Double-Track One-Direction Operation Mode for Overnight Trains on High-Speed Railway

被引:0
|
作者
Xu, Zhengfu [1 ,2 ]
Li, Kai [1 ,3 ]
Zhang, Qinyu [4 ]
Fu, Huiling [5 ]
机构
[1] Hebei Univ, Sch Cyber Secur & Comp, Baoding 071002, Peoples R China
[2] Beijing Huyii Innovat Technol Co Ltd, Beijing 100084, Peoples R China
[3] Hebei Machine Vis Engn Res Ctr, Baoding 071002, Peoples R China
[4] Southwest Jiaotong Univ, Sch Transportat & Logist, Chengdu 610031, Peoples R China
[5] Beijing Jiaotong Univ, Sch Traff & Transportat, Beijing 100044, Peoples R China
来源
APPLIED SCIENCES-BASEL | 2023年 / 13卷 / 06期
基金
中国国家自然科学基金;
关键词
high-speed railway; double-track one-direction; train organization modes; sunset-departure and sunrise-arrival train;
D O I
10.3390/app13063527
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
The mileage of China's high-speed railways is increasing, and trains running only during the day cannot satisfy the need. In the existing train organization and maintenance modes, overnight trains and maintenance constructions strongly interact with each other and are difficult to coordinate. Although some overnight trains run on a high-speed railway (HSR), currently, they are all sunset-departure and sunrise-arrival trains, and none of them depart in the night by passenger's habits. Only a one-way line is occupied by night, except rendezvous; the opposite direction line resources are idled. According to this feature, a double-track one-direction mode on the HSR was proposed based on the reverse running ability of the train control system to coordinate the train operation and maintenance. A mathematical model was established, and a heuristic algorithm based on simulated annealing was designed. The validity of the model was verified on the section from Xuzhoudong to Xi'anbei of Xuzhou-Lanzhou HSR, as an example. The results showed that 10 pairs of overnight sleeper trains and some freight trains can run, and the maintenance disruption is not less than 180 min. The proposed method can provide a new method to coordinate the overnight operation and maintenance of the HSR and increase the capacity of HSRs.
引用
收藏
页数:17
相关论文
共 50 条
  • [41] The new Guillemins station - a railway station for high-speed trains
    Cremer, Jean-Marie
    de Goyet, Vincent de Ville
    Counasse, Clement
    Duchene, Yves
    Fagnoul, Veronique
    [J]. STAHLBAU, 2011, 80 (01) : 46 - 60
  • [42] Effect of track defects on track deformations for high-speed railway bridge
    Gou, Hongye
    Xie, Rui
    Liu, Chang
    Guo, Wei
    Han, Bing
    Bao, Yi
    [J]. STEEL AND COMPOSITE STRUCTURES, 2021, 41 (03): : 447 - 459
  • [43] Simulating the Effects of Noncrossing Block Sections Setting Rules on Capacity Loss of Double-Track Railway Line due to the Operation of out-of-Gauge Trains
    Zhang, Yinggui
    Zeng, Qiong-fang
    Lei, Dingyou
    Wang, Xinyu
    [J]. DISCRETE DYNAMICS IN NATURE AND SOCIETY, 2016, 2016
  • [44] UAV Direction Estimation in High-Speed Railway Environment
    Zheng, Qi
    Xiao, Manlin
    Shi, Huajie
    [J]. RESILIENCE AND SUSTAINABLE TRANSPORTATION SYSTEMS: PROCEEDINGS OF THE 13TH ASIA PACIFIC TRANSPORTATION DEVELOPMENT CONFERENCE, 2020, : 485 - 490
  • [45] The influence of track irregularities on the running behavior of high-speed trains
    Choi, Ii-Yoon
    Um, Ju-Hwan
    Lee, Jun S.
    Choi, Hyun-Ho
    [J]. PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART F-JOURNAL OF RAIL AND RAPID TRANSIT, 2013, 227 (F1) : 94 - 102
  • [46] Optimization Method for Operation Scheme for High-speed Railway Freight Trains Based on Heterogeneous Fuzzy Demands
    Chen, Wanru
    Zhang, Dezhi
    Qin, Jin
    Cao, Jian
    Xu, Guangming
    Wang, Chao
    [J]. Tiedao Xuebao/Journal of the China Railway Society, 2023, 45 (11): : 20 - 28
  • [47] Influence Analysis and Checking Calculation of Track Operation in High-speed Railway on Train Arrival Interval
    Yang, Xiao
    Li, Bo
    Zheng, Pingbiao
    Bao, Jingjing
    Sun, Pengju
    An, Di
    Wang, Rui
    [J]. Journal of Railway Engineering Society, 2023, 40 (05) : 82 - 87
  • [48] Study of unsteady aerodynamic performance of a high-speed train entering a double-track tunnel under crosswind conditions
    Luo, Jianjun
    Wang, Lei
    Shang, Suying
    Li, Feilong
    Guo, Dilong
    Gao, Liping
    Wang, Dengke
    [J]. JOURNAL OF FLUIDS AND STRUCTURES, 2023, 118
  • [49] Three-dimensional numerical modelling of ballasted railway track foundations for high-speed trains with special reference to critical speed
    Abu Sayeed, Md.
    Shahin, Mohamed A.
    [J]. TRANSPORTATION GEOTECHNICS, 2016, 6 : 55 - 65
  • [50] A model considering the longitudinal track-bridge interaction in ballasted railway bridges subjected to high-speed trains
    Koenig, Paul
    Adam, Christoph
    [J]. ACTA MECHANICA, 2024, 235 (03) : 1395 - 1418