Multi-skilled worker assignment in seru production system for the trade-off between production efficiency and workload fairness

被引:12
|
作者
Zeng, Shaoyu [1 ]
Wu, Yinghui [1 ]
Yu, Yang [2 ]
机构
[1] Jiangsu Univ Sci & Technol, Sch Econ & Management, Zhenjiang, Jiangsu, Peoples R China
[2] Northeastern Univ, Inst Intelligent Data & Syst Engn, State Key Lab Synthet Automat Proc Ind, Shenyang, Peoples R China
基金
中国国家自然科学基金;
关键词
Multi-skilled worker assignment; Bi-objective optimization; Production efficiency; Workload fairness; LINE-CELL CONVERSION; NUMERICAL-ANALYSIS; MODEL; COST;
D O I
10.1108/K-01-2022-0054
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
Purpose The paper formulates a bi-objective mixed-integer nonlinear programming model, aimed at minimizing the total labor hours and the workload unfairness for the multi-skilled worker assignment problem in Seru production system (SPS). Design/methodology/approach Three approaches, namely epsilon-constraint method, non-dominated sorting genetic algorithm 2 (NSGA-II) and improved strength Pareto evolutionary algorithm (SPEA2), are designed for solving the problem. Findings Numerous experiments are performed to assess the applicability of the proposed model and evaluate the performance of algorithms. The merged Pareto-fronts obtained from both NSGA-II and SPEA2 were proposed as final solutions to provide useful information for decision-makers. Practical implications SPS has the flexibility to respond to the changing demand for small amount production of multiple varieties products. Assigning cross-trained workers to obtain flexibility has emerged as a major concern for the implementation of SPS. Most enterprises focus solely on measures of production efficiency, such as minimizing the total throughput time. Solutions based on optimizing efficiency measures alone can be unacceptable by workers who have high proficiency levels when they are achieved at the expense of the workers taking more workload. Therefore, study the tradeoff between production efficiency and fairness in the multi-skilled worker assignment problem is very important for SPS. Originality/value The study investigates a new mixed-integer programming model to optimize worker-to-seru assignment, batch-to-seru assignment and task-to-worker assignment in SPS. In order to solve the proposed problem, three problem-specific solution approaches are proposed.
引用
收藏
页码:3495 / 3518
页数:24
相关论文
共 50 条
  • [41] To harvest or not to harvest? Forest management as a trade-off between bioenergy production and carbon sink
    Lin, Boqiang
    Ge, Jiamin
    JOURNAL OF CLEANER PRODUCTION, 2020, 268
  • [42] The financial trade-off between the production of biochar and biofuel via pyrolysis under uncertainty
    Frank, Jenny R.
    Brown, Tristan R.
    Malmsheimer, Robert W.
    Volk, Timothy A.
    Ha, HakSoo
    BIOFUELS BIOPRODUCTS & BIOREFINING-BIOFPR, 2020, 14 (03): : 594 - 604
  • [43] The Trade-Off Between Capital and Community: The Conditions for Successful Co-production in Housing
    Taco Brandsen
    Jan-Kees Helderman
    VOLUNTAS: International Journal of Voluntary and Nonprofit Organizations, 2012, 23 : 1139 - 1155
  • [44] The Response Latency in Global Production and Logistics: A Trade-off Between Robotization and Globalization of a Chain
    Bogataj, David
    Battini, Daria
    Calzavara, Martina
    Persona, Alessandro
    25TH INTERNATIONAL CONFERENCE ON PRODUCTION RESEARCH MANUFACTURING INNOVATION: CYBER PHYSICAL MANUFACTURING, 2019, 39 : 1428 - 1437
  • [45] A WITHIN-CLUTCH TRADE-OFF BETWEEN EGG-PRODUCTION AND REARING IN BIRDS
    HEANEY, V
    MONAGHAN, P
    PROCEEDINGS OF THE ROYAL SOCIETY B-BIOLOGICAL SCIENCES, 1995, 261 (1362) : 361 - 365
  • [46] The Trade-Off Between Capital and Community: The Conditions for Successful Co-production in Housing
    Brandsen, Taco
    Helderman, Jan-Kees
    VOLUNTAS, 2012, 23 (04): : 1139 - 1155
  • [47] Wetland productivity determines trade-off between biodiversity support and greenhouse gas production
    Ahlen, David
    Peacock, Mike
    Brodin, Yngve
    Hamback, Peter A.
    ECOLOGY AND EVOLUTION, 2023, 13 (10):
  • [48] CONVERSION - THE TRADE-OFF BETWEEN MILITARY AND CIVILIAN PRODUCTION IN WARSAW-PACT COUNTRIES
    KLEIN, LR
    GRONICKI, M
    CONFLICT MANAGEMENT AND PEACE SCIENCE, 1990, 11 (01) : 45 - 56
  • [49] Trade-off between process scheduling and production cost in cyclic flexible robotic cells
    Barenji, Reza Vatankhah (reza.vatankhah@hacettepe.edu.tr), 1600, Springer London (96): : 1 - 4
  • [50] Trade-off between process scheduling and production cost in cyclic flexible robotic cells
    Mazyar Ghadiri Nejad
    Seyed Mahdi Shavarani
    Béla Vizvári
    Reza Vatankhah Barenji
    The International Journal of Advanced Manufacturing Technology, 2018, 96 : 1081 - 1091