Controllable Processing Time Scheduling with Total Weighted Completion Time Objective and Deteriorating Jobs

被引:21
|
作者
Wang, Ji-Bo [1 ]
Wang, Yi-Chun [1 ]
Wan, Congying [2 ]
Lv, Dan-Yang [1 ]
Zhang, Lei [1 ]
机构
[1] Shenyang Aerosp Univ Shenyang, Sch Sci, Shenyang 110136, Liaoning, Peoples R China
[2] Dongbei Univ Finance & Econ, Inst Econ & Social Dev, Dalian 116025, Liaoning, Peoples R China
关键词
Scheduling; deteriorating job; controllable processing time; branch-and-bound; heuristic; RESOURCE-ALLOCATION; MACHINE; COMMON;
D O I
10.1142/S0217595923500264
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper, we consider two single-machine scheduling problems with deteriorating jobs and controllable processing time. The job processing time is a function of its starting time and resource allocation. For the convex resource function, a bicriteria analysis is provided, where the first (respectively, second) criteria is to minimize total weighted completion time (respectively, total resource consumption cost). The first problem is to minimize the weighted sum of the total weighted completion time and the total resource consumption cost. The second problem is to minimize the total weighted completion time subject to the total resource consumption cost is bound. These both problems are NP-hard, we propose some heuristic algorithms and a branch-and-bound algorithm to solve the problems.
引用
收藏
页数:24
相关论文
共 50 条
  • [31] Scheduling Coflows of Multi-stage Jobs to Minimize the Total Weighted Job Completion Time
    Tian, Bingchuan
    Tian, Chen
    Dai, Haipeng
    Wang, Bingquan
    IEEE CONFERENCE ON COMPUTER COMMUNICATIONS (IEEE INFOCOM 2018), 2018, : 864 - 872
  • [32] Scheduling Precedence-Constrained Jobs on Two Resources to Minimize the Total Weighted Completion Time
    Rajneesh, R.
    Elmaghraby, S. E.
    PROCEEDINGS OF 2013 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IEEE-IESM 2013), 2013, : 592 - 598
  • [33] Scheduling jobs with release dates on identical parallel machines by minimizing the total weighted completion time
    Kramer, Arthur
    Dell'Amico, Mauro
    Feillet, Dominique
    Iori, Manuel
    COMPUTERS & OPERATIONS RESEARCH, 2020, 123 (123)
  • [34] Unrelated parallel machine scheduling with setup consideration and a total weighted completion time objective
    Weng, MX
    Lu, J
    Ren, HY
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2001, 70 (03) : 215 - 226
  • [35] Approximability of total weighted completion time with resource consuming jobs
    Kis, Tamas
    OPERATIONS RESEARCH LETTERS, 2015, 43 (06) : 595 - 598
  • [36] Parallel-machine scheduling with deteriorating jobs and rate-modifying activities to minimize total completion time
    Zhao, Chuan-Li
    Guo, Jia-Yuarn
    Hsu, Chou-Jung
    JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING, 2011, 28 (06) : 485 - 491
  • [37] Scheduling with Rejection to Minimize the Total Weighted Completion Time
    Zhang, Shu-Xia
    Cao, Zhi-Gang
    Zhang, Yu-Zhong
    OPERATIONS RESEARCH AND ITS APPLICATIONS, PROCEEDINGS, 2009, 10 : 111 - +
  • [38] Minimizing the total weighted completion time in relocation scheduling
    Su, Yi-Chen
    Lin, Bertrand M. T.
    COMPUTERS & INDUSTRIAL ENGINEERING, 2022, 173
  • [39] Minimizing the total weighted completion time in relocation scheduling
    Su, Yi-Chen
    Lin, Bertrand M.T.
    Computers and Industrial Engineering, 2022, 173
  • [40] Group scheduling with deteriorating jobs to minimize the total weighted number of late jobs
    Lee, Wen-Chiung
    Lu, Zon-Syun
    APPLIED MATHEMATICS AND COMPUTATION, 2012, 218 (17) : 8750 - 8757