共 50 条
- [31] Safety monitoring system of dam based on bionics [J]. PROCEEDINGS OF THE 2004 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-7, 2004, : 1099 - 1104
- [32] A PROBABILISTIC RISK ASSESSMENT FRAMEWORK FOR DAM SAFETY EVALUATION [J]. PROCEEDINGS OF EIGHTH ANNUAL AGU FRONT RANGE BRANCH: HYDROLOGY DAYS, 1988, : 69 - 80
- [33] Assessment of hydrological safety of Mae Sruai Dam, Thailand [J]. ISEEC, 2012, 32 : 1198 - 1204
- [34] Safety assessment of the existing dam - HPP Mariborski otok [J]. SYMPOSIUM - REHABILITATION OF DAMS: ICOLD 66TH ANNUAL MEETING, PROCEEDINGS (PT A), 1999, : 444 - 453
- [35] Dam safety program performance measures - Version 2 [J]. DEALING WITH AGING DAMS, 1999, : 547 - 558
- [36] Performance review and safety evaluation of the Botonega Reservoire and Dam [J]. Proceedings of the 16th International Conference on Soil Mechanics and Geotechnical Engineering, Vols 1-5: GEOTECHNOLOGY IN HARMONY WITH THE GLOBAL ENVIRONMENT, 2005, : 1083 - 1086
- [37] Dam safety program performance measures version 4 [J]. DAM O&M ISSUES - THE CHALLENGE OF THE 21ST CENTURY, 2000, : 759 - 774
- [38] Dam Safety Program Performance Measures Version 1.0 [J]. MANAGING THE RISKS OF DAM PROJECT DEVELOPMENT, SAFETY AND OPERATION, 1998, : 543 - 558
- [39] Dam safety assessment using long-term hydrological modelling techniques [J]. GEOECOLOGY AND COMPUTERS, 2000, : 513 - 517
- [40] Using resistivity measurements for dam safety evaluation at Enemossen tailings dam in southern Sweden [J]. ENVIRONMENTAL GEOLOGY, 2005, 49 (02): : 267 - 273