Goal programming models for high-speed train crew scheduling problem

被引:0
|
作者
Alakas, Haci Mehmet [1 ]
Eren, Tamer [1 ]
Yelek, Ayse [1 ]
Ozder, Emir Huseyin [2 ]
机构
[1] Kirikkale Univ, Fac Engn, Dept Ind Engn, Kirikkale, Turkiye
[2] Ankara Sci Univ, Fac Engn & Architecture, Ind Engn Dept, Ankara, Turkiye
关键词
Railway systems; High-speed train; Crew scheduling; Goal programming; Staff scheduling; PLANNING PROBLEM; ALGORITHMS;
D O I
10.1007/s00500-023-09466-1
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
High freight and passenger-carrying capacity, providing a fast and safe journey, and its tourism potential, railway transportation remains preferable among transportation types. Many personnel perform different tasks such as operation, administration, maintenance, security, and cleaning on the railways to provide an excellent service to the passengers. These personnel are among the most critical parts of the railway system in infrastructure, passenger, and freight transport. This study aims to create a schedule by using mathematical methods for the personnel working in the railway system. The goal programming method, which enables to achieve more than one goal simultaneously, was used to solve the problem. It is planned to create the most appropriate and efficient work plan by analyzing the work, task distribution, and shift schedules of the personnel working on the high-speed railway (HSR) Ankara-Istanbul line. The 28 day team schedule, which aims to distribute the duties of the staff equally, includes the distribution of the teams and the creation of tours for a total of sixteen daily trips. 225 crew working between Ankara-Istanbul and Istanbul-Ankara were formed. We gathered a fair schedule for the crew, and we increased the satisfaction level of the personnel. While all this is being done, the business requests were met.
引用
收藏
页码:5921 / 5936
页数:16
相关论文
共 50 条
  • [31] Solution of Multi-Crew Depots Railway Crew Scheduling Problems: The Chinese High-Speed Railway Case
    Zhao, Chunxiao
    Chen, Junhua
    Zhang, Xingchen
    Cui, Zanyang
    SUSTAINABILITY, 2022, 14 (01)
  • [32] PROBLEM OF AGGREGATE SCHEDULING AN APPLICATION OF GOAL PROGRAMMING
    LOCKETT, AG
    MUHLEMANN, AP
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1978, 16 (02) : 127 - 135
  • [33] Optimization models for high-speed train unit routing problems
    Wang, Ying
    Gao, Yuan
    Yu, Xiaoyuan
    Hansen, Ingo A.
    Miao, Jianrui
    COMPUTERS & INDUSTRIAL ENGINEERING, 2019, 127 : 1273 - 1281
  • [34] HIGH-SPEED ICE TRAIN
    WHITACRE, JA
    MECHANICAL ENGINEERING, 1971, 93 (08) : 57 - &
  • [35] The future of high-speed train
    Endo, T
    IEICE TRANSACTIONS ON INFORMATION AND SYSTEMS, 2005, E88D (12) : 2625 - 2629
  • [36] The future of high-speed train
    Ishida, Y
    ISADS 2005: International Symposium on Autonomous Decentralized Systems,Proceedings, 2005, : 415 - 418
  • [37] HIGH-SPEED ICE TRAIN
    EISENSTADT, MM
    RILEY, JD
    MECHANICAL ENGINEERING, 1971, 93 (06) : 14 - +
  • [38] HIGH-SPEED TRAIN OPERATION
    KIRK, WB
    MECHANICAL ENGINEERING, 1966, 88 (02) : 75 - &
  • [39] High-speed train for everyone
    Navarri, A.
    Rail International, 1998, (9-10): : 18 - 19
  • [40] Italian high-speed train
    Bertorelli, D.
    Mechanical Incorporated Engineer, 1993, 5 (04):