Occupational Risk Management Method for Quarry Blasting Operations Based on Modified FMECA Algorithm

被引:0
|
作者
Dworzak, Michal [1 ]
机构
[1] AGH Univ Krakow, Fac Civil Engn & Resource Management, Mickiewicza 30 Av, Krakow, Poland
关键词
occupational risk; risk management; safety; blasting; quarry;
D O I
10.29227/IM-2023-01-30
中图分类号
TD [矿业工程];
学科分类号
0819 ;
摘要
Occupational risk assessment is one of the most crucial legal obligation for employers and the basis of accident prevention. In the case of highly repetitive work operations and an almost constant work environment, performing a preliminary risk analysis and checking risk levels periodically may be sufficient. In the case of blasting operations in quarries: the mining and geological conditions, technology, blasting methods, explosives, and initiating agents are variables that affect occupational safety. Moreover they make occupational risk assessment difficult to apply on the operational level. Therefore, occupational risk management followed by a deep analysis of hazards and their associated risks may allow to design and manage blasting works with regard to occupational risk. The paper presents the method for the support of occupational risk management in quarry blasting operations based on a modified FMECA algorithm. The designed method provides a systematic approach to risk identification, and allows to indication of the main occupational hazards that should be prioritized for preventive action. The preventive action which could be implied in the design stage by changes in technology or work organization based on options available for a particular quarry.
引用
收藏
页码:241 / 249
页数:9
相关论文
共 50 条
  • [1] Risk management and blasting operations in the demolition industry
    Lauritzen, EK
    Schneider, J
    EXPLOSIVES AND BLASTING TECHNIQUE, 2003, : 55 - 60
  • [2] RISK ASSESSMENT OF BLASTING OPERATIONS IN OPEN PIT MINES USING FAHP METHOD
    Kiani, M.
    Hosseini, S. H.
    Taji, M.
    Gholinejad, M.
    MINING OF MINERAL DEPOSITS, 2019, 13 (03): : 76 - 86
  • [3] Fuzzy Criticality Assessment of FMECA for the SADA Based on Modified FWGM Algorithm & Centroid Deffuzzification
    Gan, Luping
    Pang, Yu
    Liao, Qiang
    Xiao, Ning-Cong
    Huang, Hong-Zhong
    2011 INTERNATIONAL CONFERENCE ON QUALITY, RELIABILITY, RISK, MAINTENANCE, AND SAFETY ENGINEERING (ICQR2MSE), 2011, : 195 - 202
  • [4] Failure Risk Analysis of the Photovoltaic Modules based on the Improved FMECA Method
    Yu Rongbin
    Liu Guixiong
    Xiaoli
    2015 FIFTH INTERNATIONAL CONFERENCE ON INSTRUMENTATION AND MEASUREMENT, COMPUTER, COMMUNICATION AND CONTROL (IMCCC), 2015, : 1166 - 1170
  • [5] For an evidence based occupational risk management
    Dab, W.
    ARCHIVES DES MALADIES PROFESSIONNELLES ET DE L ENVIRONNEMENT, 2011, 72 (01) : 44 - 45
  • [6] Risk assessment on railway signal system based on Fuzzy-FMECA method
    You-Peng, Zhang
    Zheng-Jie, Xu
    Hong-Sheng, Su
    Sensors and Transducers, 2013, 156 (09): : 203 - 210
  • [7] A novel Integrated Risk Management Method for Airport operations
    Sivakumar, Senthilkumar
    JOURNAL OF AIR TRANSPORT MANAGEMENT, 2022, 105
  • [8] Risk criteria classification and the evaluation of blasting operations in open pit mines by using the FDANP method
    Kiani, Mohammad
    Hosseini, Seyed Hamid
    Taji, Mohammad
    Gholinejad, Mehran
    MINING OF MINERAL DEPOSITS, 2021, 15 (02): : 70 - 81
  • [9] Risk Assessment of Ferris wheel Trusses Based on FMECA-Fuzzy Evaluation Method
    Li, Xiang-dong
    Huang, Min-yao
    Zhang, Xin-dong
    Zhang, Wei
    Lian, Su-qian
    Wang, Zhi-rong
    PROCEEDINGS OF THE 2017 INTERNATIONAL CONFERENCE ON MANUFACTURING ENGINEERING AND INTELLIGENT MATERIALS (ICMEIM 2017), 2017, 100 : 394 - 401
  • [10] Behavior-based safety and occupational risk management
    Geller, ES
    BEHAVIOR MODIFICATION, 2005, 29 (03) : 539 - 561