Regional integrated energy system reliability and low carbon joint planning considering multiple uncertainties

被引:7
|
作者
Yang, Baijie [1 ]
Ge, Shaoyun [1 ]
Liu, Hong [1 ]
Zhang, Xihai [1 ]
Xu, Zhengyang [1 ]
Wang, Saiyi [2 ]
Huang, Xin [2 ]
机构
[1] Tianjin Univ, Key Lab Smart Grid, Minist Educ, Tianjin, Peoples R China
[2] State Grid Pudong Elect Power Supply Co Ltd, Shanghai Elect Power Supply Co, Shanghai, Peoples R China
来源
关键词
Reliability; Carbon emissions; Regionally Integrated Energy System (RIES); Energy station (ES); CCHP-CCS-P2G (CCP); Two-stage distributionally robust; optimization (DDTS-DRO); NATURAL-GAS; ECONOMIC-DISPATCH; MILP MODEL; POWER; ELECTRICITY; OPERATION; IMPACT; UNIT;
D O I
10.1016/j.segan.2023.101123
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
To improve the reliability and reduce carbon emissions of the Regionally Integrated Energy System (RIES), this paper proposes a "source/load/storage/conversion"collaborative planning framework for energy station (ES), in which traditional combined cooling, heating, and power system (CCHP) is considered to be retrofitted into CCHP with carbon capture system (CCS) and Power-to-Gas (P2G) systems (CCP). The sizing of PV, multi-energy storage systems (MESS), integrated demand response (IDR), CCP, and other energy conversion facilities of the ESs are all considered in the proposed model. With climate change, the PV output and IDR power uncertainties are also analyzed in the proposed method. Data-driven two-stage distributionally robust optimization (DDTS-DRO) method is introduced to solve the planning model. And the piecewise linearization and Big-M methods are proposed to convert the original MINLP model into the MILP model for the solution, which improves the calculation speed. The case results and discussions demonstrate the proposed methods' effectiveness in improving ESs' reliability and profit, increasing PV installed capacity, and reducing ESs' carbon emissions.& COPY; 2023 Published by Elsevier Ltd.
引用
收藏
页数:18
相关论文
共 50 条
  • [41] Dispatch for energy efficiency improvement of an integrated energy system considering multiple types of low carbon factors and demand response
    Ma, Xiping
    Liang, Yan
    Wang, Kaiyan
    Jia, Rong
    Wang, Xueyan
    Du, Haodong
    Liu, Heng
    FRONTIERS IN ENERGY RESEARCH, 2022, 10
  • [42] Robust optimal scheduling of integrated energy systems considering multiple uncertainties
    Hu, Keyong
    Wang, Ben
    Feng, Yang
    Cao, Shihua
    Wang, Lidong
    Li, Wenjuan
    ENERGY SCIENCE & ENGINEERING, 2023, 11 (10) : 3413 - 3433
  • [43] Day-ahead bidding strategy of regional integrated energy systems considering multiple uncertainties in electricity markets
    Wang, Yubin
    Zheng, Yanchong
    Yang, Qiang
    APPLIED ENERGY, 2023, 348
  • [44] Research on Low-Carbon Energy Sharing through the Alliance of Integrated Energy Systems with Multiple Uncertainties
    Shi, Zhihan
    Han, Weisong
    Zhang, Guangming
    Bai, Zhiqing
    Zhu, Mingxiang
    Lv, Xiaodong
    ENERGIES, 2022, 15 (24)
  • [45] Optimal planning of integrated energy system considering swapping station and carbon capture power system
    He, Chenke
    Zhu, Jizhong
    Cheung, Kwok
    Borghetti, Alberto
    Zhang, Di
    Zhu, Haohao
    ENERGY REPORTS, 2023, 9 : 165 - 170
  • [46] Research on Operational Optimization Technology of Regional Integrated Energy System Considering Operating Cost and Reliability
    Zhang, Xiaochen
    Zhu, Jinda
    Yang, Dongmei
    Chen, Yonghua
    Du, Wei
    PROCEEDINGS OF 2019 INTERNATIONAL FORUM ON SMART GRID PROTECTION AND CONTROL (PURPLE MOUNTAIN FORUM), VOL II, 2020, 585 : 39 - 49
  • [47] Joint planning of residential electric vehicle charging station integrated with photovoltaic and energy storage considering demand response and uncertainties
    Zhang, Meijuan
    Yan, Qingyou
    Guan, Yajuan
    Ni, Da
    Tinajero, Gibran David Agundis
    ENERGY, 2024, 298
  • [48] Review on Low-carbon Planning and Operation of Integrated Energy System
    Song X.
    Shi Q.
    Ju Y.
    Ge H.
    Zhang J.
    Lu Y.
    Yu K.
    Gaodianya Jishu/High Voltage Engineering, 2024, 50 (03): : 1053 - 1066
  • [49] Integrated energy system planning considering renewable energy uncertainties based on multi-scenario confidence gap decision
    Peng, Chunhua
    Fan, Guozhu
    Xiong, Zhisheng
    Zeng, Xinzhi
    Sun, Huijuan
    Xu, Xuesong
    RENEWABLE ENERGY, 2023, 216
  • [50] Planning Optimization of Integrated Energy System Considering Economy and Integrated Energy Efficiency
    Wang, Qingwei
    Wang, Yongli
    Ma, Yuze
    Ma, Yang
    Dong, Huanran
    Qi, Chengyuan
    Song, Fuhao
    Huang, Feifei
    2020 6TH INTERNATIONAL CONFERENCE ON ADVANCES IN ENERGY, ENVIRONMENT AND CHEMICAL ENGINEERING, PTS 1-5, 2020, 546