Off-Site Manufacturing: Determining Decision-Making Factors

被引:1
|
作者
Kosbar, Mohamed M. [1 ]
Elbeltagi, Emad [2 ]
Mahdi, Ibrahim [3 ]
Kassem, Mahmoud [4 ]
Ehab, A. [5 ]
机构
[1] Arab Acad Sci Technol & Maritime Transport AASTMT, Coll Engn & Technol, Giza 12577, Egypt
[2] Mansoura Univ, Dept Struct Engn, Construct Management, Mansoura 35516, Egypt
[3] Future Univ Egypt FUE, Dept Struct Engn & Construction Management, Construct Management, New Cairo 11835, Egypt
[4] Arab Acad Sci Technol & Maritime Transport AASTMT, Dept Construct & Bldg Engn, Cairo 12577, Egypt
[5] Badr Univ Cairo BUC, Civil Engn Dept, Cairo 11829, Egypt
关键词
Building Information Modeling (BIM); off-site manufacturing (OSM); social network analysis (SNA); construction management; MANAGEMENT; SELECTION; SYSTEM;
D O I
10.3390/buildings13112856
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
New technologies like modular construction are expected to increase the market share in developing countries with a high annual growth rate such as in Egypt. Modular construction solutions that have content depending on the process of off-site construction and on-site transportation gained prominence over recent years due to several benefits, especially their positive impact on the environment. Off-site manufacturing (OSM) and traditional technologies like on-site ones differ in many aspects of design, requirements, logistics, engineering, and others. Many researchers studied modular construction and they fall short of investigating modular construction processes comprehensively and completely. In this paper, the barriers and benefits of using off-site manufacturing (OSM) are collected from the previous studies (that focused on mega projects, high quality, and fast-track projects) to be analyzed using a social network analysis (SNA) to promote the implementation of this new technology mainly in high-annual-growth-rate countries. A survey was used to solicit the opinions of construction practitioners to identify the most significant barriers and obstacles, as well as the benefits of using OSM. Also, due to the capabilities of Building Information Modeling (BIM) to manage shared information and increase the cooperation among project parties, the integration of OSM and BIM is investigated as a promising approach to overcome OSM barriers and enhance its utilization. Analyzing the main barriers' density and finding out the main solution are involved. Applying this case to a real project in Egypt to study the impact of using (OSM) on-site and exporting the data are also involved. With some results related to the other results and disadvantages that were deduced, the most important advantages and most disadvantages emerged, as well as finding ways to solve them and practical application on the ground.
引用
收藏
页数:21
相关论文
共 50 条
  • [21] Modular Construction: Determining Decision-Making Factors and Future Research Needs
    Abdul Nabi, Mohamad
    El-adaway, Islam H.
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2020, 36 (06)
  • [22] A decision-support system for off-site nuclear emergencies
    Xia, YH
    Lin, G
    Su, P
    Liu, TF
    Xia, HH
    Zhang, YX
    Sang, XZ
    HEALTH PHYSICS, 1998, 74 (03): : 387 - 392
  • [23] Off-site focus
    Concrete Engineering International, 3 (04):
  • [24] OFF-SITE ARCHAEOLOGY
    WILKINSON, TJ
    RESEARCH & EXPLORATION, 1992, 8 (02): : 196 - 207
  • [25] Off-site focus
    Concrete Engineering International, 1998, 2 (06):
  • [26] Off-site focus
    Concr Eng Int, 8 (03):
  • [27] THE IMPACT OF SIMULATION IN MANUFACTURING DECISION-MAKING
    HOLLOCKS, BW
    CONTROL ENGINEERING PRACTICE, 1995, 3 (01) : 105 - 112
  • [28] Manufacturing simulation decision-making key
    Castrillon, Jose Villanueva
    DYNA, 2008, 83 (04): : 221 - 227
  • [29] Factors influencing the implementation of off-site manufacturing in commercial projects in Western Australia A proposed research agenda
    Correia, Jordan Mark
    Sutrisna, Monty
    Zaman, Atiq U.
    JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2020, 18 (06) : 1449 - 1468
  • [30] Design for Manufacturing and Assembly (DfMA) in Off-Site Construction (OSC) and On-Site Construction
    Montazeri, Sadaf
    Iordanova, Ivanka
    Rankohi, Sara
    PROCEEDINGS OF THE CANADIAN SOCIETY FOR CIVIL ENGINEERING ANNUAL CONFERENCE 2023, VOL 4, CSCE 2023, 2025, 498 : 385 - 398