Investigation into the Large Deformation Mechanism and Control Technology of Variable Cross-Section Tunnel in Layered Mudstone Stratum

被引:5
|
作者
Fan, Shengyuan [1 ,2 ]
Song, Zhanping [1 ,2 ]
Li, Xu [1 ,2 ]
Zhang, Yuwei [1 ,2 ]
Liu, Lianbaichao [1 ,2 ]
机构
[1] Xian Univ Architecture & Technol, Sch Civil Engn, Xian 710055, Peoples R China
[2] Shaanxi Key Lab Geotech & Underground Space Engn, Xian 710055, Peoples R China
基金
中国国家自然科学基金;
关键词
variable cross-section tunnel; deformation; lining cracking; reinforcement; monitoring; LARGE UNDERGROUND CAVERNS; SOFTENING ROCK MASS; FAILURE-MECHANISM; CIRCULAR TUNNEL; CONSTRUCTION; EXCAVATION; DESIGN; PARAMETERS; STABILITY; DAMAGE;
D O I
10.3390/buildings13010110
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Buildings (structures) with various structural forms are becoming increasingly prevalent and are encountering more challenging engineering issues. Field investigations, laboratory tests, and numerical simulations were used to study the disaster-causing mechanism and the control technology for a variable cross-section tunnel passing through layered, expansive mudstone stratum. The deformation and stress characteristics of the surrounding rock and supporting structure were examined by both numerical simulation and field monitoring. The results indicated that the stress was more complex at different section positions; the rock and supporting structure underwent substantially more deformation and stress in the broadened sections. The mean values of the surrounding rock's horizontal convergence and vault settlement in the broadened section were 15.71% and 16.36% higher than those in the general section, respectively, and the value of lining stress was 35.51% higher. Additionally, the simulation results under the improved construction measures matched the measured results. The maximum deformation and stress of the surrounding rock were reduced by 16.95% and 40.04%, respectively, under the improved scheme, while the lining stress was reduced by 45.38%. The stress state of the secondary lining was significantly improved; in particular, the tensile stress in the lining structure under the original construction scheme was converted into a compressive state under the new measures, fully utilizing the bearing effect. Finally, the rationality and effectiveness of the adopted reinforcement measures were evaluated, and the experiences and lessons learned were summarized to provide insights for preventing similar incidents from reoccurring.
引用
收藏
页数:19
相关论文
共 50 条
  • [41] STRUCTURAL CONTROL OF A VARIABLE CROSS-SECTION BEAM BY DISTRIBUTED FORCES
    SADEK, IS
    BRUCH, JC
    SLOSS, JM
    ADALI, S
    MECHANICS OF STRUCTURES AND MACHINES, 1989, 16 (03): : 313 - 333
  • [42] Developing a Technology For The Automated Manufacturing of Composite Products With a Variable Cross-Section
    Ignatov, Alexey Vladimirovich
    Subkhankulov, Rustam Maratovich
    XLIV ACADEMIC SPACE CONFERENCE: DEDICATED TO THE MEMORY OF ACADEMICIAN S.P. KOROLEV AND OTHER OUTSTANDING RUSSIAN SCIENTISTS - PIONEERS OF SPACE EXPLORATION, 2021, 2318
  • [43] Numerical study on the smoke control using point extraction strategy in a large cross-section tunnel in fire
    Yan, Zhiguo
    Zhang, Yuxin
    Guo, Qingchao
    Zhu, Hehua
    Shen, Yi
    Guo, Qinghua
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2018, 82 : 455 - 467
  • [44] Construction Mechanical Mechanism of Shallow Subway Tunnel Group with Large-Span Variable Cross Section
    Wu K.
    Yu Y.
    Cui S.
    Zhang Q.
    Geotechnical and Geological Engineering, 2018, 36 (6) : 3879 - 3891
  • [45] Investigation on the improved absolute nodal coordinate formulation for variable cross-section beam with large aspect ratio
    Yu, Xiangjie
    You, Bindi
    Wei, Cheng
    Gu, Haiyu
    Liu, Zhaoxu
    MECHANICS OF ADVANCED MATERIALS AND STRUCTURES, 2024, 31 (14) : 3126 - 3137
  • [46] Failure mechanism of deep-buried and large cross-section subway station tunnel: Geo-mechanical model test and numerical investigation
    Gao, Deng
    Shen, Yusheng
    Zhou, Pengfa
    Gou, Andi
    Chang, Mingyu
    Dong, Jun
    Wu, Kang
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2025, 155
  • [47] Stability evaluation model for the tunnel face of large cross-section tunnel excavated by the bench method
    Man, Jianhong
    Huang, Hongwei
    Dias, Daniel
    Wang, Feiyang
    Chen, Jiayao
    COMPUTERS AND GEOTECHNICS, 2024, 170
  • [48] Stability evaluation model for the tunnel face of large cross-section tunnel excavated by the bench method
    Man, Jianhong
    Huang, Hongwei
    Dias, Daniel
    Wang, Feiyang
    Chen, Jiayao
    Computers and Geotechnics, 2024, 170
  • [49] Visualized investigation of subcooled boiling in variable cross-section fin channels
    Li J.
    Zhu Z.
    Peng H.
    Li J.
    Ling X.
    Ling, Xiang (xling@njtech.edu.cn), 2018, Materials China (69): : 2404 - 2409
  • [50] Research on intelligent cutting control technology of transverse moving machine for large cross-section roadheader
    Qin, Wenguang
    Cheng, Kai
    Wang, Biao
    JOURNAL OF VIBROENGINEERING, 2024, 26 (08) : 1836 - 1860