Change orders impact on labor productivity

被引:90
|
作者
Moselhi, O [1 ]
Assem, I
El-Rayes, K
机构
[1] Concordia Univ, Dept Bldg Civil & Environm Engn, Montreal, PQ H3G 1M8, Canada
[2] Univ Illinois, Dept Civil & Environm Engn, Urbana, IL 61801 USA
关键词
D O I
10.1061/(ASCE)0733-9364(2005)131:3(354)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper describes a study conducted to investigate the impact of change orders on construction productivity and introduces a new neural network model for quantifying this impact. The study is based on a comprehensive literature review and a field investigation of projects constructed in Canada and the USA. The field investigation was carried out over a 6-month period and encompassed 33 actual cases of work packages and contracts. Factors contributing to the adverse effects of change orders on labor productivity are identified and a model presented earlier is expanded to account primarily for the timing of change orders, among other factors. The developed model, as well as four models developed by others, have been incorporated in a prototype software system to estimate the loss of labor productivity due to change orders. A numerical example is presented to demonstrate the use of the developed model, and illustrate its capabilities.
引用
收藏
页码:354 / 359
页数:6
相关论文
共 50 条
  • [1] IMPACT OF CHANGE ORDERS ON CONSTRUCTION PRODUCTIVITY
    MOSELHI, O
    LEONARD, C
    FAZIO, P
    [J]. CANADIAN JOURNAL OF CIVIL ENGINEERING, 1991, 18 (03) : 484 - 492
  • [2] Developing management policies and analyzing impact of change orders on labor productivity in construction projects
    Kermanshachi, Sharareh
    Rouhanizadeh, Behzad
    Govan, Paul
    [J]. JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2022, 20 (05) : 1257 - 1279
  • [3] Impact of change orders on labor efficiency for mechanical construction
    Hanna, AS
    Russell, JS
    Gotzion, TW
    Nordheim, EV
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1999, 125 (03): : 176 - 184
  • [4] Impact of change orders on labor efficiency for electrical construction
    Hanna, AS
    Russell, JS
    Nordheim, EV
    Bruggink, MJ
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1999, 125 (04): : 224 - 232
  • [5] Impact of change's timing on Labor productivity
    Ibbs, W
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2005, 131 (11): : 1219 - 1223
  • [6] Impact of change orders on small labor-intensive projects
    Hanna, AS
    Gunduz, M
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2004, 130 (05) : 726 - 733
  • [7] Climate change impact on labor productivity in Thai manufacture
    Limskul, Kitti
    [J]. ASIA-PACIFIC JOURNAL OF REGIONAL SCIENCE, 2018, 2 (01) : 195 - 209
  • [8] The Direct Impact of Climate Change on Regional Labor Productivity
    Kjellstrom, Tord
    Kovats, R. Sari
    Lloyd, Simon J.
    Holt, Tom
    Tol, Richard S. J.
    [J]. ARCHIVES OF ENVIRONMENTAL & OCCUPATIONAL HEALTH, 2009, 64 (04) : 217 - 227
  • [9] A dynamic modelling of labor productivity impacts arising from change orders in road projects
    Al-Kofahi, Zain Ghazi
    Mahdavian, Amirsaman
    Oloufa, Amr
    [J]. CANADIAN JOURNAL OF CIVIL ENGINEERING, 2022, 49 (02) : 159 - 170
  • [10] System dynamics modeling approach to quantify change orders impact on labor productivity 1: principles and model development comparative study
    Al-Kofahi, Zain Ghazi
    Mahdavian, Amirsaman
    Oloufa, Amr
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2022, 22 (07) : 1355 - 1366