Multi-period Optimization for Long-Term Oilfield Production Planning

被引:0
|
作者
Aristizabal, Jadier [1 ]
del Mar Prieto, Maria [1 ]
Vargas, Lizzet [1 ]
Pradilla, Diego [1 ]
Gomez, Jorge M. [1 ]
机构
[1] Univ Andes, Dept Ingn Quim & Alimentos, Grp Diseno Prod & Proc GDPP, Carrera 1 Este 18A 12, Bogota, Colombia
关键词
Collocation on finite elements; Long-term horizons; Nonlinear programming; Oilfield production planning; Phenomenological model; MODEL;
D O I
10.1007/s10957-023-02191-7
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
In this work, a multi-period nonlinear programming formulation is presented to obtain the optimal long-term oilfield production planning, based on a two-phase, one-dimensional, and Cartesian-coordinated phenomenological reservoir model. The phenomenological model contains a set of second-order partial differential equations, which are approximated by a collocation on finite element method. This CFE method prevents mathematical stability limitations due to stiffness problems, resulting in an algebraic equation system added as an optimization set of constraints. This is a significant and innovating approach as there are only a handful of similar studies in the literature that integrate phenomenological models as mathematical constraints in the optimization problem. However, these works do not solve the model using long-term production planning coupled with a simultaneous strategy. Also, formulation applied to two study cases allowed solving the optimization problem within an adequate time without requiring a high-performance computing platform. Results show the economic impact of simultaneously considering the constraints and the state variables evolution throughout the reservoir's life span to obtain the optimal long-term production planning.
引用
收藏
页码:71 / 97
页数:27
相关论文
共 50 条
  • [21] Multi-period Product Configuration Change Planning: An Application of a Hybrid Algorithm Multi-period Product Configuration Change Planning
    Chiang, C. J.
    Che, Z. H.
    Wang, H. S.
    [J]. PROCEEDINGS OF THE 2009 WRI GLOBAL CONGRESS ON INTELLIGENT SYSTEMS, VOL II, 2009, : 53 - 57
  • [22] Generalized disjunctive programming model for the multi-period production planning optimization: An application in a polyurethane foam manufacturing plant
    Analia Rodriguez, Maria
    Marcelo Montagna, Jorge
    Vecchietti, Aldo
    Corsano, Gabriela
    [J]. COMPUTERS & CHEMICAL ENGINEERING, 2017, 103 : 69 - 80
  • [23] An integrated data-driven modeling & global optimization approach for multi-period nonlinear production planning problems
    Demirhan, C. Doga
    Boukouvala, Fani
    Kim, Kyungwon
    Song, Hyeju
    Tso, William W.
    Floudas, Christodoulos A.
    Pistikopoulos, Efstratios N.
    [J]. COMPUTERS & CHEMICAL ENGINEERING, 2020, 141
  • [24] PROBLEMS OF LONG-TERM PRODUCTION PLANNING
    HARRMANN, A
    [J]. BETRIEB, 1974, 27 (01): : 1 - 5
  • [25] OPTIMAL SOLUTION STRUCTURE FOR MULTI-PERIOD PRODUCTION PLANNING WITH RETURNED PRODUCTS REMANUFACTURING
    Li, Yongjian
    Zhang, Jihong
    Chen, Jian
    Cai, Xiaoqiang
    [J]. ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2010, 27 (05) : 629 - 648
  • [26] Multi-period quarry production planning through sequencing techniques and sequencing algorithm
    Mohammad Waqar Ali Asad
    [J]. Journal of Mining Science, 2008, 44 : 206 - 217
  • [27] Multi-period line planning with resource transfers
    Sahin, Guvenc
    Digehsara, Amin Ahmadi
    Borndoerfer, Ralf
    Schlechte, Thomas
    [J]. TRANSPORTATION RESEARCH PART C-EMERGING TECHNOLOGIES, 2020, 119
  • [28] Multi-period quarry production planning through sequencing techniques and sequencing algorithm
    Asad, Mohammad Waqar Ali
    [J]. JOURNAL OF MINING SCIENCE, 2008, 44 (02) : 206 - 217
  • [29] A Multi-period Stochastic Production Planning and Sourcing Problem with Discrete Demand Distribution
    Chen, Weili
    Liu, Yankui
    Wu, Xiaoli
    [J]. ADVANCES IN SWARM INTELLIGENCE, PT II, 2011, 6729 : 164 - +
  • [30] Multi-period layout planning for hospital wards
    Arnolds, Ines Verena
    Nickel, Stefan
    [J]. SOCIO-ECONOMIC PLANNING SCIENCES, 2013, 47 (03) : 220 - 237