A Bi-Objective Paediatric Operating Theater Scheduling

被引:0
|
作者
Dekhici, Latifa [1 ]
Belkadi, Khaled [1 ]
机构
[1] Univ Sci & Technol Oran Mohamed Boudiaf, Bir El Djir, Algeria
关键词
Bat Algorithm PSO; Bi-Objective Scheduling; Constraint; Hybrid Flow Shop With Blocking; Makespan; Firefly Algorithm; Operating Theater; ALGORITHMS;
D O I
10.4018/IJHISI.323451
中图分类号
R-058 [];
学科分类号
摘要
In this paper, a bi-objective Operating Theater scheduling is proposed. The problem is subject to order and assignment constraints. The first objective is the minimization of the operating theater opening total time also called makespan in manufacturing systems while the second is to maximize constraints satisfaction. The scheduling problem is considered as a two-stage hybrid flow shop with blocking. Several metaheuristics are compared: the firefly algorithm, bats algorithm, particles swarm optimization and local search. In addition to the care specific qualitative and quantitative parameters, the average deviation from the lower bound is used in order to confirm the effectiveness of the methods. The implementation is done on the operating theater of the paediatric hospital of Oran when it is properly and improperly sized.
引用
下载
收藏
页数:15
相关论文
共 50 条
  • [21] Bi-objective optimization of distribution scheduling using MOPSO optimizer
    Shankar, B. Latha
    Basavarajappa, S.
    Kadadevaramath, Rajeshwar S.
    JOURNAL OF MODELLING IN MANAGEMENT, 2012, 7 (03) : 304 - 327
  • [22] Bi-Objective Flow Shop Scheduling with Equipotential Parallel Machines
    Malhotra, K.
    Gupta, D.
    Goel, S.
    Tripathi, A. K.
    MALAYSIAN JOURNAL OF MATHEMATICAL SCIENCES, 2022, 16 (03): : 451 - 470
  • [23] A multi-objective electromagnetism algorithm for a bi-objective flowshop scheduling problem
    Khalili, Majid
    Tavakkoli-Moghaddam, Reza
    JOURNAL OF MANUFACTURING SYSTEMS, 2012, 31 (02) : 232 - 239
  • [24] An efficient weighted bi-objective scheduling algorithm for heterogeneous systems
    Boeres, Cristina
    Sardina, Idalmis Milian
    Drummond, Lucia M. A.
    PARALLEL COMPUTING, 2011, 37 (08) : 349 - 364
  • [25] Bi-objective airport slot scheduling considering scheduling efficiency and noise abatement
    Feng, Huilin
    Hu, Rong
    Wang, Deyun
    Zhang, Junfeng
    Wu, Chuntao
    TRANSPORTATION RESEARCH PART D-TRANSPORT AND ENVIRONMENT, 2023, 115
  • [26] Technology enhancement of surgeries scheduling: a bi-objective optimization model
    Khalfalli, Marwa
    Ben Abdelaziz, Fouad
    Verny, Jerome
    Masmoudi, Meryem
    MANAGEMENT DECISION, 2020, 58 (11) : 2513 - 2525
  • [27] Bi-Objective Online Scheduling with Quality of Service for IaaS Clouds
    Tchernykh, Andrei
    Lozano, Luz
    Schwiegelshohn, Uwe
    Bouvry, Pascal
    Pecero, Johnatan E.
    Nesmachnow, Sergio
    2014 IEEE 3RD INTERNATIONAL CONFERENCE ON CLOUD NETWORKING (CLOUDNET), 2014, : 307 - 312
  • [28] Bi-objective Optimization in Identical Parallel Machine Scheduling Problem
    Bathrinath, Sankaranarayanan
    Sankar, S. Saravana
    Ponnambalam, S. G.
    Kannan, B. K. V.
    SWARM, EVOLUTIONARY, AND MEMETIC COMPUTING, PT I (SEMCCO 2013), 2013, 8297 : 377 - 388
  • [29] An efficient bi-objective heuristic for scheduling of hybrid flow shops
    S. M. Mousavi
    M. Zandieh
    M. Amiri
    The International Journal of Advanced Manufacturing Technology, 2011, 54 : 287 - 307
  • [30] An efficient bi-objective heuristic for scheduling of hybrid flow shops
    Mousavi, S. M.
    Zandieh, M.
    Amiri, M.
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 54 (1-4): : 287 - 307