Controllable Processing Time Scheduling with Total Weighted Completion Time Objective and Deteriorating Jobs

被引:21
|
作者
Wang, Ji-Bo [1 ]
Wang, Yi-Chun [1 ]
Wan, Congying [2 ]
Lv, Dan-Yang [1 ]
Zhang, Lei [1 ]
机构
[1] Shenyang Aerosp Univ Shenyang, Sch Sci, Shenyang 110136, Liaoning, Peoples R China
[2] Dongbei Univ Finance & Econ, Inst Econ & Social Dev, Dalian 116025, Liaoning, Peoples R China
关键词
Scheduling; deteriorating job; controllable processing time; branch-and-bound; heuristic; RESOURCE-ALLOCATION; MACHINE; COMMON;
D O I
10.1142/S0217595923500264
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper, we consider two single-machine scheduling problems with deteriorating jobs and controllable processing time. The job processing time is a function of its starting time and resource allocation. For the convex resource function, a bicriteria analysis is provided, where the first (respectively, second) criteria is to minimize total weighted completion time (respectively, total resource consumption cost). The first problem is to minimize the weighted sum of the total weighted completion time and the total resource consumption cost. The second problem is to minimize the total weighted completion time subject to the total resource consumption cost is bound. These both problems are NP-hard, we propose some heuristic algorithms and a branch-and-bound algorithm to solve the problems.
引用
收藏
页数:24
相关论文
共 50 条
  • [1] Total weighted completion time minimization in a problem of scheduling deteriorating jobs
    Bachman, A
    Janiak, A
    OPERATIONS RESEARCH PROCEEDINGS 2001, 2002, : 265 - 271
  • [2] Online scheduling with linear deteriorating jobs to minimize the total weighted completion time
    Ma, Ran
    Tao, Jiping
    Yuan, Jinjiang
    APPLIED MATHEMATICS AND COMPUTATION, 2016, 273 : 570 - 583
  • [3] Minimizing the total weighted completion time of deteriorating jobs
    Bachman, A
    Janiak, A
    Kovalyov, MY
    INFORMATION PROCESSING LETTERS, 2002, 81 (02) : 81 - 84
  • [4] Scheduling controllable processing time jobs in a deteriorating environment
    Oron, D.
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2014, 65 (01) : 49 - 56
  • [5] Batch Scheduling with Deteriorating Jobs to Minimize the Total Completion Time
    Miao C.
    Xia Y.
    Zhang Y.
    Zou J.
    Journal of the Operations Research Society of China, 2013, 1 (03) : 377 - 383
  • [6] Optimal properties for scheduling deteriorating jobs for the total completion time minimization
    Bachman, A
    Janiak, A
    Wajs, W
    OPERATIONS RESEARCH PROCEEDINGS 2001, 2002, : 193 - 198
  • [7] Three scheduling problems with deteriorating jobs to minimize the total completion time
    Ng, CT
    Cheng, TCE
    Bachman, A
    Janiak, A
    INFORMATION PROCESSING LETTERS, 2002, 81 (06) : 327 - 333
  • [8] Scheduling step-deteriorating jobs to minimize the total completion time
    Cheng, T. C. E.
    Kravchenko, Svetlana A.
    Lin, Bertrand M. T.
    COMPUTERS & INDUSTRIAL ENGINEERING, 2020, 144
  • [9] Two-agent scheduling of unit processing time jobs to minimize total weighted completion time and total weighted number of tardy jobs
    Wan, Long
    Mei, Jiajie
    Du, Jiangze
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2021, 290 (01) : 26 - 35
  • [10] Parallel-Machine Scheduling with Step-Deteriorating Jobs to Minimize the Total (Weighted) Completion Time
    Miao, Cuixia
    Kong, Fanyu
    Zou, Juan
    Ma, Ran
    Huo, Yujia
    ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2023, 40 (01)