Multistep Forecasting of Power Flow Based on LSTM Autoencoder: A Study Case in Regional Grid Cluster Proposal

被引:5
|
作者
Aksan, Fachrizal [1 ]
Li, Yang [2 ]
Suresh, Vishnu [1 ]
Janik, Przemyslaw [1 ]
机构
[1] Wroclaw Univ Sci & Technol, Fac Elect Engn, PL-50370 Wroclaw, Poland
[2] Brandenburg Univ Technol Cottbus Senftenberg, Dept Energy Distribut & High Voltage Engn, D-03046 Cottbus, Germany
关键词
multistep power flow forecast; LSTM autoencoder; regional grid cluster proposal; WIND-SPEED; NEURAL-NETWORK; MODEL; OPTIMIZATION;
D O I
10.3390/en16135014
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
A regional grid cluster proposal is required to tackle power grid complexities and evaluate the impact of decentralized renewable energy generation. However, implementing regional grid clusters poses challenges in power flow forecasting owing to the inherent variability of renewable power generation and diverse power load behavior. Accurate forecasting is vital for monitoring the imported power during peak regional load periods and surplus power generation exported from the studied region. This study addressed the challenge of multistep bidirectional power flow forecasting by proposing an LSTM autoencoder model. During the training stage, the proposed model and baseline models were developed using autotune hyperparameters to fine-tune the models and maximize their performance. The model utilized the last 6 h leading up to the current time (24 steps of 15 min intervals) to predict the power flow 1 h ahead (4 steps of 15 min intervals) from the current time. In the model evaluation stage, the proposed model achieved the lowest RMSE and MAE scores with values of 32.243 MW and 24.154 MW, respectively. In addition, it achieved a good R-2 score of 0.93. The evaluation metrics demonstrated that the LSTM autoencoder outperformed the other models for multistep forecasting task in a regional grid cluster proposal.
引用
收藏
页数:20
相关论文
共 50 条
  • [31] Evaluating the EEMD-LSTM model for short-term forecasting of industrial power load: A case study in Vietnam
    Nhat, Nam Nguyen Vu
    Huu, Duc Nguyen
    Hoai, Thu Nguyen Thi
    INTERNATIONAL JOURNAL OF RENEWABLE ENERGY DEVELOPMENT-IJRED, 2023, 12 (05): : 881 - 890
  • [32] Particle swarm optimization based LSTM networks for water level forecasting: A case study on Bangladesh river network
    Ruma, Jannatul Ferdous
    Adnan, Mohammed Sarfaraz Gani
    Dewan, Ashraf
    Rahman, Rashedur M.
    RESULTS IN ENGINEERING, 2023, 17
  • [33] Comprehensive Anti-error Study on Power Grid Dispatching Based on Regional Regulation and Integration
    Zhang, Yunju
    Chen, Zhongyi
    Guo, Ming
    Lin, Shunsheng
    Yan, Yinyang
    2017 3RD INTERNATIONAL CONFERENCE ON ENVIRONMENTAL SCIENCE AND MATERIAL APPLICATION (ESMA2017), VOLS 1-4, 2018, 108
  • [34] Regional wind-photovoltaic combined power generation forecasting based on a novel multi-task learning framework and TPA-LSTM
    Chen, Yuejiang
    Xiao, Jiang-Wen
    Wang, Yan-Wu
    Li, Yuanzheng
    ENERGY CONVERSION AND MANAGEMENT, 2023, 297
  • [35] A case study on regional impacts of climate change: Peak loads on the power grid in Rochester, New York
    Constable S.
    Hamilton J.
    Pfaff T.J.
    Journal of Environmental Studies and Sciences, 2013, 3 (1) : 15 - 20
  • [36] Cluster-Based Regional Innovation System: Theoretical Extension and Case Study of Shaoxing
    Zhou Yisha
    Jin Chen
    Si Yaqi
    2011 PROCEEDINGS OF PICMET 11: TECHNOLOGY MANAGEMENT IN THE ENERGY-SMART WORLD (PICMET), 2011,
  • [37] Demand Forecasting and Allocation Optimization of Green Power Grid Supply Chain Based on Machine Learning Algorithm: A Study Based on the Whole-Process Data of Power Grid Materials
    Rao, Hanyu
    Li, Jiancheng
    Sun, Xiaojun
    SUSTAINABILITY, 2025, 17 (03)
  • [38] Saturated Demand Forecast of Regional Power Grid Based on Amended Self-Adaptive Logistic Model: A Case Study of East China
    Yang, Tai-Hua
    Sun, Rui
    Wei, Qiming
    Gao, Yuqi
    IEEE ACCESS, 2021, 9 : 1190 - 1196
  • [39] Forecasting energy output of a solar power plant in curtailment condition based on LSTM using P/GHI coefficient and validation in training process, a case study in Vietnam
    Bui, Linh Duy
    Nguyen, Ninh Quang
    Van Doan, Binh
    Sanseverino, Eleonora Riva
    ELECTRIC POWER SYSTEMS RESEARCH, 2022, 213
  • [40] Case-Study of an HTS Saturable Core Reactor for Power Flow Control in a Transmission Grid
    Miudo, Leonardo
    Murta-Pina, Joao
    Amaro, Nuno
    Pronto, Anabela
    Vilhena, Nuno
    Arsenio, Pedro
    IEEE TRANSACTIONS ON APPLIED SUPERCONDUCTIVITY, 2024, 34 (03) : 1 - 5