Model for Predicting Horizontal Well Transient Productivity in the Bottom-Water Reservoir with Finite Water Bodies

被引:2
|
作者
Jia, Xiaofei [1 ,2 ]
Sun, Zhaobo [3 ]
Lei, Guanglun [1 ,4 ]
Yao, Chuanjin [1 ,4 ]
机构
[1] China Univ Petr East China, Sch Petr Engn, Qingdao 266580, Peoples R China
[2] China Ltd, China Natl Offshore Oil Corp, Tianjin Branch, Tianjin 300459, Peoples R China
[3] Int Ltd, China Natl Offshore Oil Corp, Beijing 100029, Peoples R China
[4] China Univ Petr East China, Key Lab Unconvent Oil & Gas Dev, Minist Educ, Qingdao 266580, Peoples R China
关键词
finite water bodies; bottom-water reservoir; horizontal well; transient productivity; pressure response;
D O I
10.3390/en16041952
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
To better understand the horizontal well transient productivity in the bottom-water reservoir with finite water bodies, the horizontal well transient productivity model for the bottom-water reservoir with finite water-body multiple was developed using Green's function and potential superposition method. Laplace transforms, Fourier transforms, superposition of point source, and Duhamel principle were used to obtain the transient productivity of the horizontal well, and the transient productivity of the horizontal well in real space was obtained by the Stehfest numerical inversion method. The typical pressure response curve and dimensionless productivity curves were plotted. The effects of the water-body multiple, the distance between the horizontal well and oil-water contact, and the skin factor, were analyzed. Six main flowing stages were divided for horizontal wells in the bottom-water reservoir with finite water bodies. When the water body multiples are zero or tend to infinity, the results obtained from the model are consistent with the calculations by the conventional top-bottom closed reservoir model or infinite rigid bottom-water reservoir model, respectively, and the pressure dynamic for the finite water body falls in between both. With the increase in the water body multiples and the decrease in distance between the horizontal well and the oil-water contact, and the horizontal well productivity decreases slowly. With the increase in the skin factor, the initial productivity decreases; moreover, the skin factor has a great influence on the initial productivity of the horizontal well, while the later influence gradually decreases. Accurate horizontal well productivity prediction in the bottom-water reservoir with finite water bodies provides a strong basis for horizontal well deployment, design optimization, and formulation of development policy.
引用
收藏
页数:13
相关论文
共 50 条
  • [21] Research on the Water Production Tracking Method of Horizontal Well in Heavy Oil Reservoir with Bottom Water
    Pan Yue
    Wang Kai
    Tang Chenyang
    Li Ke
    Liu He
    [J]. LITHOSPHERE, 2021, 2021 (Special Issue 1)
  • [22] Gelatin Shape Calculation Method Research of Bottom-water Reservoir
    Wang, Fu-lin
    Liu, Yikun
    Yang, Tao
    Liu, Jian-lin
    [J]. PROCEEDINGS OF THE EIGHTH INTERNATIONAL CONFERENCE ON INFORMATION AND MANAGEMENT SCIENCES, 2009, 8 : 341 - 344
  • [23] A New Model for Evaluation of Horizontal Well in Bottom Water Reservoirs
    Yao, Yuedong
    Li, Yunting
    Wang, Yuangang
    Ji, Zemin
    [J]. INFORMATION TECHNOLOGY APPLICATIONS IN INDUSTRY II, PTS 1-4, 2013, 411-414 : 486 - 491
  • [24] Transient pressure behaviour of a heavy oil reservoir undergoing steam injection in the presence of a bottom-water zone
    Gomes, E
    Ambastha, AK
    [J]. JOURNAL OF CANADIAN PETROLEUM TECHNOLOGY, 1996, 35 (04): : 17 - 24
  • [25] The critical rate of horizontal wells in bottom-water reservoirs with an impermeable barrier
    Yue Ping
    Du Zhimin
    Chen Xiaofan
    Liang Baosheng
    [J]. PETROLEUM SCIENCE, 2012, 9 (02) : 223 - 229
  • [26] Performance of horizontal wells with longitudinal fractures in reservoirs with bottom-water drive
    Aggour, MA
    Kandil, AA
    [J]. PETROLEUM SCIENCE AND TECHNOLOGY, 2001, 19 (7-8) : 949 - 959
  • [27] The critical rate of horizontal wells in bottom-water reservoirs with an impermeable barrier
    Yue Ping Du Zhimin Chen Xiaofan and Liang Baosheng State Key Laboratory of Oil Gas Reservoir Geology and Exploitation Engineering Southwest Petroleum University Chengdu Sichuan China Chevron Energy Technology Company Louisiana Street Room Houston TX USA
    [J]. Petroleum Science, 2012, 9 (02) : 223 - 229
  • [29] A new semi-analytical model for predicting the performance of horizontal wells completed by inflow control devices in bottom-water reservoirs
    Luo, Wei
    Li, Hai-Tao
    Wang, Yong-Qing
    Wang, Jun-Chao
    [J]. JOURNAL OF NATURAL GAS SCIENCE AND ENGINEERING, 2015, 27 : 1328 - 1339
  • [30] Horizontal Well Completion with Multiple Artificial Bottom Holes Improves Production Performance in Bottom Water Reservoir
    Wang, Haidong
    Liu, Yikun
    [J]. MATHEMATICAL PROBLEMS IN ENGINEERING, 2020, 2020