REDUCING REINFORCED CONCRETE MATERIALS WASTE IN CONSTRUCTION PROJECTS USING BUILDING INFORMATION MODELING IN EGYPT

被引:3
|
作者
Hosny, Suad [1 ]
Ibrahim, Ahmed Hussein [1 ]
Nabil, Yasmin [2 ]
机构
[1] Zagazig Univ, Fac Engn, Dept Construct Engn & Util, Construct Engn & Management, Zagazig, Egypt
[2] Zagazig Univ, Fac Engn, Dept Construct Engn & Util, Zagazig, Egypt
关键词
Reinforced Concrete (RC); Building Information Modeling (BIM); Construction Projects (CP); Waste Management (WM)); Construction Industry (CI)); Material Waste (MW); Reducing Reinforced Concrete Material waste (RRCMW); Residential projects (RP);
D O I
10.36680/j.itcon.2023.017
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Reduced Reinforced Concrete Material Waste (RRCMW) is recognized as a major issue that must be controlled in building projects. The primary goal of the study is to demonstrate the significance of BIM in construction and the importance of BIM in reducing reinforced concrete material waste. To achieve the study's goal, a questionnaire survey is undertaken to estimate the benefit of using BIM in Egyptian building projects. According to the survey results, about 41% of respondents are believed that BIM may reduce project costs by 16% to 20% when compared to the traditional method. In addition, the proportion of variations in reinforced concrete amount survey between traditional methods (AutoCAD) and (Revit) is discovered to be 44%, with a range of 11% to 15%. Approximately 46% of respondents are believed that BIM eliminates design errors, with a percentage ranging from 21% to 25%, and about 51% are believed that BIM helps in reducing rework, with a total percentage ranging from 21% to 25%. Then, case studies of building ("Residential projects") and infrastructure ("Bridges projects") projects are analyzed to determine the difference between waste minimization using traditional methods and waste minimization using BIM. Waste management is a critical issue since it is the only approach to optimize waste throughout the project phases. As a result, factors managing (RRCMW) are extracted, and BIM software should be used to manage these factors in order to optimize waste. The relevant BIM applications are used in this case study: site utilization planning, quantity take-off, 3D coordination, visualization, digital prefabrication, design validation, "design review and clash detection," and optimized workflow and communication structure. So, based on the preceding case studies, it is discovered that using BIM is far more successful and economical than using the traditional method, because it aids in the resolution of many issues before and during construction, such as clash detection, material storage, material ordering, and so on. As a result, while BIM is not widely used in Egypt, engineers should be familiar with it because it will be a vital tool to reduce waste in the future.
引用
收藏
页码:332 / 345
页数:14
相关论文
共 50 条
  • [21] Numerical Modeling of Masonry Infilled Reinforced Concrete Building during Construction Stages Using ABAQUS Software
    Roudane, Boudjamaa
    Adanur, Suleyman
    Altunisik, Ahmet Can
    [J]. BUILDINGS, 2019, 9 (08)
  • [22] Using Building Information Modeling to Retrofit Abandoned Construction Projects in Iraq to Achieve Low-energy
    Khudhaire, H. Y.
    Naji, H. I.
    [J]. INTERNATIONAL JOURNAL OF ENGINEERING, 2021, 34 (03): : 644 - 649
  • [23] Barriers to Building Information Modeling (BIM) Deployment in Small Construction Projects: Malaysian Construction Industry
    Waqar, Ahsan
    Qureshi, Abdul Hannan
    Alaloul, Wesam Salah
    [J]. SUSTAINABILITY, 2023, 15 (03)
  • [24] Expanding uses of building information modeling in life-cycle construction projects
    Hannele, Kerosuo
    Reijo, Miettinen
    Tarja, Maki
    Sami, Paavola
    Jenni, Korpela
    Teija, Rantala
    [J]. WORK-A JOURNAL OF PREVENTION ASSESSMENT & REHABILITATION, 2012, 41 : 114 - 119
  • [25] Factors affecting adoption of building information modeling in construction projects: A case of Vietnam
    Nguyen Van Tam
    Tran Ngoc Diep
    Nguyen Quoc Toan
    Nguyen Le Dinh Quy
    [J]. COGENT BUSINESS & MANAGEMENT, 2021, 8 (01):
  • [26] Potential Improvement of Building Information Modeling (BIM) Implementation in Malaysian Construction Projects
    Latiffi, Aryani Ahmad
    Mohd, Suzila
    Rakiman, Umol Syamsyul
    [J]. PRODUCT LIFECYCLE MANAGEMENT IN THE ERA OF INTERNET OF THINGS, PLM 2015, 2016, 467 : 149 - 158
  • [27] Evaluating the Impact of Building Information Modeling on the Labor Productivity of Construction Projects in Malaysia
    Wong, Jin Hong
    Rashidi, Ali
    Arashpour, Mehrdad
    [J]. BUILDINGS, 2020, 10 (04)
  • [28] Streamlining the data transformation process for construction projects via Building Information Modeling
    Chen, Yi-Jao
    Feng, Chung-Wei
    [J]. 25TH INTERNATIONAL SYMPOSIUM ON AUTOMATION AND ROBOTICS IN CONSTRUCTION - ISARC-2008, 2008, : 549 - +
  • [29] Facilitating claims settlement using building information modeling in the school building projects
    Rehab Abdul Razzaq Ibraheem
    Ahmed Mohammed Raoof Mahjoob
    [J]. Innovative Infrastructure Solutions, 2022, 7
  • [30] Facilitating claims settlement using building information modeling in the school building projects
    Ibraheem, Rehab Abdul Razzaq
    Mahjoob, Ahmed Mohammed Raoof
    [J]. INNOVATIVE INFRASTRUCTURE SOLUTIONS, 2022, 7 (01)