共 50 条
- [42] Single machine scheduling with sequence-dependent setup times and delayed precedence constraints Operational Research, 2020, 20 : 927 - 942
- [44] An Exact Approach for the Identical Parallel Machine Scheduling Problem with Sequence-Dependent Setup Times and the Job Splitting Property 2016 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2016, : 721 - 725
- [45] A single-machine deteriorating job scheduling problem of minimizing the makespan with release times IMECS 2008: INTERNATIONAL MULTICONFERENCE OF ENGINEERS AND COMPUTER SCIENTISTS, VOLS I AND II, 2008, : 1952 - 1957
- [50] Advanced Algorithms for the Reclaimer Scheduling Problem with Sequence-Dependent Setup Times and Availability Constraints METAHEURISTICS, MIC 2024, PT I, 2024, 14753 : 291 - 308