Integrative approach for optimizing construction and demolition waste management practices in developing countries

被引:0
|
作者
Abulebdah, Abeer [1 ]
Musharavati, Farayi [1 ]
Fares, Enas
机构
[1] Qatar Univ, Dept Mech & Ind Engn, POB 2713, Doha, Qatar
来源
SUSTAINABLE ENVIRONMENT | 2024年 / 10卷 / 01期
关键词
Waste management; construction and demolition waste (C&DW); geographic information system (GIS); waste flow dashboard; fuzzy analytical hierarchy process (F-AHP); optimization; MODEL; SUSTAINABILITY; TECHNOLOGIES; METHODOLOGY; GENERATION; BUILDINGS; CONCRETE; REGION; QATAR;
D O I
10.1080/27658511.2024.2319905
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Due to the numerous infrastructure development projects taking place in developing nations, large amounts of construction and demolition waste (C&DW) are unavoidable. Most C&DW management strategies, however, involve 'isolated' operations with high overhead. Waste data transfers are difficult to watch over. Important information needed for decision-making is, therefore, challenging to obtain. This paper's goal is to discuss C&DW management from an integrative standpoint. Using GIS functions and a fuzzy analytical hierarchy approach, the best sites for waste management facilities can be found. A mixed integer optimization model is created to identify optimal location and allocation of waste management facilities. The objective is to reduce waste collection costs under different operational scenarios. By incorporating 'constructs elements' and 'connected elements' that are linked, isolated C&DW management ventures are transformed into successful C&DW management ventures. The effectiveness and efficiency of waste management strategies are evaluated using GIS analysis. A dashboard for tracking waste data flows is created to show how stakeholder decision making can be made easier. The proposed integrative approach differs from other approaches since it re-purposes location-allocation models and GIS data to optimize 'isolated' C&DW management practices. In addition, the notion of 'construct elements' that can be time-shared is outlined. Moreover, the notion of 'connected elements' that are dynamic, time-limited, and yet transient enough to provide the necessary interconnectivity is developed to support and complement the seamless function of a network of C&DW management facilities. The usefulness of the integrative approach is illustrated by a case study. Analysis of case studies demonstrates that waste management strategies in developing countries can be made more effective and waste collection efficiency can be increased. According to comparative studies, updating current waste management facilities can cut operating costs by 26%, while implementing an integrative strategy can cut costs by 52%. The discussions in this paper can help towns reevaluate C&DW management and put useful, unified C&DW management techniques into practice.
引用
收藏
页数:21
相关论文
共 50 条
  • [21] CONSTRUCTION AND DEMOLITION (C&D) WASTE MANAGEMENT: CURRENT SITUATION AND PRACTICES IN MALAYSIA
    Masudi, Ahmad Firman
    Hassan, Che Rosmani Che
    Mahmood, Noor Zalina
    Mokhtar, Siti Nazziera
    Sulaiman, Nik Meriam
    PROCEEDINGS OF THE FIRST INTERNATIONAL CONFERENCE ON SUSTAINABLE URBANIZATION (ICSU 2010), 2010, : 951 - 958
  • [22] REDEFINING CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT SYSTEMS: BEST PRACTICES ON CIVIL ENGINEERING WORKS
    Villoria Saez, Paola
    de Guzman Baez, Ana
    Garcia Navarro, Justo
    del Rio Merino, Mercedes
    BALTIC JOURNAL OF ROAD AND BRIDGE ENGINEERING, 2014, 9 (03): : 171 - 179
  • [23] Barriers to circular economy practices during construction and demolition waste management in an emerging economy
    Bhavsar, Vandana
    Sridharan, Srividhya Raju
    Sudarsan, J. S.
    RESOURCES CONSERVATION & RECYCLING ADVANCES, 2023, 20
  • [24] An estimating system for construction and demolition waste management
    Touran, A
    Wang, JY
    Christoforou, C
    Dantata, N
    SYSTEM-BASED VISION FOR STRATEGIC AND CREATIVE DESIGN, VOLS 1-3, 2003, : 137 - 141
  • [25] Challenges in sustainable management of construction and demolition waste
    Agamuthu, P.
    WASTE MANAGEMENT & RESEARCH, 2008, 26 (06) : 491 - 492
  • [26] Construction and demolition waste management: a conceptual framework
    Esa, Mohd Reza
    Halog, Anthony
    Rigamonti, Lucia
    International Journal of Environment and Waste Management, 2024, 35 (03) : 278 - 306
  • [27] Preliminary study for the management of construction and demolition waste
    Kourmpanis, B.
    Papadopoulos, A.
    Moustakas, K.
    Stylianou, M.
    Haralambous, K. J.
    Loizidou, M.
    WASTE MANAGEMENT & RESEARCH, 2008, 26 (03) : 267 - 275
  • [28] Proposition for waste management of construction and demolition of Cuiaba
    Naime, Roberto
    Abreu, Eduardo Figueiredo
    Attilio, Dioni Maria
    REVISTA ELETRONICA EM GESTAO EDUCACAO E TECNOLOGIA AMBIENTAL, 2013, 15 (15): : 2902 - 2911
  • [29] Environmental management of construction and demolition waste in Kuwait
    Kartam, N
    Al-Mutairi, N
    Al-Ghusain, I
    Al-Humoud, J
    WASTE MANAGEMENT, 2004, 24 (10) : 1049 - 1059
  • [30] Trend of the research on construction and demolition waste management
    Yuan, Hongping
    Shen, Liyin
    WASTE MANAGEMENT, 2011, 31 (04) : 670 - 679