Assessment of most critical project delays on a multi-stage transmission expansion plan using particle swarm optimization

被引:0
|
作者
Moutinho, Eduardo L. [1 ]
Borges, Carmen L. T. [2 ]
Moulin, Luciano S. [1 ]
Berizzi, Alberto [3 ]
机构
[1] Elect Energy Res Ctr CEPEL, Rio De Janeiro, Brazil
[2] Fed Univ Rio de Janeiro UFRJ, Elect Engn Dept, Rio De Janeiro, Brazil
[3] Politecn Milano POLIMI, Energy Dept, Milan, Italy
关键词
Transmission planning; Delay assessment; Project ranking; Particle swarm optimization; Dynamic programming; Reliability;
D O I
10.1016/j.ijepes.2023.109159
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Transmission reinforcement projects of a Transmission Expansion Plan can suffer implementation delays that can impact the short-term power system operation in unpredicted ways. These delays may lead project managers to paying particular care to the development of those plans proved to be most critical from this point of view. This paper proposes a multi-objective dynamic-programming based method to evaluate the impacts of such delays in a short-term transmission plan with respect to load shedding, reliability and losses. It uses the Binary Pareto-Optimal Particle Swarm Optimization as optimization tool. For the trade-off analysis and the final decision to be made, the paper proposes indices to rank the projects in the plan from most to least critical, should they be delayed, based on the severity of the impacts and the probability of occurrence, both on an annual basis and for the whole planning horizon. The proposed method has been tested on an actual Brazilian 40-bus subtransmission system for a 3-year and a 6-year planning horizon, and with the 24-bus IEEE RTS reliability test system for a 3-year planning horizon. To assess its accuracy and efficiency, the results are compared to those using the Non-dominated Sorting Genetic Algorithm II method (NSGA-II) and to the exhaustive search that considers every delay configuration, showing the same accuracy as the exhaustive search and better convergence properties than NSGA-II. The most critical projects are accurately ranked helping the project manager to decide which projects should receive higher attention to guarantee its construction on the planned date. The method obtained a reduction in computational time of 35% for the Brazilian system and of 42% for the IEEE RTS in relation to the exhaustive approach, demonstrating its efficiency.
引用
收藏
页数:12
相关论文
共 46 条
  • [1] Structural Damage Detection Using a Multi-Stage Particle Swarm Optimization
    Seyedpoor, S. M.
    [J]. ADVANCES IN STRUCTURAL ENGINEERING, 2011, 14 (03) : 533 - 549
  • [2] Multi-stage approach for structural damage identification using particle swarm optimization
    Tang, H.
    Zhang, W.
    Xie, L.
    Xue, S.
    [J]. SMART STRUCTURES AND SYSTEMS, 2013, 11 (01) : 69 - 86
  • [3] Solving the multi-stage portfolio optimization problem with a novel particle swarm optimization
    Sun, Jun
    Fang, Wei
    Wu, Xiaojun
    Lai, Choi-Hong
    Xu, Wenbo
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2011, 38 (06) : 6727 - 6735
  • [4] Parallel particle swarm optimization algorithm in multi-stage portfolio optimization problem
    You, ZY
    Sun, J
    Xu, WB
    [J]. DCABES AND ICPACE JOINT CONFERENCE ON DISTRIBUTED ALGORITHMS FOR SCIENCE AND ENGINEERING, 2005, : 115 - 120
  • [5] A particle swarm algorithm for inspection optimization in serial multi-stage processes
    Azadeh, Ali
    Sangari, Mohamad Sadegh
    Amiri, Alireza Shamekhi
    [J]. APPLIED MATHEMATICAL MODELLING, 2012, 36 (04) : 1455 - 1464
  • [6] Harmonic Optimization for the Multi-stage Saturable Magnetically Controlled Reactor Using Particle Swarm Optimization Algorithm
    Chen, Xuxuan
    Chen, Jianxun
    Chen, Baichao
    [J]. PROCEEDINGS OF THE 2014 9TH IEEE CONFERENCE ON INDUSTRIAL ELECTRONICS AND APPLICATIONS (ICIEA), 2014, : 1804 - +
  • [7] Particle swarm optimization in multi-stage operations for operation sequence and DT allocation
    Jeung, Heun-Sik
    Choi, Hoo-Gon
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2012, 62 (02) : 442 - 450
  • [8] Multi-stage approach for structural damage detection problem using basis pursuit and particle swarm optimization
    Gerist, Saleheh
    Maheri, Mahmoud R.
    [J]. JOURNAL OF SOUND AND VIBRATION, 2016, 384 : 210 - 226
  • [9] Co-optimization of multi-stage transmission expansion planning and grid operation
    Franken, Marco
    Schrief, Alexander B.
    Barrios, Hans
    Puffer, Ralf
    Moser, Albert
    [J]. ELECTRIC POWER SYSTEMS RESEARCH, 2020, 189
  • [10] Gini Coefficient for Voltage Security Assessment of Multi-stage Transmission Expansion Planning
    Luo, Yi
    Shi, Nian
    Su, Dan
    [J]. ELECTRIC POWER COMPONENTS AND SYSTEMS, 2017, 45 (11) : 1182 - 1190