Dynamic estimation and reliability control of quality assurance for bored piles

被引:0
|
作者
赵文艺 [1 ]
徐志军 [2 ]
郑俊杰 [1 ]
边晓亚 [1 ]
机构
[1] School of Civil Engineering & Mechanics, Huazhong University of Science and Technology
[2] School of Civil Engineering and Architecture, Henan University of Technology
基金
中国国家自然科学基金;
关键词
bored piles; quality assurance inspection; reliability control; occurrence probability; Bayesian method;
D O I
暂无
中图分类号
TU753.3 [桩基、打桩工];
学科分类号
081401 ;
摘要
A systematic method was proposed to estimate the occurrence probability of defective piles(OPDP) from a site according to quality assurance inspection. The OPDP was firstly suggested as the criterion to weight the performance of a pile foundation. Its prior distribution and updating distribution were deduced to follow Beta distributions. To calibrate the OPDP, a dynamic estimation model was established according to the relationships between prior mean and variance and updating mean and variance. Finally, a reliability-control method dealing with uncertainties arising from quality assurance inspection was formalized to judge whether all the bored piles from a site can be accepted. It is exemplified that the OPDP can be substantially improved when more definite prior information and sampling formation become available. For the example studied herein, the Bayesian estimator of updating variance for OPDP is reduced from 0.0037 to 0.0014 for the first inspection, from 0.0014 to 0.0009 for the second inspection, and with less uncertainty by incorporating experience information.
引用
收藏
页码:1148 / 1157
页数:10
相关论文
共 50 条
  • [31] Estimation of load-bearing capacity of bored piles using machine learning models
    Binhl, Pham Thai
    Nguyenl, Dam Duc
    Buil, Quynh-Anh Thi
    Nguyen, Manh Duc
    Vu, Thanh Tien
    Prakash, Indra
    VIETNAM JOURNAL OF EARTH SCIENCES, 2022, 44 (04): : 470 - 480
  • [32] QUALITY ASSURANCE AND CONTROL
    SCOTT, A
    ENGINEERING, 1981, 221 (03): : 216 - &
  • [33] A case study of rock socketed piles: Design, control and construction of bored piles for a bridge foundation in southeast Brazil
    de Mello, LG
    Bilfinger, W
    Mendes, AS
    Fontes, RS
    DEEP FOUNDATIONS ON BORED AND AUGER PILES, 2003, : 373 - 377
  • [34] QUALITY CONTROL AND QUALITY ASSURANCE.
    Burgess, N.T.
    Proceedings - IEEE Computer Society Conference on Pattern Recognition and Image Processing, 1979, (pt 2): : 215 - 235
  • [35] QUALITY-CONTROL AND QUALITY ASSURANCE
    MORLEY, M
    MATERIALS PERFORMANCE, 1993, 32 (11) : 39 - 41
  • [36] QUALITY-CONTROL AND QUALITY ASSURANCE
    LAESSIG, RH
    EHRMEYER, SS
    HASSEMER, DJ
    CLINICS IN LABORATORY MEDICINE, 1986, 6 (02) : 317 - 327
  • [37] Quality assurance, quality control and accreditation
    Engelfriet, CP
    Reesink, HW
    de Lange, GG
    Flanagan, P
    Solheim, BG
    Akerblom, O
    Messeter, L
    James, V
    Bruce, M
    O'Riordan, J
    Murphy, W
    Schönitzer, D
    Mayr, WR
    Henn, G
    L'Herminez, P
    Kühnl, P
    Kluge, A
    Mozzi, F
    Rebulla, P
    Sirchia, G
    Carbonell-Uberos, F
    Medgyesi, G
    Pisacka, M
    Letowska, M
    Gustafson, M
    Ganz, P
    Rees, JW
    Décary, F
    Wendel, S
    Almeida, PTR
    Lin, CK
    Tadokoro, K
    VOX SANGUINIS, 2000, 79 (04) : 253 - 264
  • [38] International quality control quality assurance
    Gallagher, MJ
    INTERNATIONAL JOURNAL OF RADIATION ONCOLOGY BIOLOGY PHYSICS, 1996, 34 (04): : 965 - 967
  • [39] QUALITY ASSURANCE AND OR QUALITY-CONTROL
    DIAMOND, I
    ARCHIVES OF PATHOLOGY & LABORATORY MEDICINE, 1986, 110 (10) : 875 - 876
  • [40] Quality assurance and quality control procedures
    Pandit, Shirish S.
    Indian Concrete Journal, 2000, 74 (06): : 359 - 365