Chance-Constrained Flight Level Assignment Problem

被引:0
|
作者
Wang, Chenghao [1 ]
Fundo, Akli [2 ]
Leger, Jean-Benoist [1 ]
Nace, Dritan [1 ]
机构
[1] Univ Technol Compiegne, CNRS, UMR 7253, Lab Heudiasyc, F-60200 Compiegne, France
[2] Polytech Univ Tirana, Dept Math, Tirana 1000, Albania
关键词
Aircraft; Delays; Uncertainty; Atmospheric modeling; Air traffic control; Resource management; Trajectory; Flight level assignment problem; chance-constraint optimization; solution feasibility probability estimation; tractable approximation; TRAFFIC FLOW MANAGEMENT;
D O I
10.1109/TITS.2023.3253303
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In this paper, we study in detail the problem and its chance-constrained variant. Like, the chance-constrained problem is strongly -hard, and solving it exactly is out of reach, even for moderate realistic instances. An efficient heuristic is therefore proposed to deal with the whole problem by solving iteratively the chance-constrained problem separately for each flight level. The approach used to solve the latter problem consists in a constraint generation one which adds iteratively new constraints until reaching the probability threshold for the specific chance-constrained subproblem. An essential aspect of this method is the fast feasibility probability estimation of the chance-constrained constraints of a given solution. Numerical results support our findings.
引用
收藏
页码:6065 / 6081
页数:17
相关论文
共 50 条
  • [31] On the chance-constrained minimum spanning k-core problem
    Ma, Juan
    Balasundaram, Balabhaskar
    JOURNAL OF GLOBAL OPTIMIZATION, 2019, 74 (04) : 783 - 801
  • [32] Chance-Constrained Active Inference
    van de Laar, Thijs
    Senoz, Ismail
    Ozcelikkale, Ayca
    Wymeersch, Henk
    NEURAL COMPUTATION, 2021, 33 (10) : 2710 - 2735
  • [33] CHANCE-CONSTRAINED GENERALIZED NETWORKS
    CHARNES, A
    KIRBY, M
    RAIKE, W
    OPERATIONS RESEARCH, 1966, 14 (06) : 1113 - &
  • [34] CHANCE-CONSTRAINED EFFICIENCY EVALUATION
    OLESEN, OB
    PETERSEN, NC
    MANAGEMENT SCIENCE, 1995, 41 (03) : 442 - 457
  • [35] A NOTE ON CHANCE-CONSTRAINED PROGRAMMING
    HEILMANN, WR
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1983, 34 (06) : 533 - 537
  • [36] Dynamic Traffic Assignment under Uncertainty: A Distributional Robust Chance-Constrained Approach
    Chung, Byung Do
    Yao, Tao
    Zhang, Bo
    NETWORKS & SPATIAL ECONOMICS, 2012, 12 (01): : 167 - 181
  • [37] CHANCE-CONSTRAINED ACTIVITY ANALYSIS
    THORE, S
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1987, 30 (03) : 267 - 269
  • [38] Dynamic Traffic Assignment under Uncertainty: A Distributional Robust Chance-Constrained Approach
    Byung Do Chung
    Tao Yao
    Bo Zhang
    Networks and Spatial Economics, 2012, 12 : 167 - 181
  • [39] Chance-constrained genetic algorithms
    Loughlin, DH
    Ranjithan, SR
    GECCO-99: PROCEEDINGS OF THE GENETIC AND EVOLUTIONARY COMPUTATION CONFERENCE, 1999, : 368 - 376
  • [40] ON BALUT ALGORITHM AND NP-COMPLETENESS FOR A CHANCE-CONSTRAINED SCHEDULING PROBLEM
    KISE, H
    IBARAKI, T
    MANAGEMENT SCIENCE, 1983, 29 (03) : 384 - 388