共 50 条
- [42] An asynchronous simulation algorithm for post-earthquake functional recovery of interdependent infrastructure systems EARTHQUAKE ENGINEERING & STRUCTURAL DYNAMICS, 2024, 53 (02): : 529 - 544
- [43] A REVIEW OF POST-EARTHQUAKE BUILDING CONTROL POLICIES WITH RESPECT TO THE RECOVERY OF THE CHRISTCHURCH CBD BULLETIN OF THE NEW ZEALAND SOCIETY FOR EARTHQUAKE ENGINEERING, 2012, 45 (03): : 105 - 116
- [44] Recovery from post-earthquake psychological morbidity: who suffers and who recovers? AUSTRALIAN AND NEW ZEALAND JOURNAL OF PSYCHIATRY, 1998, 32 (01): : 15 - 20
- [49] Examining the Role of Craft in Post-Earthquake Recovery: Implications for Social Work Practice BRITISH JOURNAL OF SOCIAL WORK, 2015, 45 : 205 - 220