共 50 条
- [21] Convergences and core extrusions during construction of the Gotthard Base Tunnel HARMONISING ROCK ENGINEERING AND THE ENVIRONMENT, 2012, : 1639 - 1644
- [23] Monitoring during the construction of the Allen Sewer Tunnel, Toronto, Canada GEOTECHNICAL ASPECTS OF UNDERGROUND CONSTRUCTION IN SOFT GROUND, 1996, : 429 - 434
- [24] Tunnelling in complex geological structures during the construction of the Brenner Base Tunnel Geomechanik und Tunnelbau, 2024, 17 (06): : 594 - 604
- [26] Storage sites for tunnel excavation material – challenges and approach using the Gotthard and Ceneri Base Tunnels as examples Geomechanik und Tunnelbau, 2018, 11 (03): : 287 - 300
- [28] MONITORING AND ASSESSMENT OF A FRAME TUNNEL BRIDGE DURING JACKING CONSTRUCTION STAGE ADVANCES IN CONCRETE STRUCTURAL DURABILITY, PROCEEDINGS OF ICDCS2008, VOLS 1 AND 2, 2008, : 1051 - 1057
- [29] Gotthard Base Tunnel: UDEC Simulations of Micro Tremors Encountered During Construction ANALYSIS OF DISCONTINUOUS DEFORMATION: NEW DEVELOPMENTS AND APPLICATIONS, 2010, : 373 - 380