被引:0
|
作者
Alaloul, Wesam Salah [1 ]
Heng, Lee Jian [1 ]
Qureshi, Abdul Hannan [1 ]
机构
[1] Univ Teknol PETRONAS, Dept Civil & Environm Engn, Seri Iskandar 32610, Perak, Malaysia
关键词
Prefabricated construction; Pre-cast construction; Industrialized building system; Last planner system; Malaysian construction industry; ANALYTIC HIERARCHY PROCESS; CONSTRUCTION; ISSUES;
D O I
10.1007/s13369-023-07793-x
中图分类号
O [数理科学和化学]; P [天文学、地球科学]; Q [生物科学]; N [自然科学总论];
学科分类号
07 ; 0710 ; 09 ;
摘要
The industrialized building system (IBS) is a modern technology that may advance the construction industry. In various domains, conventional construction methodologies are being replaced by IBS to meet growing market demand sustainably. The Malaysian government has successfully started implementing IBS in the public sector. However, the private sector is hesitant about its adoption. Last planner system (LPS) is a realistic way to collaboratively manage project-based production that involves trade foremen or design team leaders (the last planners) in planning in greater and greater detail as the time for the work to be done gets closer. This study identified the critical success factors (CSFs) of IBS adoption using a questionnaire survey distributed among the IBS stakeholders, contractors, consultants and academicians. After that, a conceptual framework was developed for adopting IBS in Malaysia based on the LPS via analytical hierarchy process. The results display the importance level of each CSFs by their criteria weight according to master planning, phase planning, make-ready planning, weekly planning and learning phase in LPS.
引用
收藏
页码:13377 / 13393
页数:17
相关论文
共 50 条
  • [31] Learning from breakdowns in the last planner system®
    Wilkinson, Bruce
    Lowe, Tony
    Pereira, Mauricio
    Lean Construction Journal, 2020, 2020 : 141 - 153
  • [32] A CAUSE OF COMMUNICATION FAILURE IN MANAGING INDUSTRIALIZED BUILDING SYSTEM (IBS) PROJECTS: A PERSPECTIVE VIEW FROM PROJECT MANAGERS
    Pozin, Mohd Affendi Ahmad
    Nawi, Mohd Nasrun Mohd
    Lee, Angela
    Yaakob, Mazri
    Hanafi, Mohd Hanizun
    INTERNATIONAL JOURNAL OF TECHNOLOGY, 2018, 9 (08) : 1523 - 1532
  • [33] Evolution of Malaysian Construction Industry: The "Symbiosis" between Industrialized Building System (IBS) and Teraju Precast Sdn Bhd
    Osman, Wan Nadzri
    Nawi, Mohd Nasrun Mohd
    Anuar, Herman Shah
    Yaakob, Mazri
    Radzuan, Kamaruddin
    PROCEEDINGS OF THE 4TH INTERNATIONAL CASE STUDY CONFERENCE (ICSC) 2019, 2019, : 234 - 242
  • [34] Management Thinking in the Earned Value Method System and the Last Planner System
    Kim, Yong-Woo
    Ballard, Glenn
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2010, 26 (04) : 223 - 228
  • [35] Forecasting the Performance of Last Planner System Implementation Using System Dynamics
    Osman, Hesham
    Hatem, Abi
    Bakry, Mohamed
    CONSTRUCTION RESEARCH CONGRESS 2020: PROJECT MANAGEMENT AND CONTROLS, MATERIALS, AND CONTRACTS, 2020, : 85 - 94
  • [36] Investigating conflicts of expert contractors using the last planner system in building information modeling process
    Amany, Adib
    Taghizade, Katayoon
    Noorzai, Esmatullah
    JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2020, 18 (06) : 1381 - 1402
  • [37] Integrating the Last Planner System and Immersive Virtual Reality: Exploring the Social Mechanisms Produced by Using LPS in Projects
    Liu, Canlong
    Gonzalez, Vicente A.
    Lee, Gaang
    Cabrera-Guerrero, Guillermo
    Zou, Yang
    Davies, Roy
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2024, 150 (07)
  • [38] A framework of initiatives for successful application of life cycle costing (LCC) in industrialised building system (IBS) in Malaysian construction industry
    Shamsuddin, Siti Mazzuana
    Zakaria, Rozana
    Hashim, Norfashiha
    Yusuwan, Norazian Mohamad
    Sahamir, Shaza Rina
    Abidin, Nur IzieAdiana
    6TH INTERNATIONAL CONFERENCE OF EURO ASIA CIVIL ENGINEERING FORUM (EACEF 2017), 2017, 138
  • [39] Industrialized building system - an innovative construction method
    Saggaff, Anis
    SRIWIJAYA INTERNATIONAL CONFERENCE ON ENGINEERING, SCIENCE AND TECHNOLOGY (SICEST 2016), 2017, 101
  • [40] Key requirements of an IT tool based on last planner® system
    Cortes, M. J.
    Herrera, R. F.
    Munoz-La Rivera, F. C.
    Avila-Eca de Matos, B.
    REVISTA INGENIERIA DE CONSTRUCCION, 2020, 35 (02): : 126 - 134