共 50 条
- [1] Method of Criteria Selection and Weights Calculation in the Process of Web Projects Evaluation [J]. COMPUTATIONAL COLLECTIVE INTELLIGENCE: TECHNOLOGIES AND APPLICATIONS, ICCCI 2014, 2014, 8733 : 684 - 693
- [2] PROJECT SELECTION BY USING FUZZY TOPSIS METHOD: A REAL APPLICATION IN CONSTRUCTION SECTOR [J]. UNCERTAINTY MODELING IN KNOWLEDGE ENGINEERING AND DECISION MAKING, 2012, 7 : 137 - 142
- [3] Application of DEA Method in Evaluating Performance of the Construction Projects [J]. PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2008, : 234 - 237
- [4] Application of Earned Value Method to Progress Control of Construction projects [J]. XXIII R-S-P SEMINAR, THEORETICAL FOUNDATION OF CIVIL ENGINEERING (23RSP) (TFOCE 2014), 2014, 91 : 424 - 428
- [5] Application of a method for the environmental impact assessment of university construction projects [J]. TECNOLOGIA EN MARCHA, 2016, 29 (03): : 132 - 145
- [6] The discussion of the application of EVA dividing rate method on Construction projects [J]. 2011 INTERNATIONAL CONFERENCE ON INTELLIGENT COMPUTATION AND INDUSTRIAL APPLICATION (ICIA2011), VOL I, 2011, : 484 - 487
- [7] The discussion of the application of EVA dividing rate method on Construction projects [J]. 2010 INTERNATIONAL CONFERENCE ON BIO-INSPIRED SYSTEMS AND SIGNAL PROCESSING (ICBSSP 2010), 2010, : 238 - 241
- [8] Application of entropy method in evaluating the construction projects' safety performance [J]. Proceedings of 2006 International Conference on Construction & Real Estate Management, Vols 1 and 2: COLLABORATION AND DEVELOPMENT IN CONSTRUCTION AND REAL ESTATE, 2006, : 651 - 654
- [10] Application of Real Options Method in the Decision-making of the Projects [J]. 2010 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING (MSE 2010), VOL 1, 2010, : 303 - 305