Experimental and theoretical investigations of post-tensioned precast reinforced concrete bridge pier with external replaceable energy dissipaters

被引:3
|
作者
Zhu, Yunqing [1 ]
Wu, Jing [1 ,2 ]
Zhang, Jinyang [3 ]
Xie, Luqi [1 ,2 ]
Wei, Yinghao [1 ]
Tong, Chao [4 ]
机构
[1] Southeast Univ, Key Lab Concrete & Prestressed Concrete Struct, Minist Educ, Nanjing 211189, Peoples R China
[2] Southeast Univ, Natl Engn Res Ctr Prestressing Technol, Nanjing 211189, Peoples R China
[3] Changzhou Municipal Housing & Urban Rural Dev Bur, Changzhou 213022, Peoples R China
[4] Jinling Inst Technol, Nanjing 211169, Peoples R China
基金
中国国家自然科学基金;
关键词
Precast reinforced concrete bridge pier; Post-tensioned; Self-centering; Replaceable energy dissipaters; Seismic performance; Quasi-static tests; SEISMIC BEHAVIOR; RAPID REPAIR; STEEL; COLUMN; PERFORMANCE; DESIGN; CONNECTION; BARS;
D O I
10.1016/j.engstruct.2023.116719
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This study presents a post-tensioned (PT) precast reinforced-concrete bridge pier with external replaceable energy dissipaters (PRCB-EREDs). The EREDs provide both bending resistance and energy dissipation (ED) capacity, and the unbonded PT strands enable prefabricated construction and self-centering capabilities. This study introduces the construction, assembly process, and post-earthquake repair technology of the PRCB-EREDs. Subsequently, parametric quasi-static tests were performed by altering parameters, such as the initial PT force and the size of core energy dissipation steel plate in the ERED (ERED-CEDP). The test results indicated that the precast pier column remained essentially elastic, with damage localized within the ERED-CEDP, exhibiting good deformation and ED capabilities. The hysteresis curve of the specimen was full and stable, and the curves before and after repair were essentially identical, confirming the feasibility of the repair. With an increase in the initial PT force, both the stiffness and bearing capacity were improved, and better self-restoration effects were achieved. For test conditions with the same ERED-CEDP thicknesses but different initial PT forces, the ED capacities were almost the same. Finally, the load-resisting mechanism of the PRCB-ERED piers was analyzed and theoretical model of hysteretic behavior was proposed and verified.
引用
收藏
页数:20
相关论文
共 50 条
  • [1] Experimental study of a post-tensioned precast concrete beam-column joint with energy dissipaters and partially-precast slabs
    Qing, Yuan
    Liu, Ye
    Wang, Chun-Lin
    Du, Dongsheng
    Meng, Shaoping
    [J]. ENGINEERING STRUCTURES, 2023, 285
  • [2] Quasi-static and pseudo-dynamic testing of unbonded post-tensioned rocking bridge piers with external replaceable dissipaters
    Marriott, Dion
    Pampanin, Stefano
    Palermo, Alessandro
    [J]. EARTHQUAKE ENGINEERING & STRUCTURAL DYNAMICS, 2009, 38 (03): : 331 - 354
  • [3] Deformation and cyclic buckling capacity of external replaceable hysteretic dampers for unbonded post-tensioned precast concrete walls
    Alberto Bedrinana, Luis
    Tani, Masanori
    Nishiyama, Minehiro
    [J]. ENGINEERING STRUCTURES, 2021, 235
  • [4] Biaxial testing of unbonded post-tensioned rocking bridge piers with external replacable dissipaters
    Marriott, Dion
    Pampanin, Stefano
    Palermo, Alessandro
    [J]. EARTHQUAKE ENGINEERING & STRUCTURAL DYNAMICS, 2011, 40 (15): : 1723 - 1741
  • [5] Nonlinear seismic fragility analysis of a resilient precast post-tensioned segmental bridge pier
    Ahmadi, Ehsan
    Kocakaplan, Sedef
    Kashani, Mohammad M.
    [J]. SUSTAINABLE AND RESILIENT INFRASTRUCTURE, 2022, 7 (06) : 823 - 841
  • [6] DFEM of a post-tensioned precast concrete segmental bridge with unbonded external tendons subjected to prestress changes
    Yuen, Terry Y. P.
    Halder, Rudhra
    Chen, Wang-Wen
    Zhou, Xiangming
    Deb, Trissa
    Liu, Yang
    Tseng, Yang
    Wen, Tzu-Han
    [J]. STRUCTURES, 2020, 28 : 1322 - 1337
  • [7] Cyclic tests of precast segmental unbonded post-tensioned concrete bridge piers
    Ou, Y. -C.
    Lee, G. C.
    Wang, P. -H.
    Tsai, M. -S.
    Chang, K. -C.
    [J]. INNOVATIONS IN BRIDGE ENGINEERING TECHNOLOGY, 2007, : 27 - 33
  • [8] EXPERIMENTAL STUDY AND MODELING OF REINFORCED CONCRETE BEAMS STRENGTHENED BY POST-TENSIONED EXTERNAL REINFORCING BARS
    Naghipour, M.
    Nemati, M.
    Doostdar, H. M.
    [J]. INTERNATIONAL JOURNAL OF ENGINEERING, 2010, 23 (02): : 127 - 144
  • [9] Shear Strength of Reinforced Concrete Columns with External Post-Tensioned Clamps
    Rincon, Julian D.
    Chen, Yu-Mei
    Pujol, Santiago
    Puranam, Aishwarya Y.
    Hwang, Shyh-Jiann
    [J]. ACI STRUCTURAL JOURNAL, 2024, 121 (02) : 111 - 125
  • [10] Experimental Lateral Load Response of Unbonded Post-Tensioned Precast Concrete Walls
    Perez, Felipe J.
    Pessiki, Stephen
    Sause, Richard
    [J]. ACI STRUCTURAL JOURNAL, 2013, 110 (06) : 1045 - 1055