Dynamic estimation and reliability control of quality assurance for bored piles

被引:0
|
作者
赵文艺 [1 ]
徐志军 [2 ]
郑俊杰 [1 ]
边晓亚 [1 ]
机构
[1] School of Civil Engineering & Mechanics, Huazhong University of Science and Technology
[2] School of Civil Engineering and Architecture, Henan University of Technology
基金
中国国家自然科学基金;
关键词
bored piles; quality assurance inspection; reliability control; occurrence probability; Bayesian method;
D O I
暂无
中图分类号
TU753.3 [桩基、打桩工];
学科分类号
081401 ;
摘要
A systematic method was proposed to estimate the occurrence probability of defective piles(OPDP) from a site according to quality assurance inspection. The OPDP was firstly suggested as the criterion to weight the performance of a pile foundation. Its prior distribution and updating distribution were deduced to follow Beta distributions. To calibrate the OPDP, a dynamic estimation model was established according to the relationships between prior mean and variance and updating mean and variance. Finally, a reliability-control method dealing with uncertainties arising from quality assurance inspection was formalized to judge whether all the bored piles from a site can be accepted. It is exemplified that the OPDP can be substantially improved when more definite prior information and sampling formation become available. For the example studied herein, the Bayesian estimator of updating variance for OPDP is reduced from 0.0037 to 0.0014 for the first inspection, from 0.0014 to 0.0009 for the second inspection, and with less uncertainty by incorporating experience information.
引用
收藏
页码:1148 / 1157
页数:10
相关论文
共 50 条
  • [1] Dynamic estimation and reliability control of quality assurance for bored piles
    Zhao Wen-yi
    Xu Zhi-jun
    Zheng Jun-jie
    Bian Xiao-ya
    JOURNAL OF CENTRAL SOUTH UNIVERSITY, 2014, 21 (03) : 1148 - 1157
  • [2] Dynamic estimation and reliability control of quality assurance for bored piles
    Wen-yi Zhao
    Zhi-jun Xu
    Jun-jie Zheng
    Xiao-ya Bian
    Journal of Central South University, 2014, 21 : 1148 - 1157
  • [3] Impact of routine quality assurance on reliability of bored piles
    Zhang, LM
    Li, DQ
    Tang, WH
    JOURNAL OF GEOTECHNICAL AND GEOENVIRONMENTAL ENGINEERING, 2006, 132 (05) : 622 - 630
  • [4] Advancement and execution of quality assurance in bored cast in-situ piles
    Rahman, D. Zunaithur
    Sirajudeen, K.
    Ali, R. Nasar
    Muthumari, G.
    Alagumurugan, G.
    Vani, E.
    Kumar, P. Sathees
    Sivaranjani, S.
    MATERIALS TODAY-PROCEEDINGS, 2021, 37 : 2083 - 2088
  • [5] Probabilistic analysis of integrity inspection and dynamic evaluation of quality for bored piles
    Xu, Zhi-Jun
    Zheng, Jun-Jie
    Bian, Xiao-Ya
    Zhao, Dong-An
    Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2012, 34 (01): : 151 - 157
  • [6] Estimation of Settlements of Bored Piles Foundation
    Gabrielaitis, Linas
    Papinigis, Vytautas
    Zarzojus, Gintaras
    MODERN BUILDING MATERIALS, STRUCTURES AND TECHNIQUES, 2013, 57 : 287 - 293
  • [7] Polish experience of dynamic tests for bored piles
    Gwizdala, K.
    Brzozowski, T.
    Blockus, M.
    APPLICATION OF STRESS-WAVE THEORY TO PILES: SCIENCE, TECHNOLOGY AND PRACTICE, 2008, : 183 - 187
  • [8] Quality assurance of bored pile foundations
    Cameron, Gordon
    Chapman, Tim
    Ground Engineering, 2004, 37 (02): : 35 - 40
  • [9] Reliability Analysis of Shaft Resistance of Axially Loaded Bored Piles
    Park, Jae Hyun
    Park, Chul Soo
    Chung, Moonkyung
    GEOTECHNICAL SAFETY AND RISK V, 2015, : 300 - 305
  • [10] Comparing dynamic and static test results of bored piles
    Long, Michael
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-GEOTECHNICAL ENGINEERING, 2007, 160 (01) : 43 - 49