BIM-based approach to manage Basra Oil Company projects

被引:0
|
作者
Alsemari, Mohammed Ali Abd Ali [1 ]
Ramegowda, Manu [1 ]
机构
[1] Teesside Univ, Sch Comp Engn & Digital Technol, Dept Engn, Middlesbrough, England
关键词
Basra Oil Company; BIM approach adoption; 2D-traditional approach; BIM benefits; BIM barriers; 4D planning; Visualization; IMPLEMENTATION; TECHNOLOGIES; BENEFITS; BARRIERS; ADOPTION; DESIGN; ENERGY; TOOLS;
D O I
10.1108/SASBE-07-2023-0181
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
PurposeThe oil and gas industry form the main resource of economy in Iraq and constructing any project in such sectors requires a huge amount of expenses due to the unique requirements that oil and gas facilities required in such projects. Therefore, adopting an appropriate technological approach such as building information modeling (BIM) which is unfortunately not adopted yet in Iraq is essential to successfully deliver these projects. Thus, this paper aimed to introduce BIM to Iraq through Basra Oil Company (BOC) which is one of the biggest public oil and gas companies in Iraq.Design/methodology/approachThe related literature of journals articles, conference proceedings and published reports have been reviewed. As a result, firstly: a hypothesis has been derived that is "If Basra Oil Company (BOC) adopts and applies BIM approach instead of the 2D approach currently used to manage its projects, the company can overcome several constraints in managing its projects that associated with such 2D traditional approach"; secondly: homogenous, consistence and reliable web-based questionnaire has been designed as its Cronbach's alpha equal to 0.897 and 0.711 for BIM benefits and barriers, respectively. This questionnaire distributed to the BOC related professionals to test such hypothesis by investigating their readiness and accepting of BIM approach and to rank BIM barriers based on five-point Likert scale.FindingsBased on the analysis using IBM SPSS Statistics 26 of 115 responses, almost 50% of the respondents had experience 11-15 years, while 22.6% had experience more than 15 years in oil and gas industry construction projects. Those participants were from diverse engineering majors that are: 4.3% Architectural Engineers, 31.3% Civil Engineers, 20% Mechanical Engineers, 22.6% Electrical Engineers and 21.7% from other engineering majors. The respondents' departments demography was 16.5% of design department, 12.2% of construction department, 20.9% of Project Management Department, 12.2% of Maintenance department, 4.3% of HSE Department, 13% of Production Department and 20.9% of "Other Department." The study resulted in 1: accepting BIM approach to be an alternative of current 2D-traditional approach used by the company to manage and construct its projects, since mean of collected data is (4.4332), Kruskal-Wallis H test significance values were 0.398 and 0.372; and ANOVA test significance values were 0.433 and 0.599 among Engineering Majors groups and Company's Department groups, respectively. 2: Disclosed and sequenced BIM barriers in the company based on their criticality. 3: verifying reliably how BIM attributes are important to oil and gas construction projects in Iraq, 4: the company top management and company policies are the most critical potential factors to hinder or adopt and implement BIM in the company, 5: while cost is not seen a critical barrier to implement BIM in the oil and gas sector.Research limitations/implicationsThe limitation of this study is the excluding of decision makers of BOC, thus more profound future studies need to be conducted where top management and decision makers are involved, particularly the present study demonstrated that support of company top management is the most critical factor which can help the company to adopt (BIM).Originality/valueThe study concludes that BIM approach is valuable for managing projects in oil and gas sector in Iraq and identify the originality in output by using the research method. This noble study provides a leverage for enhanced research to adopt and implement building information modeling (BIM) in Iraq as the study originally demonstrates benefits and identifies the critical barriers in BIM implementation to push the boundaries toward adopt Digitalization and reduce CO2 emission in Iraqi oil and gas sector. The study can be used as evidence and platform to encourage professionals and practitioners to present more sophisticated tools of BIM in the oil and gas industry, especially for facility and operation management. These findings achieved via oil and gas experts, and it is first time to achieve such findings from a case study in Iraqi oil and gas sector.
引用
收藏
页数:22
相关论文
共 50 条
  • [1] BIM-Based Approach to House Renovation Projects Assessment
    Strug, Barbara
    Slusarczyk, Grazyna
    [J]. ARTIFICIAL INTELLIGENCE AND SOFT COMPUTING, ICAISC 2022, PT II, 2023, 13589 : 336 - 345
  • [2] An integrated BIM-based approach for cost estimation in construction projects
    Fazeli, Abdulwahed
    Dashti, Mohammad Saleh
    Jalaei, Farzad
    Khanzadi, Mostafa
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2021, 28 (09) : 2828 - 2854
  • [3] DIGITALIZATION AND PROCUREMENT IN CONSTRUCTION PROJECTS: AN INTEGRATED BIM-BASED APPROACH
    Matos, Bruno C.
    Cruz, Carlos O.
    Branco, Fernando B.
    [J]. JOURNAL OF INFORMATION TECHNOLOGY IN CONSTRUCTION, 2024, 29 : 400 - 423
  • [4] Constructability and Sustainability Studies in Conceptual Projects: A BIM-Based Approach
    Barros, Belarmino Augusto F. S.
    Sotelino, Elisa D. D.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2023, 149 (04)
  • [5] BIM-based benchmarking for healthcare construction projects
    Choi, Jiyong
    Leite, Fernanda
    de Oliveira, Daniel P.
    [J]. AUTOMATION IN CONSTRUCTION, 2020, 119
  • [6] Prerequisites for BIM-based invoicing in NATM projects
    Winkler L.
    Melnyk O.
    Goger G.
    [J]. Geomechanik und Tunnelbau, 2022, 15 (03): : 279 - 283
  • [7] BIM-based benchmarking for healthcare construction projects
    Choi, Jiyong
    Leite, Fernanda
    de Oliveira, Daniel P.
    [J]. Automation in Construction, 2020, 119
  • [8] BIM-Based Knowledge Management in Construction Projects
    Wang, Hao
    Meng, Xianhai
    [J]. INTERNATIONAL JOURNAL OF INFORMATION TECHNOLOGY PROJECT MANAGEMENT, 2018, 9 (02) : 20 - 37
  • [9] BIM-BASED SIMPLIFIED APPROACH TO AUTOMATICALLY ESTIMATE BUILDING COSTS FOR PROJECTS IN THAILAND
    Tokla, Suon
    Subsomboon, Kumpon
    [J]. INTERNATIONAL JOURNAL OF GEOMATE, 2020, 18 (68): : 101 - 107
  • [10] Towards a BIM-based approach for improving maintenance performance in IBS building projects
    Bin Ismail, Zul-Atfi
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2021, 28 (05) : 1468 - 1490