Time-jerk optimal trajectory planning for industrial robots with coupled interpolation function selection

被引:1
|
作者
Wang, Shilong [1 ,2 ]
Zhang, Bokai [1 ]
Zhou, Jie [1 ]
Yang, Bo [1 ]
He, Yan [1 ]
机构
[1] Chongqing Univ, State Key Lab Mech Transmiss, Chongqing, Peoples R China
[2] Chongqing Univ, State Key Lab Mech Transmiss, 174 Shazhengjie, Chongqing 400044, Peoples R China
基金
中国国家自然科学基金;
关键词
benchmark function; coupled interpolation function; IMOGEO; industrial robot; stirring operation; time-jerk optima; trajectory planning; OPTIMIZATION; ALGORITHMS;
D O I
10.1002/rob.22298
中图分类号
TP24 [机器人技术];
学科分类号
080202 ; 1405 ;
摘要
In the contemporary field of optimal trajectory planning for industrial robots, it is customary to construct trajectories through the manual predefinition of interpolation functions. Unfortunately, this method frequently overlooks the influence of the interpolation function itself on the optimization objectives, resulting in suboptimal outcomes. To remedy this limitation, an optimal trajectory planning method with coupled interpolation function selection is proposed, in which the total task time and the integral squared jerk are defined as optimization objectives. This method minimizes the optimization objectives while also factoring in the optimal interpolation function, and avoiding subjective interference. To address the aforementioned biobjective optimization problem better, an Improved MultiObjective Golden Eagle Optimizer is introduced. Population diversity and the ability to escape local optima are enhanced through the incorporation of Chaotic Mapping, Opposition-Based Learning, Differential Evolution, and adaptive inertia weight strategy into the algorithm. The superiority of the algorithm is validated through a series of simulations on 17 benchmark functions. In the context of the robotic stirring operation within the automated block cast charging process, the proposed method is utilized to derive the time-jerk optimal trajectory. The results demonstrate the effectiveness of the proposed method.
引用
收藏
页码:917 / 941
页数:25
相关论文
共 50 条
  • [41] Time-optimal trajectory planning for industrial robots with end-effector acceleration constraints
    Romero, Samuel
    Maria Montes, Ana
    Rodriguez, Carlos F.
    Alvarez Martinez, David
    Valero, Jorge S.
    [J]. 2023 IEEE 6TH COLOMBIAN CONFERENCE ON AUTOMATIC CONTROL, CCAC, 2023, : 107 - 112
  • [42] Optimal trajectory planning for industrial robots using harmony search algorithm
    Chen, Youdong
    Yan, Liang
    Wei, Hongxing
    Wang, Tianmiao
    [J]. INDUSTRIAL ROBOT-THE INTERNATIONAL JOURNAL OF ROBOTICS RESEARCH AND APPLICATION, 2013, 40 (05): : 502 - 512
  • [43] Time-Optimal Trajectory Planning for Flexible Joint Robots
    Palleschi, Alessandro
    Mengacci, Riccardo
    Angelini, Franco
    Caporale, Danilo
    Pallottino, Lucia
    De Luca, Alessandro
    Garabini, Manolo
    [J]. IEEE ROBOTICS AND AUTOMATION LETTERS, 2020, 5 (02) : 938 - 945
  • [44] Time-Optimal Trajectory Planning for Industrial Robot
    Chen Weihua
    Zhang Tie
    Zou Yanbiao
    [J]. ISTM/2009: 8TH INTERNATIONAL SYMPOSIUM ON TEST AND MEASUREMENT, VOLS 1-6, 2009, : 2847 - 2850
  • [45] Time-Optimal Trajectory Planning for Robots with Identified Dynamics
    Lin, Shize
    Wang, Ze
    Hu, Chuxiong
    Zhu, Yu
    [J]. 2021 IEEE INTERNATIONAL CONFERENCE ON ROBOTICS AND BIOMIMETICS (IEEE-ROBIO 2021), 2021, : 1890 - 1895
  • [46] A Time Optimal Trajectory Planning of the Metamorphic Industrial Robot
    Wang, Rugui
    Dong, Yichen
    Chen, Huiqing
    [J]. Jixie Gongcheng Xuebao/Journal of Mechanical Engineering, 2023, 59 (05): : 100 - 111
  • [47] SYNTHESIS OF OPTIMAL TRAJECTORY OF INDUSTRIAL ROBOTS
    VALASEK, M
    [J]. KYBERNETIKA, 1986, 22 (05) : 409 - 424
  • [48] Optimal time trajectories for industrial robots with torque, power, jerk and energy consumed constraints
    Rubio, Francisco
    Valero, Francisco
    Sunyer, Joseph
    Cuadrado, Juan
    [J]. INDUSTRIAL ROBOT-AN INTERNATIONAL JOURNAL, 2012, 39 (01) : 92 - 100
  • [49] OPTIMAL CRUISING TRAJECTORY PLANNING FOR ROBOTS
    SOMLO, J
    PODURAJEV, J
    [J]. MECHATRONICS, 1994, 4 (05) : 517 - 538
  • [50] A practical approach for minimum-time trajectory planning for industrial robots
    Kim, Joonyoung
    Kim, Sung-Rak
    Kim, Soo-Jong
    Kim, Dong-Hyeok
    [J]. INDUSTRIAL ROBOT-AN INTERNATIONAL JOURNAL, 2010, 37 (01) : 51 - 61