The Construction Methods and Control Mechanisms for Subway Station Undercrossing an Existing Tunnel at Zero Distance

被引:4
|
作者
Zhou, Zihan [1 ,2 ,3 ]
Zhou, Xiaohan [1 ,2 ,3 ]
Li, Longping [4 ]
Liu, Xinrong [1 ,2 ,3 ]
Wang, Linfeng [1 ,2 ,3 ]
Wang, Ziqiang [1 ,2 ,3 ]
机构
[1] Chongqing Univ, Sch Civil Engn, Chongqing 400045, Peoples R China
[2] Chongqing Univ, Natl Joint Engn Res Ctr Geohazards Prevent Reservo, Chongqing 400045, Peoples R China
[3] Chongqing Univ, Key Lab New Technol Construct Cities Mt Area, Minist Educ, Chongqing 400045, Peoples R China
[4] China Railway Major Bridge Reconnaissance & Design, Wuhan 430056, Peoples R China
来源
APPLIED SCIENCES-BASEL | 2023年 / 13卷 / 15期
基金
中国国家自然科学基金;
关键词
subway station excavation; zero-distance undercrossing; existing metro tunnel; deformation control; numerical simulation; TWIN TUNNELS; EXCAVATION; DEFORMATION; MODEL;
D O I
10.3390/app13158826
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
The existing tunnel will inevitably be disturbed when the new subway station is constructed cross under it at zero distance. Three innovative construction schemes were proposed, their effects on deformation control were compared by numerical simulations, and the mechanism of the influence of different tunnel support and excavation methods on the deformation control in them was further explored in order to seek a better scheme in this paper. The results show that the settlement of the existing tunnel in Scheme I (L-type beam + full-face excavation) is the greatest, and that the one in Scheme III (temporary steel column + double-pilot tunnel) is the smallest, but the settlement during excavation changes significantly, along with the large deformation on the side walls of the undercrossing area. Scheme III is not recommended because it is difficult to control and the construction effect is mediocre. Due to the existence of a large free face, the settlement of both sides of the existing tunnel is larger when the L-type beam supports the tunnel, and the bottom of the middle wall bears large compressive stress. The settlement of the existing tunnel excavated by the double-pilot tunneling method is less than that of the full-face tunneling method under the same tunneling support method, and the increase in settlement during the tunneling with the L-type beams is greater than that with the pier columns. In comprehensive consideration, Scheme II (pier column + double-pilot tunnel method) or combined pier column + double-pilot tunnel can control the deformation better.
引用
收藏
页数:26
相关论文
共 50 条
  • [21] Study on the Stability of Existing Tunnel Influenced By Adjacent Undercrossing Construction
    Song, Zhifei
    Yi, Fu
    Sung, Di
    PROCEEDINGS OF THE ADVANCES IN MATERIALS, MACHINERY, ELECTRICAL ENGINEERING (AMMEE 2017), 2017, 114 : 763 - 770
  • [22] Study on the Influence of Close Distance Construction of Urban Tunnel on the Existing Station
    Yang Zheng
    Ke Wu
    Jie Sun
    Rong Chen
    Yameng Li
    Shifeng Yang
    Geotechnical and Geological Engineering, 2021, 39 : 4765 - 4780
  • [23] Study on the Influence of Close Distance Construction of Urban Tunnel on the Existing Station
    Zheng, Yang
    Wu, Ke
    Sun, Jie
    Chen, Rong
    Li, Yameng
    Yang, Shifeng
    GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2021, 39 (07) : 4765 - 4780
  • [24] Cause analysis of underground confined water channel caused by subway undercrossing the existing station
    Liang, Xiao
    Qi, Taiyue
    Jin, Zhiyi
    Chen, Pengtao
    Lei, Bo
    Journal of Railway Science and Engineering, 2022, 19 (01) : 219 - 229
  • [25] Construction Plan and Risk Analysis of New Subway Tunnel Passing Beneath Existing Subway Station and Slurry Walls
    Yu, Caicheng
    Shi, Peixin
    Feng, Yuehua
    2015 INTERNATIONAL CONFERENCE ON CIVIL ENGINEERING AND ROCK ENGINEERING, ICCERE 2015, 2015, : 451 - 457
  • [26] Analysis of construction mechanics of expansive soil tunnel passing through existing subway station in short distance under humidification condition
    Shi, Youzhi
    Lin, Lianquan
    Xu, Jianning
    Qing, Jiajia
    Journal of Railway Science and Engineering, 2021, 18 (01) : 200 - 210
  • [27] Vibration analysis of the impact of the blasting construction of a power tunnel crossing underneath an existing subway station
    Gu, Zhimin
    Sun, Bingfeng
    Cui, Xiaoqing
    Guo, Hong
    World of Mining - Surface and Underground, 2020, 72 (02): : 86 - 92
  • [28] Analysis of Existing Tunnel Settlement Caused by Undercrossing Construction of Curved Metro Shield Tunnel
    Jiang J.
    Long Y.
    Ou X.
    Xing X.
    Zhang T.
    Gongcheng Kexue Yu Jishu/Advanced Engineering Sciences, 2023, 55 (01): : 313 - 323
  • [29] Effect of Closely Spaced Twin Tunnel Construction beneath an Existing Subway Station: A Case Study
    Zhang, Xu
    Zhang, Chengping
    Wang, Jianchen
    JOURNAL OF TESTING AND EVALUATION, 2018, 46 (04) : 1559 - 1573
  • [30] Subway station construction parallelly below existing double-cell tunnel without clearance
    Su, Jie
    Yu, Lin
    Fang, Qian
    Niu, Xiaokai
    Yu, Junyu
    Zhang, Xu
    JOURNAL OF THE CHINESE INSTITUTE OF ENGINEERS, 2024, 47 (02) : 192 - 203