共 50 条
- [31] OPTIMIZATION OF SUBGRADE DIFFERENTIAL SETTLEMENT DETECTION METHOD OF HIGH-SPEED RAILWAY NEW TECHNOLOGIES OF RAILWAY ENGINEERING, 2012, : 449 - 453
- [32] Research on Method of Layout Optimization for High-speed Railway Infrastructure Depot Tiedao Xuebao/Journal of the China Railway Society, 2021, 43 (01): : 10 - 18
- [33] A transferable deep reinforcement learning high-speed railway rescheduling method based on prioritized experience replay Kongzhi yu Juece/Control and Decision, 2023, 38 (08): : 2375 - 2388
- [34] Integrated optimization of line planning and timetabling on high-speed railway network considering cross-line operation ADVANCES IN PRODUCTION ENGINEERING & MANAGEMENT, 2024, 19 (01): : 117 - 132
- [35] Timetable Mapping Model and Dynamic Programming Approach for High-speed Railway Rescheduling PROCEEDINGS OF THE 39TH CHINESE CONTROL CONFERENCE, 2020, : 1739 - 1744
- [39] A Real-time Train Timetable Rescheduling Approach to High-speed Railway 2019 CHINESE AUTOMATION CONGRESS (CAC2019), 2019, : 2024 - 2029
- [40] Timetable Rescheduling Model of High-speed Railway Based on Global Conflict Resolution Tiedao Xuebao/Journal of the China Railway Society, 2023, 45 (02): : 1 - 12