Issues Encountered in the Valuation of Interim Payment Process in Construction Projects

被引:0
|
作者
Mustaffa, Nur Emma [1 ]
Nayan, Roselan [1 ]
Aminuddin, Farah Azwanee [1 ]
Judi, Siti Suhana [2 ]
机构
[1] Univ Teknol Malaysia, Fac Built Environm, Dept Quant Surveying, Skudai 81310, Johor, Malaysia
[2] Univ Teknol MARA, Fac Architecture Planning & Surveying, Dept Quant Surveying, Shah Alam 40450, Selangor, Malaysia
关键词
Valuation of interim payment; Interim payment; Malaysia; COMPETENCE; NEEDS;
D O I
10.1061/(ASCE)LA.1943-4170.0000596
中图分类号
D9 [法律]; DF [法律];
学科分类号
0301 ;
摘要
Valuation of interim payment by a quantity surveyor may be a cause of dispute for the parties involved in construction projects. Quantity surveyors as professionals must act and perform their duties in accordance with the statutes, avoid disputes, and meet the expectations of clients in evaluating interim payments. Valuation of interim payment must be made in an acceptable, reasonable, and judicious recommendation. This research seeks to enhance and enrich the process for a better and reliable payment to avoid disputes. The data were gathered through semistructured face-to-face in-depth interviews involving four types of respondents, namely, employers from the public and private sectors, contractors, and consultants. The content analysis approach was used to identify the current issues encountered by the parties involved in relation to interim payment. This research identified 10 common issues, which among others include accuracy, impartiality, justification, and guidelines that need careful consideration by a quantity surveyor in a valuation of interim payment process in order to avoid disputes.
引用
收藏
页数:10
相关论文
共 50 条
  • [1] Subcontractor trust issues on payment and valuation practices in UK private projects
    Omotayo, Temitope Seun
    Danvers-Watson, Oskar
    Oyegoke, Adekunle Sabitu
    JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2023, 28 (01) : 64 - 90
  • [2] Addressing Individual Perception: Extending the Technology Acceptance Model to the Interim Payment Method in Construction Projects
    Zhu, Lei
    Xiong, Hui
    Ning, Yan
    Lv, Miaomiao
    SUSTAINABILITY, 2023, 15 (09)
  • [3] Factors Contributing to Delay of Interim Payment in Civil Engineering Projects
    Ismail, Wan Norizan Wan
    Adnan, Hamimah
    Azmi, Wan Faida Wan Mohd
    Yusop, Norhafizah
    Isa, Siti Sarah Mat
    INTERNATIONAL JOURNAL OF TECHNOLOGY, 2023, 14 (04) : 867 - 876
  • [4] Payment options in collaborative procurement of major construction projects
    Wamuziri, Sam
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-MANAGEMENT PROCUREMENT AND LAW, 2013, 166 (01) : 12 - 20
  • [5] Process issues in course projects
    Paula, WP
    ICSE 05: 27th International Conference on Software Engineering, Proceedings, 2005, : 629 - 630
  • [6] Research on the Industry Acceptance and Promotion Path of Interim Payment in Civil Engineering Projects
    Zhu, Lei
    Xiong, Hui
    PROCEEDINGS OF THE 17TH EAST ASIAN-PACIFIC CONFERENCE ON STRUCTURAL ENGINEERING AND CONSTRUCTION, EASEC-17 2022, 2023, 302 : 1116 - 1132
  • [7] The enterprise integration issues encountered with agile process introduction
    Rogers, KJ
    Whitman, L
    Underdown, DR
    FLEXIBLE AUTOMATION AND INTELLIGENT MANUFACTURING, 1998, 1998, : 51 - 59
  • [8] Delayed Payment Problems in Public Construction Projects: Subcontractors' Perspectives
    Enshassi, Adnan
    Abuhamra, Lina
    ICCREM 2015: ENVIRONMENT AND THE SUSTAINABLE BUILDING, 2015, : 567 - 575
  • [9] Sustainability issues in the valuation process of project developments
    Froech, Georg
    ENERGY AND BUILDINGS, 2015, 100 : 2 - 9
  • [10] Issues in Managing Construction Phase of IBS Projects
    Jabar, Izatul Laili
    Ismail, Faridah
    Mustafa, Arniatul Aiza
    AMER (ABRA MALAYSIA) INTERNATIONAL CONFERENCE ON QUALITY OF LIFE, AICQOL2013, 2013, 101 : 81 - 89