Assessment of most critical project delays on a multi-stage transmission expansion plan using particle swarm optimization

被引:0
|
作者
Moutinho, Eduardo L. [1 ]
Borges, Carmen L. T. [2 ]
Moulin, Luciano S. [1 ]
Berizzi, Alberto [3 ]
机构
[1] Elect Energy Res Ctr CEPEL, Rio De Janeiro, Brazil
[2] Fed Univ Rio de Janeiro UFRJ, Elect Engn Dept, Rio De Janeiro, Brazil
[3] Politecn Milano POLIMI, Energy Dept, Milan, Italy
关键词
Transmission planning; Delay assessment; Project ranking; Particle swarm optimization; Dynamic programming; Reliability;
D O I
10.1016/j.ijepes.2023.109159
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Transmission reinforcement projects of a Transmission Expansion Plan can suffer implementation delays that can impact the short-term power system operation in unpredicted ways. These delays may lead project managers to paying particular care to the development of those plans proved to be most critical from this point of view. This paper proposes a multi-objective dynamic-programming based method to evaluate the impacts of such delays in a short-term transmission plan with respect to load shedding, reliability and losses. It uses the Binary Pareto-Optimal Particle Swarm Optimization as optimization tool. For the trade-off analysis and the final decision to be made, the paper proposes indices to rank the projects in the plan from most to least critical, should they be delayed, based on the severity of the impacts and the probability of occurrence, both on an annual basis and for the whole planning horizon. The proposed method has been tested on an actual Brazilian 40-bus subtransmission system for a 3-year and a 6-year planning horizon, and with the 24-bus IEEE RTS reliability test system for a 3-year planning horizon. To assess its accuracy and efficiency, the results are compared to those using the Non-dominated Sorting Genetic Algorithm II method (NSGA-II) and to the exhaustive search that considers every delay configuration, showing the same accuracy as the exhaustive search and better convergence properties than NSGA-II. The most critical projects are accurately ranked helping the project manager to decide which projects should receive higher attention to guarantee its construction on the planned date. The method obtained a reduction in computational time of 35% for the Brazilian system and of 42% for the IEEE RTS in relation to the exhaustive approach, demonstrating its efficiency.
引用
收藏
页数:12
相关论文
共 49 条
  • [41] Feature selection using importance-based two-stage multi-modal multiobjective particle swarm optimization
    Ling, Qinghua
    Liu, Wenkai
    Han, Fei
    Shi, Jinlong
    Hussein, Ali Aweis
    Sayway, Ben Sanvee
    [J]. Cluster Computing, 2025, 28 (02)
  • [42] Enhancing the performance of a parallel nitrogen expansion liquefaction process (NELP) using the multi-objective particle swarm optimization (MOPSO) algorithm
    Mofid, Hossein
    Jazayeri-Rad, Hooshang
    Shahbazian, Mehdi
    Fetanat, Abdolvahhab
    [J]. ENERGY, 2019, 172 : 286 - 303
  • [43] Performance analysis and geometry optimization of metal belt-based continuously variable transmission systems using multi-objective particle swarm optimization
    Khaniki, H. Bakhshi
    Zohoor, H.
    Sohrabpour, S.
    [J]. JOURNAL OF THE BRAZILIAN SOCIETY OF MECHANICAL SCIENCES AND ENGINEERING, 2017, 39 (11) : 4289 - 4303
  • [44] Performance analysis and geometry optimization of metal belt-based continuously variable transmission systems using multi-objective particle swarm optimization
    H. Bakhshi Khaniki
    H. Zohoor
    S. Sohrabpour
    [J]. Journal of the Brazilian Society of Mechanical Sciences and Engineering, 2017, 39 : 4289 - 4303
  • [45] Refaat et al. Multi-Stage Dynamic Transmission Network Expansion Planning Using LSHADE-SPACMA (vol 11, 2155, 2021)
    Refaat, Mohamed M.
    Aleem, Shady H. E. Abdel
    Atia, Yousry
    Ali, Ziad M.
    Sayed, Mahmoud M.
    [J]. APPLIED SCIENCES-BASEL, 2021, 11 (13):
  • [46] Heat transfer and fluid flow for tube included a porous media: Assessment and Multi-Objective Optimization Using Particle Swarm Optimization (PSO) Algorithm
    Keykhah, Sajjad
    Assareh, Ehsanolah
    Moltames, Rahim
    Izadi, Mohsen
    Ali, Hafiz Muhammad
    [J]. PHYSICA A-STATISTICAL MECHANICS AND ITS APPLICATIONS, 2020, 545
  • [47] Multi-stage global trajectory optimization for the overlapping shift of a seamless two-speed transmission using Legendre pseudo-spectral method
    Ye, Jie
    Zhao, Kegang
    Liu, Yanwei
    Huang, Xiangdong
    Lin, Huibin
    [J]. ADVANCES IN MECHANICAL ENGINEERING, 2017, 9 (12):
  • [48] Broadband sound transmission loss enhancement of an arbitrary-thick hybrid smart composite plate using multi-objective particle swarm optimization-based active control
    Hasheminejad, Seyyed M.
    Hakimi, Arash
    Keshavarzpour, Hemad
    [J]. JOURNAL OF INTELLIGENT MATERIAL SYSTEMS AND STRUCTURES, 2018, 29 (08) : 1724 - 1747
  • [49] A new boredom-aware dual-resource constrained flexible job shop scheduling problem using a two-stage multi-objective particle swarm optimization algorithm
    Shi, Jiaxuan
    Chen, Mingzhou
    Ma, Yumin
    Qiao, Fei
    [J]. INFORMATION SCIENCES, 2023, 643