An improved risk priority number model for FMEA based on belief measure

被引:2
|
作者
Tang, Yongchuan [1 ]
Tan, Shiting [2 ]
Zhou, Ying [3 ]
Huang, Yubo [4 ]
Zhou, Deyun [1 ,3 ]
机构
[1] Northwestern Polytech Univ, Sch Microelect, Xian 710072, Shaanxi, Peoples R China
[2] Chongqing Univ, Sch Comp Sci, Chongqing 401331, Peoples R China
[3] Northwestern Polytech Univ, Sch Elect & Informat, Xian 710072, Shaanxi, Peoples R China
[4] Univ Warwick, Sch Engn, Coventry CV4 7AL, W Midlands, England
关键词
Failure mode and effects analysis; risk priority number; belief Jensen-Shannon divergence measure; Dempster-Shafer evidence theory; uncertainty management; FAILURE MODE; DECISION-MAKING; ENTROPY; UNCERTAINTY;
D O I
10.1109/CCDC58219.2023.10326506
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Decision making under uncertainty in risk analysis is a key issue in practical engineering. The risk priority number (RPN) model in failure mode and effects analysis (FMEA) is a widely used tool for ranking of risk items. However, there are limitations in the traditional RPN model. For example, it cannot represent the subjective or inaccurate judgements coming from FMEA experts. In addition, the uncertainty in the assessments of experts in FMEA item is not modelled and transformed to the RPN values. In this paper, a new risk priority number model based on belief Jensen-Shannon divergence measure and Deng entropy in Dempster-Shafer evidence theory is proposed. In the proposed method, the belief Jensen-Shannon divergence measure is adopted to effectively deal with the fuzziness and abnormal adjustment coming from all the FMEA experts. In addition, Deng entropy is used to quantify the uncertain degree of each expert and the result is modelled as a relative importance degree of expert. Dempster's combination rule is used to fuse experts' assessments of different failure modes to generate the integrated values of each risk factor. The rationality, superiority and effectiveness of the proposed RPN model are verified based on a case study of a production process in steel industry.
引用
收藏
页码:3940 / 3945
页数:6
相关论文
共 50 条
  • [31] Risk Analysis of Digital Twin Project Operation Based on Improved FMEA Method
    Li, Longyu
    You, Jianxin
    Xu, Tao
    SYSTEMS, 2025, 13 (01):
  • [32] Use-related risk analysis for medical devices based on improved FMEA
    Liu, Long
    Ma, Shuai
    Wang, Zhu
    Li, Ping
    WORK-A JOURNAL OF PREVENTION ASSESSMENT & REHABILITATION, 2012, 41 : 5860 - 5865
  • [33] Risk Priority Number for Bridge Failures
    Putcha, Chandrasekhar
    Dutta, Subhrajit
    Rodriguez, Jessica
    PRACTICE PERIODICAL ON STRUCTURAL DESIGN AND CONSTRUCTION, 2020, 25 (02)
  • [34] Risk Priority Number vs Action Priority in Electrical Systems
    Petrescu, Lucian
    Petrescu, Maria-Catalina
    Cazacu, Emil
    Ionita, Valentin
    2021 12TH INTERNATIONAL SYMPOSIUM ON ADVANCED TOPICS IN ELECTRICAL ENGINEERING (ATEE), 2021,
  • [35] IMPROVED BELIEF PROPAGATION WITH ISTINCTIVENESS MEASURE FOR STEREO MATCHING
    Geng, Yingnan
    Wang, Xiuyan
    PROCEEDINGS OF 2016 5TH IEEE INTERNATIONAL CONFERENCE ON NETWORK INFRASTRUCTURE AND DIGITAL CONTENT (IEEE IC-NIDC 2016), 2016, : 491 - 494
  • [36] An improved multisource data fusion method based on a novel divergence measure of belief function
    Liu, Boxun
    Deng, Yong
    Cheong, Kang Hao
    ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2022, 111
  • [37] An Improved Method for Combining Conflicting Evidences Based on the Similarity Measure and Belief Function Entropy
    Xiao, Fuyuan
    INTERNATIONAL JOURNAL OF FUZZY SYSTEMS, 2018, 20 (04) : 1256 - 1266
  • [38] An Improved Method for Combining Conflicting Evidences Based on the Similarity Measure and Belief Function Entropy
    Fuyuan Xiao
    International Journal of Fuzzy Systems, 2018, 20 : 1256 - 1266
  • [39] Risk Identification of FPSO Oil and Gas Processing System Based on an Improved FMEA Approach
    Wang, Longting
    Sun, Liping
    Kang, Jichuan
    Wang, Yanfu
    Wang, Haiqing
    APPLIED SCIENCES-BASEL, 2021, 11 (02): : 1 - 19
  • [40] Construction risk assessment of green transformation of old industrial plants based on improved FMEA
    Wu Qian
    Sun Min
    Li Na
    Sun Mengqi
    Geng, Jing
    2020 3RD INTERNATIONAL CONFERENCE OF GREEN BUILDINGS AND ENVIRONMENTAL MANAGEMENT, 2020, 531