共 50 条
- [22] Quantitative estimation of TBM disc cutter wear from in-situ parameters by optimization algorithm improved back-propagation neural network: A case study of a metro tunnel in Guangzhou, China [J]. PROCEEDINGS OF THE ITA-AITES WORLD TUNNEL CONGRESS 2023, WTC 2023: Expanding Underground-Knowledge and Passion to Make a Positive Impact on the World, 2023, : 2627 - 2634
- [23] Application of the strain energy ratio and the equivalent thrust per cutter to predict the penetration rate of TBM, case study: Karaj-Tehran water conveyance tunnel of Iran [J]. Arabian Journal of Geosciences, 2015, 8 : 4833 - 4842
- [25] Studying the Effect of Tunnel Depth Variation on the Specific Energy of TBM, Case Study: Karaj-Tehran (Iran) Water Conveyance Tunnel [J]. JOURNAL OF ENGINEERING AND TECHNOLOGICAL SCIENCES, 2016, 48 (04): : 408 - 416
- [27] TBM performance analysis in very strong and massive rocks; case study: Kerman water conveyance tunnel project, Iran [J]. GEOMECHANICS AND GEOENGINEERING-AN INTERNATIONAL JOURNAL, 2022, 17 (04): : 1110 - 1122