Dynamic Control of Flood Limited Water Levels for Parallel Reservoirs by Considering Forecast Period Uncertainty

被引:5
|
作者
Li, Yanbin [1 ]
Li, Yubo [1 ]
Feng, Kai [1 ]
Tian, Kaiyuan [1 ]
Huang, Tongxuan [1 ]
机构
[1] North China Univ Water Resources & Elect Power, Coll Water Conservancy, Zhengzhou 450045, Peoples R China
关键词
flood limited water levels; optimization model; Yiluo River Basin; parallel reservoirs; PARTICLE SWARM OPTIMIZATION; JOINT OPERATION; NSGA-II; RESOURCES; ALGORITHM; MODEL; MANAGEMENT;
D O I
10.3390/su152416765
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The objective of this study is to achieve the dynamic optimization of the flood limited water level (FLWL) in parallel reservoirs, using Luhun Reservoir and Guxian Reservoir as case studies. The innovation lies in establishing a dynamic control optimization model for the FLWL of parallel reservoirs, considering the uncertainty in the forecasting period of the flood forecast due to the varying locations of the rainstorm center from upstream to downstream. To commence, the Fisher optimal segmentation method is employed for flood season staging to determine the staged FLWL of each reservoir. Subsequently, considering the uncertainty in the foresight period, the upper range of the dynamic FLWL is determined through the improved pre-discharge capacity constraint method and Monte Carlo simulation. Finally, a multi-objective optimization model is established to determine the optimal dynamic FLWL control operation scheme for parallel reservoirs, utilizing the Non-Dominated Sorting Genetic Algorithm II (NSGA-II). This model takes into account both downstream flood control requirements and the water supply benefits of the parallel reservoirs. Through the optimization of the scheme, the water supply of the parallel reservoirs can be augmented by 15,347.6 m3 during the flood season. This optimization effectively achieves a harmonious balance between flood control and water supply, holding significant implications for mitigating drought risks amid changing conditions.
引用
收藏
页数:22
相关论文
共 50 条
  • [31] Flood Risk Quantification, Transmission, and Propagation Analysis for Flood Water Utilization of Parallel Reservoirs
    Ding, Wei
    Zhang, Chi
    Lin, Jie
    Zhao, Xi
    Ning, Yawei
    Zhou, Huicheng
    JOURNAL OF HYDROLOGY, 2023, 618
  • [32] Optimal method to establish joint flood control operation rules with flood forecast information for cascade reservoirs
    Zhang, Gai-Hong
    Wang, Guo-Li
    Zhang, Jing
    Tian, Li
    Dalian Ligong Daxue Xuebao/Journal of Dalian University of Technology, 2010, 50 (01): : 123 - 130
  • [33] Analysis of flood control risk in floodwater utilization considering the uncertainty of flood volume and peak
    Du, Huihua
    Wang, Zongzhi
    Yin, Jun
    FRONTIERS IN EARTH SCIENCE, 2023, 11
  • [34] Flood Control with Model Predictive Control for River Systems with Water Reservoirs
    Breckpot, Maarten
    Agudelo, Oscar Mauricio
    De Moor, Bart
    JOURNAL OF IRRIGATION AND DRAINAGE ENGINEERING, 2013, 139 (07) : 532 - 541
  • [35] Analysis of inflow design flood for Liujiaxia reservoir under dynamic operation of flood limited water level for ten-day period
    Li, Jiqing
    Shen, Di
    Wang, Aijing
    Zhang, Yushan
    ADVANCES IN HYDROLOGY AND HYDRAULIC ENGINEERING, PTS 1 AND 2, 2012, 212-213 : 725 - +
  • [36] Design flood and control water levels for cascade reservoirs during operation periodin the downstream Jinsha River
    Xiong F.
    Guo S.
    Chen K.
    Yin J.
    Liu Z.
    Zhong Y.
    Hong X.
    Shuikexue Jinzhan/Advances in Water Science, 2019, 30 (03): : 401 - 410
  • [37] Credibility theory based dynamic control bound optimization for reservoir flood limited water level
    Jiang, Zhiqiang
    Sun, Ping
    Ji, Changming
    Zhou, Jianzhong
    JOURNAL OF HYDROLOGY, 2015, 529 : 928 - 939
  • [38] A method for implementing the real-time dynamic control of flood-limited water level
    Yong Peng
    Xiaoli Zhang
    Huicheng Zhou
    Bende Wang
    Environmental Earth Sciences, 2017, 76
  • [39] Research on benefit of reservoir flood resources utilization based on the dynamic control of limited water level
    Huang, Xianfeng
    Chen, Yingqin
    Lin, Jie
    Fang, Guohua
    Qu, Xiaoping
    Zhu, Lixiang
    DESALINATION AND WATER TREATMENT, 2017, 79 : 214 - 220
  • [40] A method for implementing the real-time dynamic control of flood-limited water level
    Peng, Yong
    Zhang, Xiaoli
    Zhou, Huicheng
    Wang, Bende
    ENVIRONMENTAL EARTH SCIENCES, 2017, 76 (21)