The management of construction projects in Iraq and the most important reasons for the delay

被引:0
|
作者
AL Musawi, Layth [1 ]
Naimi, Sepanta [1 ]
机构
[1] Altinbas Univ, Civil Engn Dept, Dilmenler Caddesi Mahmutbey Yerleskesi 26, TR-34218 Istanbul, Turkiye
来源
ACTA LOGISTICA | 2023年 / 10卷 / 01期
关键词
delaying construction; delaying project time; management; logistics; projects; LOGISTICS; IMPACT;
D O I
10.22306/al.v10i1.351
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In Iraq, there is a vast construction movement. Still, it is accompanied by many problems, the most important of which is the delay in completing projects during the specified time. The time must be optimized by adopting the leadership practice and dedicating it to the benefit of performing the process and functions of the project. The research aims to identify the most important reasons and factors that affect the project delivery process within the specified period. The investigation initially dealt with the most important previous studies, on this subject, by researchers, then touched on the concept of construction projects, their types and details. A questionnaire containing reasons for the delay was identified and divided into several items. It concluded that the most common reasons for delays are delays in laboratory testing of materials, assignment of works to the lowest bidder, contractors' financial incompetence, and high building materials prices. The most crucial factor is to streamline building material inspection procedures, set up inspection laboratories on several occasions and assess the contractor's effectiveness and ability to implement before the project is referred financially. Organizations and individuals should coordinate their work between the construction departments to prevent any issues that may arise during completing tasks.
引用
收藏
页码:61 / 70
页数:10
相关论文
共 50 条
  • [21] Why join in the Rheumatism League? The five most important Reasons
    Schmale-Grede, Rotraut
    [J]. ZEITSCHRIFT FUR RHEUMATOLOGIE, 2021, 80 (07): : 695 - 695
  • [22] Mile Markers: The 26.2 Most Important Reasons Women Run
    不详
    [J]. LIBRARY JOURNAL, 2011, 136 (08) : 85 - 85
  • [23] Reasons for delay in civil engineering projects - the case of Hong Kong
    Chan, Daniel W.M.
    Kumaraswamy, Mohan M.
    [J]. Transactions Hong Kong Institution of Engineers, 1996, 2 (03): : 1 - 8
  • [24] Important Factors for Success of Public Construction Projects
    Tabishl, S. Z. S.
    Jha, K. N.
    [J]. CONSTRUCTION AND PROJECT MANAGEMENT, ICCPM 2011, 2011, 15 : 64 - 68
  • [25] An investigation into factors causing delays in highway construction projects in iraq
    Al Hadithi, Bevian I.
    [J]. 3RD INTERNATIONAL CONFERENCE ON BUILDINGS, CONSTRUCTION AND ENVIRONMENTAL ENGINEERING, BCEE3-2017, 2018, 162
  • [26] Causes of Delay in Road Construction Projects in Afghanistan
    Kivrak, Serkan
    Baha, Mohammad Yonis
    [J]. JOURNAL OF SCIENTIFIC & INDUSTRIAL RESEARCH, 2024, 83 (01): : 46 - 57
  • [27] Causes of Delay in Smart and Complex Construction Projects
    Radman, Kambiz
    Babaeian Jelodar, Mostafa
    Ghazizadeh, Eghbal
    Wilkinson, Suzanne
    [J]. JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2021, 13 (04)
  • [28] CAUSES OF DELAY IN LARGE BUILDING CONSTRUCTION PROJECTS
    ASSAF, SA
    ALKHALIL, M
    ALHAZMI, M
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 1995, 11 (02) : 45 - 50
  • [29] Causes of Delay in the Construction Projects of Subway Tunnel
    Zhang, Dingbang
    Zhang, Hang
    Cheng, Tao
    [J]. ADVANCES IN CIVIL ENGINEERING, 2020, 2020
  • [30] Analyzing delay causes in Egyptian construction projects
    Marzouk, Mohamed M.
    El-Rasas, Tarek I.
    [J]. JOURNAL OF ADVANCED RESEARCH, 2014, 5 (01) : 49 - 55