Project Portfolio Reliability: A Bayesian Approach for LeAgile Projects

被引:1
|
作者
Chhetri, Sagar [1 ]
Du, Dongping [2 ]
Mengel, Susan [3 ]
机构
[1] Texas Tech Univ, Lubbock, TX 79409 USA
[2] Texas Tech Univ, Dept Ind Mfg & Syst Engn, Box 43061, Lubbock, TX 79409 USA
[3] Texas Tech Univ, Comp Sci Dept, Lubbock, TX 79409 USA
关键词
Continuous Planning; Continuous Learning; Project Portfolio Management; Reliability; Bayesian Inference; LeAgile; Continuous Improvement; New Product Development; Program & Project Management; Systems Engineering; INFORMATION-SYSTEMS; AGILE; COMPLEXITY; CAPABILITIES; MANAGEMENT;
D O I
10.1080/10429247.2022.2069980
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We propo se an applied Bayesian learning approach for continuous planning and evolution of information system projects and portfolios. Unlike traditional project management approaches for information system, the proposed approach considers the cumulative effect of all past experiences to achieve continuous performance and reliability prediction. The results of quantitative comparisons with other common estimation approaches, such as non-learning point estimates and traditional Bayesian approach, using real case data indicate that the proposed approach can generate a more realistic metric to continuously plan and measure the performance of evolving LeAgile projects or portfolios. This study can support decision makers, engineering teams, and management by supplying a practical and scalable project performance prediction tool for continuous planning and system evolution.
引用
收藏
页码:223 / 236
页数:14
相关论文
共 50 条
  • [31] DEVELOPING A TOOL FOR PROJECT CONTINGENCY ESTIMATION IN A LARGE PORTFOLIO OF CONSTRUCTION PROJECTS
    van Niekerk, M.
    Bekker, J.
    SOUTH AFRICAN JOURNAL OF INDUSTRIAL ENGINEERING, 2014, 25 (03) : 96 - 111
  • [32] Correlation of Construction Performance Indicators and Project Success in a Portfolio of Building Projects
    Cleary, Joseph P.
    Lamanna, Anthony J.
    BUILDINGS, 2022, 12 (07)
  • [33] Optimal Project Portfolio Selection Considering Cascading Failure Among Projects
    Bai, Libiao
    Han, Xiao
    Zhang, Yipei
    Xie, Xiaoyan
    IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2023, 71 : 4750 - 4760
  • [34] Project portfolio management applied to building energy projects management system
    Wu, Yunna
    Li, Jiangshuai
    Wang, Jiali
    Huang, Yong
    RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2012, 16 (01): : 718 - 724
  • [35] Project portfolio selection model, a realistic approach
    Urli, Bruno
    Terrien, Francois
    INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2010, 17 (06) : 809 - 826
  • [36] Project portfolio selection with scheduling: an evolutionary approach
    Martinez-Vega, Daniel A.
    Cruz-Reyes, Laura
    Rangel, Nelson, V
    Gomez S, Claudia G.
    Sanchez S, Patricia
    Perez, Mercedes, V
    INTERNATIONAL JOURNAL OF COMBINATORIAL OPTIMIZATION PROBLEMS AND INFORMATICS, 2019, 10 (01): : 25 - 31
  • [37] Portfolio based approach to project risk management
    Nubbaurner, Manfred
    Nuebel, Konrad
    Proceedings of the 16th International Conference on Soil Mechanics and Geotechnical Engineering, Vols 1-5: GEOTECHNOLOGY IN HARMONY WITH THE GLOBAL ENVIRONMENT, 2005, : 2833 - 2836
  • [38] Project Portfolio Selection Using Interactive Approach
    Nowak, Maciej
    MODERN BUILDING MATERIALS, STRUCTURES AND TECHNIQUES, 2013, 57 : 814 - 822
  • [39] A BAYESIAN-BASED MODEL FOR ALLOCATING CONTINGENCY TO A PORTFOLIO OF CORRELATED CONSTRUCTION PROJECTS
    Bakhshi, Payam
    Touran, Ali
    PROCEEDINGS OF INTERNATIONAL STRUCTURAL ENGINEERING AND CONSTRUCTION: INTERACTION BETWEEN THEORY AND PRACTICE IN CIVIL ENGINEERING AND CONSTRUCTION, 2016, : 425 - 430
  • [40] Leagile Strategies for Optimizing the Delivery of Prefabricated House Building Projects
    Mostafa, Sherif
    Tam, Vivian W.
    Dumrak, Jantanee
    Mohamed, Sherif
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2020, 20 (08) : 867 - 881