Production planning in maintenance facilities under uncertain repair time

被引:0
|
作者
Kafiabad, Shayan Tavakoli [1 ,2 ]
Zanjani, Masoumeh Kazemi [1 ,2 ]
Nourelfath, Mustapha [1 ,3 ]
机构
[1] Interuniv Res Ctr Enterprise Networks Logist & Tra, Montreal, PQ, Canada
[2] Concordia Univ, Montreal, PQ, Canada
[3] Laval Univ, Quebec City, PQ, Canada
关键词
Maintenance planning; workforce training; random repair time; multi-stage stochastic programming; capable to promise; PROGRAMMING APPROACH; PARTS LOGISTICS; OPERATIONS;
D O I
10.1080/01605682.2023.2237068
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Production planning in maintenance facilities that rely on the availability of certified operators is a challenging task. This is primarily attributed to the need for the integration of workforce training with the operations schedule, in addition to the uncertain repair time of some components. We confine our attention to the repair and overhaul of advanced technological devices that are composed of several components. In this context, this study proposes a novel approach to embedding uncertain repair times of faulty components and develops a multi-stage stochastic programming model for integrated production and workforce planning in such facilities under independent random repair time. Our numerical experiments conducted on a range of problem instances expose the significant value of incorporating repair time uncertainty in this problem.
引用
收藏
页码:1126 / 1139
页数:14
相关论文
共 50 条
  • [21] A robust optimization model under uncertain environment: An application in production planning
    Singh, Shubham
    Biswal, M. P.
    COMPUTERS & INDUSTRIAL ENGINEERING, 2021, 155
  • [22] Optimal production planning for chemical processes under uncertain market conditions
    Li, P
    Wendt, M
    Wozny, G
    CHEMICAL ENGINEERING & TECHNOLOGY, 2004, 27 (06) : 641 - 651
  • [23] Uncertain aggregate production planning
    Yufu Ning
    Jianjun Liu
    Limei Yan
    Soft Computing, 2013, 17 : 617 - 624
  • [24] Uncertain aggregate production planning
    Ning, Yufu
    Liu, Jianjun
    Yan, Limei
    SOFT COMPUTING, 2013, 17 (04) : 617 - 624
  • [25] Production Planning with Uncertain Demands
    Guillaume, Romain
    Kobylanski, Przemyslaw
    Zielinski, Pawel
    IEEE INTERNATIONAL CONFERENCE ON FUZZY SYSTEMS (FUZZ 2011), 2011, : 2644 - 2649
  • [26] Modeling as support for maintenance planning in industrial facilities
    Giribone, P
    PROCEEDINGS OF THE INDUSTRIAL & BUSINESS SIMULATION SYMPOSIUM, 1999, : 22 - 26
  • [27] TIME PHASED FACILITIES PLANNING
    SLEPICKA, KL
    RAJCHEL, DE
    COMPUTERS & INDUSTRIAL ENGINEERING, 1982, 6 (03) : 198 - 198
  • [28] Markov-Based Maintenance Planning Considering Repair Time and Periodic Inspection
    Lee, Seungchul
    Li, Lin
    Ni, Jun
    JOURNAL OF MANUFACTURING SCIENCE AND ENGINEERING-TRANSACTIONS OF THE ASME, 2013, 135 (03):
  • [29] Integrated production planning and condition-based maintenance considering uncertain demand and random failures
    Wang, Lin
    Lu, Zhiqiang
    Ren, Yifei
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE, 2020, 234 (1-2) : 310 - 323
  • [30] Integration of Maintenance in the Tactical Production Planning Process under Feasibility Constraint
    Gehan, Martin
    Castanier, Bruno
    Lemoine, David
    ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: INNOVATIVE AND KNOWLEDGE-BASED PRODUCTION MANAGEMENT IN A GLOBAL-LOCAL WORLD, PT 1, 2014, 438 : 467 - 474