Probabilistic model of disc-cutter wear in TBM construction: A case study of Chaoer to Xiliao water conveyance tunnel in China

被引:2
|
作者
Yang, Wenkun [1 ]
Chen, Zuyu [1 ,2 ]
Wu, Gensheng [3 ]
Xing, Hai [3 ]
机构
[1] Southeast Univ, Inst Future Underground Space, Sch Civil Engn, Nanjing 211189, Peoples R China
[2] China Inst Water Resources & Hydropower Res, Dept Geotech Engn, Beijing 100038, Peoples R China
[3] Sinohydro Bur 6 Co LTD, Shenyang 110179, Peoples R China
基金
中国国家自然科学基金;
关键词
tunnel boring machine; disc-cutter wear; wear rate; probability model; SHARED BIG DATASET; HARD-ROCK; PREDICTION MODEL; FEEDBACK; MACHINE;
D O I
10.1007/s11431-023-2465-y
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Disc-cutters play a crucial role in the penetration process during construction using a tunnel boring machine (TBM). Their wear status has a significant impact on working efficiency and costs that accounts for a large part of the budget. Discovering the wear pattern and characteristics of disc-cutters could provide a valuable guide for field maintenance and cutter replacement work. It also provides insight into the wear mechanism of cutters at different positions for optimizing the disc-cutter arrangement design. In this study, the cutter wears data of 34 disc-cutters over 643 days in the Chaoer River to Xiliao River water diversion tunnel was collected. The dataset contains 21862 manual readings measured from 1079 disc-cutters replaced in this project. The raw data from the hard copy version was transformed into a digital twin database by eliminating abnormal data, filling in empty values, and performing linear interpolations. It has been found that the cutters can pass statistical testing for an exponential probability distribution function with respect to the wear rate (w). The regression ratios of R2 are essentially greater than 0.8. These findings would help estimate the future service life of a currently working cutter, which means significant savings for the costly disccutters. The application of exponential distribution has the advantage of only one shape parameter, lambda, whose reciprocal represents both the statistical mean and standard deviation of the wear rates. It is simple and practically amenable. A preliminary study was carried out to simulate the wear process between two neighboring cutters for drafting a replacement plan for disc-cutters by the Monte Carlo method. The prediction results agreed reasonably well with the measured information.
引用
收藏
页码:3534 / 3548
页数:15
相关论文
共 50 条
  • [21] Construction practice of water conveyance tunnel among complex geotechnical conditions: a case study
    Duan, Kaimin
    Zhang, Guofeng
    Sun, Hui
    [J]. SCIENTIFIC REPORTS, 2023, 13 (01)
  • [22] Quantitative estimation of TBM disc cutter wear from in-situ parameters by optimization algorithm improved back-propagation neural network: A case study of a metro tunnel in Guangzhou, China
    Ding, X.
    Xie, A. Y.
    Xue, H.
    [J]. PROCEEDINGS OF THE ITA-AITES WORLD TUNNEL CONGRESS 2023, WTC 2023: Expanding Underground-Knowledge and Passion to Make a Positive Impact on the World, 2023, : 2627 - 2634
  • [23] Application of the strain energy ratio and the equivalent thrust per cutter to predict the penetration rate of TBM, case study: Karaj-Tehran water conveyance tunnel of Iran
    M. Soleiman Dehkordi
    H. A. Lazemi
    K. Shahriar
    [J]. Arabian Journal of Geosciences, 2015, 8 : 4833 - 4842
  • [24] Application of the strain energy ratio and the equivalent thrust per cutter to predict the penetration rate of TBM, case study: Karaj-Tehran water conveyance tunnel of Iran
    Dehkordi, M. Soleiman
    Lazemi, H. A.
    Shahriar, K.
    [J]. ARABIAN JOURNAL OF GEOSCIENCES, 2015, 8 (07) : 4833 - 4842
  • [25] Studying the Effect of Tunnel Depth Variation on the Specific Energy of TBM, Case Study: Karaj-Tehran (Iran) Water Conveyance Tunnel
    Mirahmadi, Majid
    Tabaei, Morteza
    Dehkordi, Mohsen Soleiman
    [J]. JOURNAL OF ENGINEERING AND TECHNOLOGICAL SCIENCES, 2016, 48 (04): : 408 - 416
  • [26] Application of TBM operational parameters to estimate the drop modulus, case study: Karaj–Tehran water conveyance tunnel of Iran
    Lazemi H.A.
    Dehkordi M.S.
    [J]. International Journal of Geo-Engineering, 7 (1)
  • [27] TBM performance analysis in very strong and massive rocks; case study: Kerman water conveyance tunnel project, Iran
    Pourhashemi, Seyed Mahdi
    Ahangari, Kaveh
    Hassanpour, Jafar
    Eftekhari, Seyed Mosleh
    [J]. GEOMECHANICS AND GEOENGINEERING-AN INTERNATIONAL JOURNAL, 2022, 17 (04): : 1110 - 1122
  • [28] Evaluation of TBM Cutter Wear in Granite and Developing a Cutter Life Prediction Model for Face Cutters Based on Field Data: A Case Study
    Liu, Jianping
    He, Tiankui
    Peng, Xingxin
    Pan, Yucong
    [J]. BUILDINGS, 2024, 14 (08)
  • [29] In-situ methods for the TBM dismantling in a long-distance and deep-buried tunnel: Case study of Xinjiang water conveyance tunnel
    Xie, Wei-Qiang
    Li, Wei-Wei
    Liu, Xiao-Li
    Tang, Shao-Hui
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2022, 129
  • [30] Full-scale test of disc cutter rotary cutting in TBM tunnelling: a case study of Mawan granite in Shenzhen, China
    Deng, Long-Chuan
    Li, Xiao-Zhao
    Xu, Wentao
    Zhang, Chi
    Zhuang, Qian-Wei
    Li, Fu-Qing
    Zhou, Qiang
    [J]. Geomechanics and Geophysics for Geo-Energy and Geo-Resources, 2024, 10 (01)