摘要
Change orders are an integral part of most construction projects. Their impact on labour productivity is well established in literature and practice. However, quantifying change order impact on labour productivity continues to be a challenging issue and a source of dispute between Employers and Contractors. The currently used methods in quantifying the change order impact on labour productivity are based on statistical models, historical data, or unimpacted labour productivity period. Therefore, there is a need to expand these methods to include a standardized method to quantify the change order impact. This article presents a new method to quantify the labour productivity loss due to change order impact on the project base scope. The proposed method deploys many project management techniques such as scheduling, change order analysis, earned value, progress tracking and cost estimation to accurately estimate the loss of labour productivity due to change orders. The method was implemented during the construction phase of an electrical project to confirm its applicability and usefulness to the construction industry. The project parties were able to prove that the change orders had impacted labour productivity and accurately quantified their impact.
引用
收藏
页码:467 / 475
页数:9
相关论文
共 50 条
  • [1] Model for Quantifying the Impact of Change Orders on Project Cost for US Roadwork Construction
    Serag, Engy
    Oloufa, Amr
    Malone, Linda
    Radwan, Essam
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2010, 136 (09): : 1015 - 1027
  • [2] Quantifying and Modeling the Cumulative Impact of Change Orders
    Hanna, Awad S.
    Iskandar, Karim A.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2017, 143 (10)
  • [3] Cost Impacts of Change Orders due to Unforeseen Existing Conditions in Building Renovation Projects
    Kim, Joseph J.
    Miller, James A.
    Kim, Sunkuk
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2020, 146 (08)
  • [4] Quantifying Uncertainty Due to Stochastic Weather Generators in Climate Change Impact Studies
    Fosco M. Vesely
    Livia Paleari
    Ermes Movedi
    Gianni Bellocchi
    Roberto Confalonieri
    [J]. Scientific Reports, 9
  • [5] Quantifying Uncertainty Due to Stochastic Weather Generators in Climate Change Impact Studies
    Vesely, Fosco M.
    Paleari, Livia
    Movedi, Ermes
    Bellocchi, Gianni
    Confalonieri, Roberto
    [J]. SCIENTIFIC REPORTS, 2019, 9 (1)
  • [6] IMPACT OF CHANGE ORDERS ON CONSTRUCTION PRODUCTIVITY
    MOSELHI, O
    LEONARD, C
    FAZIO, P
    [J]. CANADIAN JOURNAL OF CIVIL ENGINEERING, 1991, 18 (03) : 484 - 492
  • [7] IMPACT - REAL EFFECT OF CHANGE ORDERS
    COLLINS, CJ
    [J]. AACE BULLETIN, 1970, 12 (02): : 51 - &
  • [8] Change orders impact on labor productivity
    Moselhi, O
    Assem, I
    El-Rayes, K
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2005, 131 (03): : 354 - 359
  • [9] Quantifying the Mortality Impact of Do-Not-Resuscitate Orders in the ICU
    Fuchs, Lior
    Anstey, Matthew
    Feng, Mengling
    Toledano, Ronen
    Kogan, Slava
    Howell, Michael D.
    Clardy, Peter
    Celi, Leo
    Talmor, Daniel
    Novack, Victor
    [J]. CRITICAL CARE MEDICINE, 2017, 45 (06) : 1019 - 1027
  • [10] Quantifying the Impact of Change on the Progress of Construction Projects
    Alzraiee, Hani
    Zayed, Tarek
    [J]. CONSTRUCTION RESEARCH CONGRESS 2018: CONSTRUCTION PROJECT MANAGEMENT, 2018, : 701 - 711