Stochastic Assessment of k Operational State System with k-out-of-n:G Working Scheme with Employing Copula Repair Approach

被引:0
|
作者
Ayagi, Hamisu Ismail [1 ,3 ]
Singh, V. V. [2 ]
Wan, Zhong [1 ]
机构
[1] Stat Cent South Univ, Sch Math, Changsha, Hunan, Peoples R China
[2] V M K PG Coll Khetri, Dept Math, Jhunjhunu 333504, Rajasthan, India
[3] Yusuf Maitama Sule Univ, Kano, Nigeria
关键词
System availability; MTTF; system reliability; profit function; supplementary variables; Gumbel-Hougaard family copula; COMPLEX SYSTEM; RELIABILITY; SUBSYSTEMS; AVAILABILITY;
D O I
10.1142/S0218539323500043
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper is a probabilistic performance study of a repairable complex system with three subsystems coupled in a series configuration. All three subsystems have been differently configured and also have different operational schemes. The first subsystem has n units and works under the k-out-of-n:G scheme, the second subsystem has four identical units and associates with a defined work scheme 2-out-of-4:G, however, the third subsystem has two indistinguishable units and works under the 1-out-of-2:G policy. The units' failure rates of the subsystems are different but constant and follow an exponential distribution, however, there are two types of repair facilities available for repair general and copula repair. Under the consideration of the system with the operational duration, the failed unit was replaced with a new one and it was assigned for repair. In the complete shutdown condition, a copula repair has been employed to repair the system. Traditional reliability measures have been studied for different values of failure and repair through supplementary variable and copula approaches. The numerical computations for securing different values of k and n have been exhibited and tables and graphs predict the future behavior of the system performance. In the conclusion section, the effect of reliability measures has been highlighted.
引用
收藏
页数:23
相关论文
共 50 条
  • [21] Stability analysis of a k-out-of-N:G reparable system
    Xu, Houbao
    ANZIAM JOURNAL, 2006, 48 : 271 - 284
  • [22] Posbist Reliability Theory of k-out-of-n:G System
    Huang, Hong-Zhong
    Li, Yanfeng
    Liu, Yu
    JOURNAL OF MULTIPLE-VALUED LOGIC AND SOFT COMPUTING, 2010, 16 (1-2) : 45 - 63
  • [23] Computation and transient analysis of a k-out-of-n:G repairable system with general repair times
    Wu, Wenqing
    Tang, Yinghui
    Yu, Miaomiao
    Jiang, Ying
    OPERATIONAL RESEARCH, 2015, 15 (02) : 307 - 324
  • [24] Computation and transient analysis of a k-out-of-n:G repairable system with general repair times
    Wenqing Wu
    Yinghui Tang
    Miaomiao Yu
    Ying Jiang
    Operational Research, 2015, 15 : 307 - 324
  • [25] Generalized multi-state k-out-of-n:G systems
    Huang, JS
    Zuo, MJ
    Wu, YH
    IEEE TRANSACTIONS ON RELIABILITY, 2000, 49 (01) : 105 - 111
  • [26] Stochastic behaviour of k-out-of-n system with different types of failures and repair: T-policy
    Sridharan, V.
    Kalyani, T.V.
    International Journal of Information and Management Sciences, 2002, 13 (03): : 71 - 80
  • [27] Availability Research on K-out-of-N: G Systems with Repair Time Omission
    Jia Zhiyu
    Kang Rui
    Wang Lichao
    Wang Naichao
    MATERIALS AND PRODUCT TECHNOLOGIES, 2010, 118-120 : 342 - 347
  • [28] OPTIMAL REPAIR STAGE FOR K-OUT-OF-N SYSTEMS
    VENUGOPAL, N
    AHAMED, SS
    REDDY, CR
    MICROELECTRONICS AND RELIABILITY, 1989, 29 (01): : 17 - 19
  • [29] Reliability of a k-out-of-n:G System with Identical Repairable Elements
    Sharifi, M.
    Nia, A. Torabi
    Shafie, P.
    Norozi-Zare, F.
    Sabet-Ghadam, A.
    NUMERICAL ANALYSIS AND APPLIED MATHEMATICS, VOLS 1 AND 2, 2009, 1168 : 385 - +
  • [30] Reliability of a consecutive k-out-of-n: G system with protection blocks
    Fang, Shu
    Yu, Rongquan
    Wu, Di
    Peng, Rui
    INTERNATIONAL JOURNAL OF GENERAL SYSTEMS, 2024,