A Dynamic Model for Effective and Optimal Planning of Formwork in Construction Projects

被引:2
|
作者
Baskova, Renata [1 ]
Tazikova, Alena [1 ]
Strukova, Zuzana [1 ]
Kozlovska, Maria [1 ]
Cabala, Jozef [1 ]
机构
[1] Tech Univ Kosice, Inst Technol Econ & Management Construct, Fac Civil Engn, Kosice 04200, Slovakia
关键词
formwork; concrete structure; modeling; cost of formwork; construction time;
D O I
10.3390/buildings13071794
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The cost of producing one cubic meter of concrete structure, depending on the structure's shape, type, and complexity, can be variously high. The cost of concrete, reinforcement, formwork, and labor ratio varies. But unlike the cost of concrete and reinforcement, which tend to be similar in the terms of the conditions of a particular construction project, the cost of formwork and work with it are different for different contractors. It often depends on the appropriateness of the formwork system used, the optimal placement of the formwork sets, the minimization of downtime, and the efficiency of the carpenters' work. Formwork modeling in the construction preparation phase intervenes in this planning area, where construction sources are defined and quantified, and the time course of their deployment is determined. The current paper deals with optimizing formwork selection and deployment in concrete structure execution. Even if several requirements must be considered when selecting and modeling the formwork (e.g., construction time, quality of concrete structure, etc.), an effort to minimize the cost of formwork, and thus construction cost, plays the most significant role. A dynamic model for effective and optimal planning of formwork in construction projects, including formwork cost analysis, is presented in the paper. The included case study demonstrated the planning of the formwork through a software application developed based on the computational algorithm of the dynamic model presented. A case study is presented in the article as a research method. An office building with five above-ground floors and one underground floor was chosen for the case study. To solve the case study, the formwork for horizontal structures (i.e., beams and slabs) is considered. The goal of the case study is to identify research questions and apply time and cost optimization to a selected specific building.
引用
收藏
页数:20
相关论文
共 50 条
  • [41] Material supply planning and management model for social housing projects in a construction company
    Robles, C.
    Rangel, E.
    Sanchez, N.
    REVISTA INGENIERIA DE CONSTRUCCION, 2022, 37 (02): : 185 - 200
  • [42] Optimal dynamic portfolio selection for projects under a competence development model
    Gutjahr, Walter J.
    OR SPECTRUM, 2011, 33 (01) : 173 - 206
  • [43] Formwork System Selection Criteria for Building Construction Projects: A Structural Equation Modelling Approach
    Terzioglu, Taylan
    Polat, Gul
    Turkoglu, Harun
    BUILDINGS, 2022, 12 (02)
  • [44] Optimal dynamic portfolio selection for projects under a competence development model
    Walter J. Gutjahr
    OR Spectrum, 2011, 33 : 173 - 206
  • [45] Optimal construction project planning
    AbouRizk, S
    Mohamed, Y
    PROCEEDINGS OF THE 2002 WINTER SIMULATION CONFERENCE, VOLS 1 AND 2, 2002, : 1704 - 1708
  • [46] NOTE ON DYNAMIC PLANNING OF INVESTMENT PROJECTS
    SHECHTER, M
    HAMMER, PL
    EUROPEAN ECONOMIC REVIEW, 1970, 2 (01) : 111 - 121
  • [47] Dynamic risk analysis in construction projects
    Nasirzadeh, Farnad
    Afshar, Abbas
    Khanzadi, Mostafa
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 2008, 35 (08) : 820 - 831
  • [48] The application of dynamic alliance in construction projects
    Ren, WW
    PROCEEDINGS OF THE 12TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1 AND 2: MODERN INDUSTRIAL ENGINEERING AND INNOVATION IN ENTERPRISE MANAGEMENT, 2005, : 1262 - 1267
  • [49] The sustainability of human resource planning for construction projects
    Ashiru, Adegbenga Raphael
    Ashiru, Adebimpe Lucia
    INTERNATIONAL CONFERENCE ON SUSTAINABLE CIVIL ENGINEERING STRUCTURES AND CONSTRUCTION MATERIALS (SCESCM 2018), 2019, 258
  • [50] THE METHODOLOGY OF RISK ASSESSMENT IN THE PLANNING OF CONSTRUCTION PROJECTS
    Szafranko, Elzbleta
    PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE CONTEMPORARY ISSUES IN THEORY AND PRACTICE OF MANAGEMENT: CITPM 2016, 2016, : 430 - 437