Development of a Blockchain Prototype for Collaborative Risk Assessment of Construction Projects

被引:0
|
作者
Chung, In Bae [1 ]
Caldas, Carlos H. [1 ]
机构
[1] Univ Texas Austin, Dept Civil Architectural & Environm Engn, Austin, TX 78712 USA
关键词
D O I
暂无
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This research explores the applicability of blockchain technology for collaborative risk assessment of capital projects through prototype development. Risk assessment is a collaborative process where project participants get together to assess and manage potential project risks. Different systems have been developed to support this collaborative risk assessment process. However, such systems are governed in a centralized manner and do not protect the confidentiality of individual inputs from the stakeholders. Moreover, the security and transparency of the data stored can become an issue as well. The research explains the development of a blockchain prototype to address the problems stated above. A private permissioned blockchain network has been configured so that risk-related information can be transacted in a secure, transparent, and trustable way. Smart contract algorithms have been developed to receive risk inputs from multiple stakeholders and update an aggregated output. The system architecture and the functionalities of the prototype are described in detail, and each step of the risk assessment process has been demonstrated on the prototype system. The research discusses the limitations of the current prototype and future work that can be done to improve collaborative risk assessment.
引用
收藏
页码:547 / 554
页数:8
相关论文
共 50 条
  • [41] Influence of highway construction projects on economic development: an empirical assessment
    Gkritza, Konstantina
    Sinha, Kumares C.
    Labi, Samuel
    Mannering, Fred
    [J]. ANNALS OF REGIONAL SCIENCE, 2008, 42 (03): : 545 - 563
  • [42] Economic Project Risk Assessment in Remediation Projects Prior to Construction: Methodology Development and Case Study Application
    Brinkhoff, Petra
    Norin, Malin
    Norrman, Jenny
    Rosen, Lars
    Ek, Kristine
    [J]. REMEDIATION-THE JOURNAL OF ENVIRONMENTAL CLEANUP COSTS TECHNOLOGIES & TECHNIQUES, 2015, 25 (02): : 117 - 138
  • [43] Development of a New Technique for Safety Risk Assessment in Construction Projects Based on Fuzzy Analytic Hierarchy Process
    Mahdinia, Mohsen
    Yarandi, Mohsen Sadeghi
    Jafarinia, Ehsan
    Soltanzadeh, Ahmad
    [J]. ASCE-ASME JOURNAL OF RISK AND UNCERTAINTY IN ENGINEERING SYSTEMS PART A-CIVIL ENGINEERING, 2021, 7 (03)
  • [44] Development of a Model for Risk and Cost Analysis in Overseas Plant Construction Projects Focusing on Petrochemical Plant Construction Projects
    Kim, Yong-Su
    Kang, Hyun-Wook
    [J]. KSCE JOURNAL OF CIVIL ENGINEERING, 2017, 21 (05) : 1549 - 1562
  • [45] Risk Management of Real Estate's Development and Construction Projects
    Shen Jian-fei
    Jing, Yi
    Qiao, Sun
    [J]. PROCEEDINGS OF THE 2014 INTERNATIONAL CONFERENCE ON MECHATRONICS, ELECTRONIC, INDUSTRIAL AND CONTROL ENGINEERING, 2014, 5 : 1443 - +
  • [46] Blockchain supported BIM data provenance for construction projects
    Celik, Yasin
    Petri, Ioan
    Barati, Masoud
    [J]. COMPUTERS IN INDUSTRY, 2023, 144
  • [47] Exploration of challenges to deployment of blockchain in small construction projects
    Waqar, Ahsan
    Qureshi, Abdul Hannan
    Othman, Idris
    Azab, Marc
    Saad, Noha
    [J]. AIN SHAMS ENGINEERING JOURNAL, 2024, 15 (02)
  • [48] The Role of Blockchain in Improving the Processes and Workflows in Construction Projects
    Mohammed, Awsan
    Almousa, Ahmad
    Ghaithan, Ahmed
    Hadidi, Laith A.
    [J]. APPLIED SCIENCES-BASEL, 2021, 11 (19):
  • [49] Development of a model for risk and cost analysis in overseas plant construction projects focusing on petrochemical plant construction projects
    Yong-Su Kim
    Hyun-Wook Kang
    [J]. KSCE Journal of Civil Engineering, 2017, 21 : 1549 - 1562
  • [50] A prototype of workflow management system for construction design projects
    杨明宇
    [J]. Journal of Chongqing University(English Edition), 2005, (03) : 144 - 148