摘要
PurposeThe oil and gas industry form the main resource of economy in Iraq and constructing any project in such sectors requires a huge amount of expenses due to the unique requirements that oil and gas facilities required in such projects. Therefore, adopting an appropriate technological approach such as building information modeling (BIM) which is unfortunately not adopted yet in Iraq is essential to successfully deliver these projects. Thus, this paper aimed to introduce BIM to Iraq through Basra Oil Company (BOC) which is one of the biggest public oil and gas companies in Iraq.Design/methodology/approachThe related literature of journals articles, conference proceedings and published reports have been reviewed. As a result, firstly: a hypothesis has been derived that is "If Basra Oil Company (BOC) adopts and applies BIM approach instead of the 2D approach currently used to manage its projects, the company can overcome several constraints in managing its projects that associated with such 2D traditional approach"; secondly: homogenous, consistence and reliable web-based questionnaire has been designed as its Cronbach's alpha equal to 0.897 and 0.711 for BIM benefits and barriers, respectively. This questionnaire distributed to the BOC related professionals to test such hypothesis by investigating their readiness and accepting of BIM approach and to rank BIM barriers based on five-point Likert scale.FindingsBased on the analysis using IBM SPSS Statistics 26 of 115 responses, almost 50% of the respondents had experience 11-15 years, while 22.6% had experience more than 15 years in oil and gas industry construction projects. Those participants were from diverse engineering majors that are: 4.3% Architectural Engineers, 31.3% Civil Engineers, 20% Mechanical Engineers, 22.6% Electrical Engineers and 21.7% from other engineering majors. The respondents' departments demography was 16.5% of design department, 12.2% of construction department, 20.9% of Project Management Department, 12.2% of Maintenance department, 4.3% of HSE Department, 13% of Production Department and 20.9% of "Other Department." The study resulted in 1: accepting BIM approach to be an alternative of current 2D-traditional approach used by the company to manage and construct its projects, since mean of collected data is (4.4332), Kruskal-Wallis H test significance values were 0.398 and 0.372; and ANOVA test significance values were 0.433 and 0.599 among Engineering Majors groups and Company's Department groups, respectively. 2: Disclosed and sequenced BIM barriers in the company based on their criticality. 3: verifying reliably how BIM attributes are important to oil and gas construction projects in Iraq, 4: the company top management and company policies are the most critical potential factors to hinder or adopt and implement BIM in the company, 5: while cost is not seen a critical barrier to implement BIM in the oil and gas sector.Research limitations/implicationsThe limitation of this study is the excluding of decision makers of BOC, thus more profound future studies need to be conducted where top management and decision makers are involved, particularly the present study demonstrated that support of company top management is the most critical factor which can help the company to adopt (BIM).Originality/valueThe study concludes that BIM approach is valuable for managing projects in oil and gas sector in Iraq and identify the originality in output by using the research method. This noble study provides a leverage for enhanced research to adopt and implement building information modeling (BIM) in Iraq as the study originally demonstrates benefits and identifies the critical barriers in BIM implementation to push the boundaries toward adopt Digitalization and reduce CO2 emission in Iraqi oil and gas sector. The study can be used as evidence and platform to encourage professionals and practitioners to present more sophisticated tools of BIM in the oil and gas industry, especially for facility and operation management. These findings achieved via oil and gas experts, and it is first time to achieve such findings from a case study in Iraqi oil and gas sector.
引用
收藏
页数:22
相关论文
共 50 条
  • [41] Application of Classic and Novel Metaheuristic Algorithms in a BIM-Based Resource Tradeoff in Dam Projects
    Shishehgarkhaneh, Milad Baghalzadeh
    Moradinia, Sina Fard
    Keivani, Afram
    Azizi, Mahdi
    [J]. SMART CITIES, 2022, 5 (04): : 1441 - 1464
  • [42] Factors, Challenges and Strategies of Trust in BIM-Based Construction Projects: A Case Study in Malaysia
    Farouk, Abdelrahman M.
    Zulhisham, Ahmad Zhahiruddin
    Lee, Yong Siang
    Rajabi, Mohammad Sadra
    Rahman, Rahimi A.
    [J]. INFRASTRUCTURES, 2023, 8 (01)
  • [43] BIM-based multi-objective optimization framework for volumetric analysis of building projects
    Padala, S. P. Sreenivas
    Skanda, Prabhanjan M.
    [J]. JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2024,
  • [44] Formulating the application functional requirements of a BIM-based collaboration platform to support IPD projects
    Zhiliang Ma
    Jiankun Ma
    [J]. KSCE Journal of Civil Engineering, 2017, 21 : 2011 - 2026
  • [45] BIM-based framework to quantify delays and cost overruns due to changes in construction projects
    Honnappa D.
    Padala S.P.S.
    [J]. Asian Journal of Civil Engineering, 2022, 23 (5) : 707 - 725
  • [46] Analysis of Improvement of BIM-Based Digitalization in Engineering, Procurement, and Construction (EPC) Projects in China
    Zheng, Yu
    Tang, Llewellyn C. M.
    Chau, K. W.
    [J]. APPLIED SCIENCES-BASEL, 2021, 11 (24):
  • [47] BIM-BASED PROGRAM INFORMATION MANAGEMENT SYSTEMS FOR URBAN RENEWAL MEGA PROJECTS PLANNING
    Choi, Hyeon-Jeong
    Kwon, Min-Ji
    Kim, Ju-Hyung
    Kim, Jae-Jun
    [J]. PROCEEDINGS OF THE FIRST INTERNATIONAL CONFERENCE ON SUSTAINABLE URBANIZATION (ICSU 2010), 2010, : 294 - 304
  • [48] Predicting implications of design changes in BIM-based construction projects through machine learning
    Abdulfattah, Basem S.
    Abdelsalam, Hassan A.
    Abdelsalam, Mai
    Bolpagni, Marzia
    Thurairajah, Niraj
    Perez, Laura Florez
    Butt, Talib E.
    [J]. AUTOMATION IN CONSTRUCTION, 2023, 155
  • [49] Benefits and Challenges of Implementing the Common Data Environments in the Construction Phase of BIM-Based Projects
    Seyis, Senem
    Ozkan, Selen
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2024, 150 (08)
  • [50] BIM-based approach for optimizing life cycle costs of sustainable buildings
    Marzouk, Mohamed
    Azab, Shimaa
    Metawie, Mahmoud
    [J]. JOURNAL OF CLEANER PRODUCTION, 2018, 188 : 217 - 226