Spatio-temporal optimization of construction elevator planning in high-rise building projects

被引:1
|
作者
Wu, Keyi [1 ]
de Soto, Borja Garcia [1 ]
机构
[1] New York Univ Abu Dhabi, Div Engn, SMART Construct Res Grp, Abu Dhabi, U Arab Emirates
来源
关键词
Construction hoist; Temporary elevator; Vertical transportation; Mixed-integer programming; TRANSPORTATION; SIMULATION; HOIST; TIME;
D O I
10.1016/j.dibe.2024.100328
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Appropriate construction elevator planning is beneficial for successfully completing high-rise building projects. Construction elevator planning typically remains unchanged throughout a high-rise building project or seldom involves the designation of service days, which causes such planning not to respond effectively to variable transportation demands and adversely affects the possibility of further optimization. Another limitation is that the installation and dismantlement dates of construction elevators, which are highly important when multiple construction elevators are used, cannot be explicitly determined in construction elevator planning. To solve these weaknesses, this paper proposes an approach to assign construction elevator cabs to serve designated days and floors based on actual transportation demands from the perspective of spatio-temporal optimization with mixedinteger programming. The experimental case study results show that the presented planning can significantly reduce the total cost when compared to other planning and can provide evidence and explanation for determining the installation and dismantlement dates of construction elevators.
引用
收藏
页数:25
相关论文
共 50 条
  • [31] High-rise Building Optimization A Design Studio Curriculum
    Pasternak, Agata
    Kwiecinski, Krystian
    ECAADE 2015: REAL TIME - EXTENDING THE REACH OF COMPUTATION, VOL 1, 2015, : 305 - 314
  • [32] Application of multi-criteria analysis in the selection of formwork material for high-rise building construction projects
    Pham, Vu Hong Son
    Dau, Thuy Dung
    Tran, Le Anh
    COGENT ENGINEERING, 2024, 11 (01):
  • [33] ELEVATOR SPACE REQUIREMENTS IN HIGH-RISE BUILDINGS
    OCHSNER, JK
    KRAHL, NW
    TODD, A
    ARCHITECTURAL RECORD, 1977, 162 (01) : 117 - 118
  • [34] Spatio-Temporal Data Construction
    Le, Hai Ha
    ISPRS INTERNATIONAL JOURNAL OF GEO-INFORMATION, 2013, 2 (03): : 837 - 853
  • [35] Spatio-temporal dynamics of resident and immigrating populations of Carcinops pumilio (Coleoptera: Histeridae) in high-rise poultry facilities
    Tobin, PC
    Fleischer, SJ
    Pitts, CW
    JOURNAL OF MEDICAL ENTOMOLOGY, 1999, 36 (05) : 568 - 577
  • [36] Topology optimization of thermally activated building system in high-rise building
    He, Xianya
    Huang, Jingzhi
    Liu, Zekun
    Lin, Jian
    Jing, Rui
    Zhao, Yingru
    ENERGY, 2023, 284
  • [37] An Analysis of the Control Points in the High-rise Building Construction Management
    Fan, Yong
    Shi, Ke Bin
    SUSTAINABLE CITIES DEVELOPMENT AND ENVIRONMENT, PTS 1-3, 2012, 209-211 : 1389 - 1395
  • [38] Study on Necessity and Safety Measures of Elevator Evacuation During High-rise Building Fire
    Liu, Jianmin
    ADVANCED BUILDING MATERIALS AND SUSTAINABLE ARCHITECTURE, PTS 1-4, 2012, 174-177 : 3023 - 3026
  • [39] Experimental study on vibration control for rope-sway of elevator of high-rise building
    Otsuki, M
    Yoshida, K
    Nagata, K
    Fujimoto, S
    Nakagawa, T
    PROCEEDINGS OF THE 2002 AMERICAN CONTROL CONFERENCE, VOLS 1-6, 2002, 1-6 : 238 - 243
  • [40] Assessment of Risk Factors to Cost and Schedule in High-Rise Building Projects
    Bardakci, Gunes
    CTBUH Journal, 2020, 2020 (03) : 28 - 35