The Construction Methods and Control Mechanisms for Subway Station Undercrossing an Existing Tunnel at Zero Distance

被引:4
|
作者
Zhou, Zihan [1 ,2 ,3 ]
Zhou, Xiaohan [1 ,2 ,3 ]
Li, Longping [4 ]
Liu, Xinrong [1 ,2 ,3 ]
Wang, Linfeng [1 ,2 ,3 ]
Wang, Ziqiang [1 ,2 ,3 ]
机构
[1] Chongqing Univ, Sch Civil Engn, Chongqing 400045, Peoples R China
[2] Chongqing Univ, Natl Joint Engn Res Ctr Geohazards Prevent Reservo, Chongqing 400045, Peoples R China
[3] Chongqing Univ, Key Lab New Technol Construct Cities Mt Area, Minist Educ, Chongqing 400045, Peoples R China
[4] China Railway Major Bridge Reconnaissance & Design, Wuhan 430056, Peoples R China
来源
APPLIED SCIENCES-BASEL | 2023年 / 13卷 / 15期
基金
中国国家自然科学基金;
关键词
subway station excavation; zero-distance undercrossing; existing metro tunnel; deformation control; numerical simulation; TWIN TUNNELS; EXCAVATION; DEFORMATION; MODEL;
D O I
10.3390/app13158826
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
The existing tunnel will inevitably be disturbed when the new subway station is constructed cross under it at zero distance. Three innovative construction schemes were proposed, their effects on deformation control were compared by numerical simulations, and the mechanism of the influence of different tunnel support and excavation methods on the deformation control in them was further explored in order to seek a better scheme in this paper. The results show that the settlement of the existing tunnel in Scheme I (L-type beam + full-face excavation) is the greatest, and that the one in Scheme III (temporary steel column + double-pilot tunnel) is the smallest, but the settlement during excavation changes significantly, along with the large deformation on the side walls of the undercrossing area. Scheme III is not recommended because it is difficult to control and the construction effect is mediocre. Due to the existence of a large free face, the settlement of both sides of the existing tunnel is larger when the L-type beam supports the tunnel, and the bottom of the middle wall bears large compressive stress. The settlement of the existing tunnel excavated by the double-pilot tunneling method is less than that of the full-face tunneling method under the same tunneling support method, and the increase in settlement during the tunneling with the L-type beams is greater than that with the pier columns. In comprehensive consideration, Scheme II (pier column + double-pilot tunnel method) or combined pier column + double-pilot tunnel can control the deformation better.
引用
收藏
页数:26
相关论文
共 50 条
  • [1] Construction control of a newly-built subway station undercrossing the existing subway tunnel
    Zhang, Chengping
    Zhang, Dingli
    Wu, Jiepu
    Luo, Jianjun
    Zhongguo Tiedao Kexue/China Railway Science, 2009, 30 (01): : 69 - 73
  • [2] Study on the Influence of Construction Undercrossing Existing Station at Zero Distance in Confined Water
    Huang, Mingli
    Shen, Qiaofeng
    Zhang, Chuanyun
    Meng, Zhaohui
    APPLIED SCIENCES-BASEL, 2022, 12 (12):
  • [3] Investigating the influence of excavating a tunnel undercrossing an existing tunnel at zero distance
    Xu, Qiang
    Lei, Shengxiang
    Zhu, Yongquan
    Liu, Zhichun
    Zhang, Zhenbo
    Wang, Dapeng
    Ma, Kaimeng
    Liu, Xiaodong
    PLOS ONE, 2024, 19 (04):
  • [4] The influence of existing piles on station settlement during the construction of a tunnel undercrossing under existing stations
    Ma, Baolin
    Wu, Shengzhi
    Chen, Qihui
    Liang, Erbin
    Li, Xiudong
    SCIENTIFIC REPORTS, 2024, 14 (01):
  • [5] Analysis of Vibration Characteristics of New Subway Tunnel Undercrossing the Existing Highway under Blasting Construction
    Hu, Dehua
    Duan, Jingchuan
    ELECTRONIC JOURNAL OF GEOTECHNICAL ENGINEERING, 2016, 21 (13): : 4781 - 4786
  • [6] Analysis of Vibration Characteristics of New Subway Tunnel Undercrossing the Existing Highway Under Blasting Construction
    Hu, De-hua
    Duan, Jing-chuan
    INTERNATIONAL CONFERENCE ON MATERIAL SCIENCE AND CIVIL ENGINEERING, MSCE 2016, 2016, : 475 - 480
  • [7] Mechanical response of horseshoe-shaped tunnel lining to undercrossing construction of a new subway station
    Liu, Bo
    Li, Ting
    Chang, Wei
    Han, Yanhui
    Fu, Chunqing
    Yu, Zhiwei
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2022, 128
  • [8] Remote monitoring system applied to the construction of metro station undercrossing existing metro tunnel
    Zhang Cheng-ping
    Zhang Ding-li
    Luo Jian-jun
    Wang Meng-shu
    Wu Jie-pu
    ROCK AND SOIL MECHANICS, 2009, 30 (06) : 1861 - 1866
  • [9] Relationship between the Intermediate Soil State and Settlement Control Measures during Tunnel Construction Undercrossing the Existing Station
    Wu, Shengzhi
    Zhang, Xueyu
    Li, Xiudong
    Chen, Jian
    Liang, Erbin
    Wu, Dun
    BUILDINGS, 2023, 13 (08)
  • [10] Study on the shallow tunnel construction methods for a new-built subway station passing through the bottom of the existing subway
    Research Center of Tunneling and Underground Engineering, Beijing Jiaotong University, Beijing 100044, China
    Zhongguo Tiedao Kexue, 2007, 5 (71-77):