The benefits of InSAR monitoring during the construction of the Ceneri Base Tunnel

被引:0
|
作者
Stocker, D. [1 ]
Merlini, D. [1 ]
Falanesca, M. [1 ]
Del Col, A. [2 ]
Gervasi, C. [3 ]
Iannicella, I. [3 ]
机构
[1] Pini Grp Ltd, Lugano, Switzerland
[2] AlpTransit Gotthard, Luzern, Switzerland
[3] TRE Altamira Srl, Milan, Italy
关键词
D O I
10.1201/9781003348030-306
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper introduces the InSAR method as an advanced tool to measure and monitor ground displacements during all phases of a tunnelling project. The monitoring was focused on the southern sector of the tunnel which was the most densely urbanized area and with a low overburden. The extensive monitoring system included both standard activities (measurements of vibration phenomena, topographical measurements from the surface, monitoring of groundwater levels, assessments of the condition of the buildings before, during and after the works) and the innovative satellite monitoring system InSAR. The area subject to satellite monitoring has a length of approx. 5.5 km and a width of 1 km, 500 m on both sides of the tunnel axis. SqueeSAR (R) information is summarized for specific areas following the progression of tunnelling. Finally, the results from the design predictive analyses, the in-situ deformations recorded during the excavation and the satellite monitoring data are discussed.
引用
收藏
页码:2544 / 2551
页数:8
相关论文
共 50 条
  • [21] Convergences and core extrusions during construction of the Gotthard Base Tunnel
    Cantieni, L.
    Anagnostou, G.
    Hug, R.
    HARMONISING ROCK ENGINEERING AND THE ENVIRONMENT, 2012, : 1639 - 1644
  • [22] Construction of the Brenner Base Tunnel
    Bergmeister, K.
    BAUINGENIEUR, 2010, 85 : 159 - 168
  • [23] Monitoring during the construction of the Allen Sewer Tunnel, Toronto, Canada
    Shirlaw, JN
    Yi, X
    Pennington, BN
    GEOTECHNICAL ASPECTS OF UNDERGROUND CONSTRUCTION IN SOFT GROUND, 1996, : 429 - 434
  • [24] Tunnelling in complex geological structures during the construction of the Brenner Base Tunnel
    Marini, David
    Lussu, Andrea
    Hofmann, Matthias
    Venditti, Giuseppe
    Geomechanik und Tunnelbau, 2024, 17 (06): : 594 - 604
  • [25] Volume Loss Assessment with MT-InSAR during Tunnel Construction in the City of Naples (Italy)
    Della Ragione, Gianluigi
    Rocca, Alfredo
    Perissin, Daniele
    Bilotta, Emilio
    REMOTE SENSING, 2023, 15 (10)
  • [26] Storage sites for tunnel excavation material – challenges and approach using the Gotthard and Ceneri Base Tunnels as examples
    Schwalt M.
    Rabaiotti C.
    Geomechanik und Tunnelbau, 2018, 11 (03): : 287 - 300
  • [27] DESIGN AND CONSTRUCTION OF THE FURKA BASE TUNNEL
    AMBERG, R
    ROCK MECHANICS AND ROCK ENGINEERING, 1983, 16 (04) : 215 - 231
  • [28] MONITORING AND ASSESSMENT OF A FRAME TUNNEL BRIDGE DURING JACKING CONSTRUCTION STAGE
    Lu, Wenliang
    Su, Dan
    Dong, Dawei
    ADVANCES IN CONCRETE STRUCTURAL DURABILITY, PROCEEDINGS OF ICDCS2008, VOLS 1 AND 2, 2008, : 1051 - 1057
  • [29] Gotthard Base Tunnel: UDEC Simulations of Micro Tremors Encountered During Construction
    Hagedorn, H.
    Stadelmann, R.
    ANALYSIS OF DISCONTINUOUS DEFORMATION: NEW DEVELOPMENTS AND APPLICATIONS, 2010, : 373 - 380
  • [30] Findings from the geodetic Long-Term Monitoring in the Construction of the Gotthard-Base Tunnel
    Salvini, Dante
    Studer, Mario
    Ryf, Adrian
    WASSERWIRTSCHAFT, 2016, 106 (09) : 22 - 26