A Formulation for the Stochastic Multi-Mode Resource-Constrained Project Scheduling Problem Solved with a Multi-Start Iterated Local Search Metaheuristic

被引:1
|
作者
Ramos, Alfredo S. [1 ]
Miranda-Gonzalez, Pablo A. [2 ]
Nucamendi-Guillen, Samuel [1 ]
Olivares-Benitez, Elias [1 ]
机构
[1] Univ Panamer, Fac Ingn, Zapopan 45010, Jalisco, Mexico
[2] Univ Catolica Norte, Dept Ingn Ind, Antofagasta 1270709, Chile
关键词
stochastic project scheduling; metaheuristic; multiple modes; resource constraints; iterated local search; ANT COLONY OPTIMIZATION; VEHICLE-ROUTING PROBLEM; GENETIC ALGORITHM; SINGLE; LOCATION;
D O I
10.3390/math11020337
中图分类号
O1 [数学];
学科分类号
0701 ; 070101 ;
摘要
This research introduces a stochastic version of the multi-mode resource-constrained project scheduling problem (MRCPSP) and its mathematical model. In addition, an efficient multi-start iterated local search (MS-ILS) algorithm, capable of solving the deterministic MRCPSP, is adapted to deal with the proposed stochastic version of the problem. For its deterministic version, the MRCPSP is an NP-hard optimization problem that has been widely studied. The problem deals with a trade-off between the amount of resources that each project activity requires and its duration. In the case of the proposed stochastic formulation, the execution times of the activities are uncertain. Benchmark instances of projects with 10, 20, 30, and 50 activities from well-known public libraries were adapted to create test instances. The adapted algorithm proved to be capable and efficient for solving the proposed stochastic problem.
引用
收藏
页数:25
相关论文
共 50 条
  • [1] Multi-start iterated local search metaheuristic for the multi-mode resource-constrained project scheduling problem
    Ramos, Alfredo S.
    Olivares-Benitez, Elias
    Miranda-Gonzalez, Pablo A.
    [J]. EXPERT SYSTEMS, 2022, 39 (01)
  • [2] Local search for nonpreemptive multi-mode resource-constrained project scheduling
    Kolisch, R
    Drexl, A
    [J]. IIE TRANSACTIONS, 1997, 29 (11) : 987 - 999
  • [3] The Multi-Mode Resource-Constrained Multi-Project Scheduling Problem
    Wauters, Tony
    Kinable, Joris
    Smet, Pieter
    Vancroonenburg, Wim
    Vanden Berghe, Greet
    Verstichel, Jannes
    [J]. JOURNAL OF SCHEDULING, 2016, 19 (03) : 271 - 283
  • [4] Scatter Search for Multi-mode Resource-constrained Project Scheduling Problems
    Pourghaderi, A. R.
    Torabi, S. A.
    Talebi, J.
    [J]. IEEM: 2008 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-3, 2008, : 163 - 167
  • [5] Solving the Multi-Mode Resource-Constrained Project Scheduling Problem with SMT
    Bofill, Miquel
    Coll, Jordi
    Suy, Josep
    Villaret, Mateu
    [J]. 2016 IEEE 28TH INTERNATIONAL CONFERENCE ON TOOLS WITH ARTIFICIAL INTELLIGENCE (ICTAI 2016), 2016, : 239 - 246
  • [7] Multi-mode resource-constrained project scheduling problem with alternative project structures
    Tao, Sha
    Dong, Zhijie Sasha
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2018, 125 : 333 - 347
  • [8] A multi-threaded local search algorithm and computer implementation for the multi-mode, resource-constrained multi-project scheduling problem
    Geiger, Martin Josef
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2017, 256 (03) : 729 - 741
  • [9] A Continuous-Time MILP Formulation for the Multi-Mode Resource-Constrained Project Scheduling Problem
    Gnagi, M.
    Rihm, T.
    Trautmann, N.
    [J]. 2018 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEE IEEM), 2018, : 452 - 456
  • [10] An adaptive large neighbourhood search as a matheuristic for the multi-mode resource-constrained project scheduling problem
    Gerhards, Patrick
    Stuerck, Christian
    Fink, Andreas
    [J]. EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2017, 11 (06) : 774 - 791