The Shewhart-type RZ control chart for monitoring the ratio of autocorrelated variables

被引:7
|
作者
Huu Du Nguyen [1 ]
Nadi, Adel Ahmadi [2 ]
Kim Duc Tran [3 ]
Castagliola, Philippe [4 ,5 ]
Celano, Giovanni [6 ]
Kim Phuc Tran [2 ]
机构
[1] Hanoi Univ Sci & Technol, Sch Appl Math & Informat, Hanoi, Vietnam
[2] Univ Lille, ENSAIT, ULR 2461 GEMTEX Genie & Mat Text, Lille, France
[3] Dong A Univ, Int Res Inst Artificial Intelligence & Data Sci, Danang, Vietnam
[4] Nantes Univ, Nantes, France
[5] LS2N UMR CNRS 6004, Nantes, France
[6] Univ Catania, Dept Civil Engn & Architecture, Catania, Italy
关键词
Quality control; multivariate autoregressive model; control charts; anomaly detection; autocorrelated data; PERFORMANCE; FOREST;
D O I
10.1080/00207543.2022.2137594
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In many industrial manufacturing processes, the quality of products can depend on the relative amount between two quality characteristics X and Y. Often, this calls for the on-line monitoring of the ratio Z = X/Y as a quality characteristic itself by means of a control chart. A large number of control charts monitoring the ratio have been investigated in the literature under the assumption of independent normal observations of the two quality characteristics. In practice, due to the high frequency in sensor data collection, both autocorrelation and cross-correlation between consecutive observations can exist for X and Y and should be modelled to protect against the false alarm rate inflation when implementing a control chart for monitoring the ratio Z = X/Y. In this paper, we tackle this problem by investigating the performance of the Phase II Shewhart-type RZ control chart monitoring the ratio of two normal variables whose relationship is captured by a bivariate time series autoregressive model VAR(1), which can also account for the cross-correlation between the two quality characteristics. With the numerical study, we discuss how the design and the statistical performance of the Shewhart-type RZ control chart change with the VAR(1) model's parameters. We also provide an example to illustrate the use of the Shewhart-type RZ control chart with bivariate time series of observations in a furnace process.
引用
收藏
页码:6746 / 6771
页数:26
相关论文
共 50 条