共 50 条
- [41] Efficient Heuristic Solution Methodologies for Scheduling Batch Processor with Incompatible Job-Families, Non-identical Job-Sizes and Non-identical Job-Dimensions ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: TOWARDS SMART PRODUCTION MANAGEMENT SYSTEMS, APMS 2019, PT II, 2019, : 212 - 222
- [43] A heuristic for a batch processing machine scheduled to minimise total completion time with non-identical job sizes The International Journal of Advanced Manufacturing Technology, 2004, 24 : 615 - 620
- [44] A heuristic for a batch processing machine scheduled to minimise total completion time with non-identical job sizes INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2004, 24 (7-8): : 615 - 620
- [49] A Mathematical Model for Scheduling a Batch Processing Machine with Multiple Incompatible Job Families, Nonidentical Job dimensions, Non-identical Job sizes, Non-agreeable release times and due dates 2013 INTERNATIONAL CONFERENCE ON MANUFACTURING, OPTIMIZATION, INDUSTRIAL AND MATERIAL ENGINEERING (MOIME 2013), 2013, 46
- [50] Minimizing the total completion time on a single batch processing machine with non-identical job sizes using ant colony optimization ICIEA 2008: 3RD IEEE CONFERENCE ON INDUSTRIAL ELECTRONICS AND APPLICATIONS, PROCEEDINGS, VOLS 1-3, 2008, : 2211 - 2215