Effective management of production often requires harmonizing maintenance and production activities. However, decsions on production scheduling and machine maintenance are usually made independently, leading to potential overlaps and inefficiencies. This paper joinly investigates the production scheduling and maintenance planning for a production machine subject to different types of jobs that arrive randomly. A unique emphasis is placed on the prerequisite of loading specific molds prior to job execution, an element often overlooked in previous studies. Maintenance considerations employ the reliability/availability framework. The overarching goal is the creation of an integrated schedule that minimizes the weighted sum of total costs and the machine's maximum unavailability. To address this intricate challenge, a novel hybrid differential evolution and genetic algorithm (DE-GA) is proposed, complemented by a solution refinement strategy. Performance evaluations indicate that DE-GA methodology consistently outperforms Gurobi solver and four other prevalent algorithms across different test instances.
机构:
North Univ China, Sch Mech & Power Engn, Taiyuan 030051, Peoples R China
Hefei Univ Technol, Sch Mech & Automot Engn, Hefei 230009, Anhui, Peoples R ChinaNorth Univ China, Sch Mech & Power Engn, Taiyuan 030051, Peoples R China
Wen, Haijun
Hou, Shiwang
论文数: 0引用数: 0
h-index: 0
机构:
Huaihua Univ, Sch Business, Huaihua 418000, Peoples R ChinaNorth Univ China, Sch Mech & Power Engn, Taiyuan 030051, Peoples R China
Hou, Shiwang
Liu, Zhaohua
论文数: 0引用数: 0
h-index: 0
机构:
North Univ China, Sch Mech & Power Engn, Taiyuan 030051, Peoples R ChinaNorth Univ China, Sch Mech & Power Engn, Taiyuan 030051, Peoples R China
Liu, Zhaohua
Liu, Yongjiang
论文数: 0引用数: 0
h-index: 0
机构:
North Univ China, Sch Mech & Power Engn, Taiyuan 030051, Peoples R ChinaNorth Univ China, Sch Mech & Power Engn, Taiyuan 030051, Peoples R China
机构:
King Fahd Univ Petr & Minerals, Dept Ind & Syst Engn, Dhahran, Saudi Arabia
King Fahd Univ Petr & Minerals, Interdisciplinary Res Ctr Smart Mobil & Logist, Dhahran, Saudi ArabiaKing Fahd Univ Petr & Minerals, Dept Ind & Syst Engn, Dhahran, Saudi Arabia
Attia, Ahmed M.
Alatwi, Ahmad O.
论文数: 0引用数: 0
h-index: 0
机构:
King Fahd Univ Petr & Minerals, Dept Ind & Syst Engn, Dhahran, Saudi Arabia
King Fahd Univ Petr & Minerals, Interdisciplinary Res Ctr Smart Mobil & Logist, Dhahran, Saudi ArabiaKing Fahd Univ Petr & Minerals, Dept Ind & Syst Engn, Dhahran, Saudi Arabia
Alatwi, Ahmad O.
Al Hanbali, Ahmad
论文数: 0引用数: 0
h-index: 0
机构:
King Fahd Univ Petr & Minerals, Dept Ind & Syst Engn, Dhahran, Saudi Arabia
King Fahd Univ Petr & Minerals, Interdisciplinary Res Ctr Smart Mobil & Logist, Dhahran, Saudi ArabiaKing Fahd Univ Petr & Minerals, Dept Ind & Syst Engn, Dhahran, Saudi Arabia
Al Hanbali, Ahmad
Alsawafy, Omar G.
论文数: 0引用数: 0
h-index: 0
机构:
King Fahd Univ Petr & Minerals, Dept Ind & Syst Engn, Dhahran, Saudi Arabia
King Fahd Univ Petr & Minerals, Interdisciplinary Res Ctr Intelligent Mfg & Robot, Dhahran, Saudi ArabiaKing Fahd Univ Petr & Minerals, Dept Ind & Syst Engn, Dhahran, Saudi Arabia